Workshop for Local Legislators and Participating Officials May 7, 2008 City of Las Cruces Doña Ana County Do ñ a Ana MDWCA Town of Mesilla Anthony WSD.

Slides:



Advertisements
Similar presentations
J2 Regulating Reservoir Project
Advertisements

Irrigation Water Conveyance
Water in the West: Current Use and Future Challenges Christopher Goemans, Ph.D. Agricultural and Resource Economics 13 th Annual Farmers Cooperatives Conference.
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Integrating Water Management The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – WATER RESOURCES May 19, 2005.
A History of the Gila River Basin in New Mexico Events, Adjudications and Limitations Presented by: Tink Jackson District 3 Manager, OSE NM Gila River.
LRGWUO New Mexico Lower Rio Grande Regional Water Plan Presentation to the Interstate Stream Commission: July 21, 2004 Lower Rio Grande Water Users Organization.
CAP CAVSARP: Clearwater Facility. CAP (Central Arizona Project) In 1980, Arizona overdraft: 2.5 million acre feet year (afy) groundwater deficit due to.
Thomas C. Turney, P.E. 1 Agreement Between Interstate Stream Commission and the Holder of OSE Permit RG Middle Rio Grande Conservancy District July.
AWRA Annual Meeting: 2011 Albuquerque, NM Session: New Water Resources of NM and Obstacles to their Development 1:30 – 3:00 Monday, Nov 7 ”Economic Costs.
Lower Rio Grande Water Users’ Organization Who are we? Where to get more information: 1 Organization The City of Las Cruces*
Active Water Resource Management in the Lower Rio Grande TOOLS FOR A NEW ERA IN WATER MANAGEMENT presented by Peggy Barroll, Hydrologist New Mexico Office.
Overview History of the PDWG Three Steps to Renewable Water –Efficient Use –Sustainable Use –Reliable Use Conclusions.
1. 2 Montlhy and biannually, USA provides information about forecast and status of Colorado River Basin. Since 2000, drought in the basin caused low levels.
10 th Conference on Applied Infrastructure Research “Institutional Models in Infrastructure Sectors – Conceptual Issues and Empirical Evidence” Friday,
Responses to the New Normal Creative Partnerships for Innovative Water Solutions Colorado Water Workshop – July 17, 2013.
Restoration of the Rio Grande Between El Paso, Texas and Ciudad Juarez, Chihuahua Restoration of the Rio Grande Between El Paso, Texas and Ciudad Juarez,
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
Water Resources Issues in the Lower Rio Grande June 3, 2005 J. Phillip King, P.E. Assc. Professor/Assc. Dept. Head Dept. of Civil Engineering, NMSU Consultant,
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Historical Water Management in the Lower Rio Grande Lower Rio Grande Water Users Organization August 19, 2005 J. Phillip King, P.E., Ph.D.
Dr. M. Karl Wood Director Water Resources Research Institute New Mexico State University Water Quality Research by New Mexico state university.
Farm Size, Irrigation Practices & On-Farm Irrigation Efficiency Rhonda Skaggs Agricultural Economics & Zohrab Samani Civil Engineering New Mexico State.
Active Water Resource Management in the Lower Rio Grande
New Mexico Texas Water Commission Update for Good Neighbor Environmental Board June Bobby Creel & John Burkstaller New Mexico Water Resources Institute.
Drought and the Central Valley Project August 2014.
1 Statewide Water Supply Initiative Gunnison Water Workshop July 29, 2005.
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
How Much Do We Have Left? Coming to Terms With the Colorado River Water Availability Study Annual Colorado Water Workshop July 21, 2010 Ben Harding – AMEC.
NRCS Watershed Rehabilitation
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
Stockholm World Water Week Session: Hydroeconomic Modeling in Basins: Practice, Challenges and Rewards August 22, Watershed Policy Analysis.
Dam Hazard Consequences Assessment
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
Water Administration and Law in New Mexico Border Governors October 21, 2005 Marilyn C. O’Leary Utton Transboundary Resources Center University of New.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
Modeling Impacts of Policy Responses to Prolonged and Severe Drought in the Upper Rio Grande River Basin Dr. James F. Booker, Siena College Douglas T.
Colorado River Sustainability, Drought Response & Central Arizona Project Urban Water Institute August 27, 2015.
Jason King, P.E. State Engineer WSWC/NARF Symposium on the Settlement of Indian Reserved Water Right Claims August 25-27, 2015 Pyramid Lake Paiute Tribe’s.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Concepts and Methods for Assessing and Evaluating Water System Response to Climate Change Capacity Building Programme on the Economics of Climate Change.
April 27, 2011 So. Cal. Water Dialogue Southern California Water Dialogue April 27, 2011 The Colorado River: Partnering for success Bill Hasencamp Manager,
LRGWUO Lower Rio Grande Regional Water Plan Presentation Prepared by: n Terracon n Livingston & Associates n John Shomaker & Associates n Zia Engineering.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
Challenge Grant Program Water 2025: Preventing Crises and Conflict in the West Eligible applicants are irrigation and/or water districts in the western.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Watershed Restoration Overview for the Klamath Basin.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
Special Water Users Associations in Southern New Mexico Sunday, January 03, 2016 Elephant Butte Irrigation District.
FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council.
Agency Proposal Title Proposal Focus EBID Flow Metering and Data Collection Project Flow measurement at EBID’s canals and turnouts (water delivery system).
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Regionalism in Water Resources Management
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Impacts of Salinity on El Paso’s Surface Water Supply presented at the Annual Salinity Management and Desalination Summit December 8, 2003 Michael P. Fahy.
Present and Future Water Supplies to Meet El Paso Demands Presentation to NM-TX Water Commission August 20, 2004 by Michael Fahy El Paso Water Utilities.
Scarcity on the Upper Rio Grande Valley (WORK IN PROGRESS) GIS FOR WATER RESOURCES, FALL
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
New Mexico Universities Working Group on Water Supply Vulnerabilities: The Lower Rio Grande Presented to the Paso del Norte Watershed Council Phil King.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
2018 Kern County Water Summit
Nebraska Water Infrastructure Funding and Financing Programs
Brooke McGregor, Program Liaison, Watermaster Section
Mutually Beneficial Partnerships in Groundwater Banking Paul Weghorst Irvine Ranch Water District August 15, 2019.
Presentation transcript:

