Discussion Points API RP 17A Task Group Members

Slides:



Advertisements
Similar presentations
SC 17A Task Force Summer Meeting Presentation June 2013.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
API Subcommittee 17 Industry Standards for Subsea Equipment
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
Welcome to the San Bernardino County Coach Quarterly Meeting.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Kent Grebing, API SC 16 Chair
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Date: Sept. 7, 2011 Time: 9am PDT Call in number: Participant code: # 1.
RF Tracker Update April Other Oversight Activities: RF Monitoring  RF Monitoring Update –RF Tracker was opened for data entry on October.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
NERC Alerts Training Responding to Alerts September 22, 2009.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
1 API17Z Bonded Composite Pipe Progress report API conference June 2015.
San Francisco, CA. SC8 Liaison Report
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
API SPEC Q2 FOR AUDITING API MONOGRAM PROGRAM BOARD UPDATE TO SC16 Stacey W. Hagen ExxonMobil Development Company API Monogram Program Board Liaison to.
Production EVM Working Group Outbrief August 2010 PMSC.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
TG Chair: Darren Bane (BHI)
2017/2018 Emergency Solutions Grant Overview
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group Status January ,11, 2017
API 17X Subsea Boosting January 13, 2015
API SC 10, Work Group 3 Update:
Task Group 19LH Liner Hanger Equipment
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Standards Development: An Overview
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
API 17X Subsea Boosting August 27, 2015
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Specification on float equipment
International Subsea Standardization
First 8 slides are what was presented in San Fransisco…
RAISING PERFORMANCE. TOGETHERTM
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 17H TASK GROUP January 15, 2013.
API Summer Standardization Conference
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Specification on float equipment
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 17H ROV/ROT Interfaces
TGaj Editor Report for CC22
November 2018 Opening Report
TGaj Editor Report for LB220
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Task Group Status January 2013
Calendar Overview – Phase I – REVISED April 2019
Status report for revision of API 17F
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
API 17P TASK GROUP June 26, 2013.
TGaj editor report for Sponsor Ballot
Presentation transcript:

Discussion Points API RP 17A Task Group Members Over Fifty people on distribution list. The list includes the Work Group Chair for each of the other API 17 series documents. updated TARGET DATES FOR DELIVERABLES The document was sent out for comments in June with a July 31st due date. Representatives from the following companies have responded with comments: Astrimar ExxonMobil Shell BP IntecSea Statoil BG-Group OneSubsea Total Currently reviewing the comments received. It is anticipated that the document will be revised and sent out one more time for review and then submitted for release late this year. MAJOR ISSUES We would appreciate if the Task Group Chairs would provide feedback on the document since it describes all SC 17 documents and gives specific references to certain ones in the text of the document. Also if their document references 17A, then we want to make sure that all conflicts are addressed. (Four have responded.) API RP 17 A – Summer 2015 Update

Discussion Points TR13 - General Overview of Subsea Production Systems updated TARGET DATES FOR DELIVERABLES Dave Wilkinson updated the document prior to the June meeting, which addressed 80% of the comments. MAJOR ISSUES There were 10 comments from one person and an additional 2 from another which were addressed by emails to authors late last month. As soon as we receive responses on these, we are hopeful that it can move forward for release. TR14 - Flow Assurance It is the recommendation based on the comments received that this document is withdrawn and not released. It was discovered that there are already excellent references on flow assurance available to the industry and providing another one provides minimum value. API RP 17 A – Summer 2015 Update