Workshop for Local Legislators and Participating Officials May 7, 2008 City of Las Cruces Doña Ana County Do ñ a Ana MDWCA Town of Mesilla Anthony WSD Village of Hatch New Mexico State University Elephant Butte Irrigation District

The Rio Grande Project Settlement of 2008

The Rio Grande Project New Mexico: Elephant Butte Irrigation District (EBID) 90,640 acres (57%) El Paso County Water Improvement District No. 1 (EPCWID) 69,010 acres (43%) Mexico 60,000 AF

Compact NM Compact TX 1938 – The Rio Grande Compact Otowi Apportions the water of the Rio Grande among Colorado, New Mexico, and Texas –Federal government operated the Rio Grande Project as a single unit –Entire Rio Grande Project included in Texas –No provision for apportioning water within the Rio Grande Project

Irrigation Hydrologic Cycle: Plan View Reservoir Rio Grande Release/Diversion Diversion Main Canals Laterals Conveyance/Distribution Deliveries Delivery (Farm Turnout) Drains Return Flows Downstream Users

Post-Compact Problems – Persistent recurring drought –Rio Grande Project farmers respond to short water supply by developing groundwater pumping capacity –D1 and D2 curves developed for future allocation to EBID, EPCWID, and Mexico Release 600 kAF D2 - Divert 713 kAF D1 - Deliver 393 kAF

Post-Reclamation – Districts pays off construction loans –Reclamation contractually obligated to develop allocation and operating plan for Project 1980 – City of El Paso applied for groundwater well permits in New Mexico portion of Mesilla Bolson –State of New Mexico denies application –Ensuing lawsuit by El Paso dismissed in – Full allocations to EBID, EPCWID, and Mexico 1997 – 2001 Reclamation files Quiet Title Suit –EPCWID files cross claim –Trilateral negotiations begin in 1998, collapse in 2000 –Suit dismissed in 2001 –EBID files suit in Federal District Court in Albuquerque

Groundwater Diversion/Conveyance Drainage ReturnFlow Seepage Well CropWaterUse Irrigation CanalField Drain RioGrande Problem: Release to diversion hydrology altered by groundwater pumping in New Mexico

Return of Drought 2003 – After 24 years of full supply, drought returns 2003 – 2006 – Reclamation employs ad hoc allocation method –Mexicos allocation based on usable water in Project storage –Remaining diversion divided between EBID and EPCWID in 57%/43% proportions, respectively

Visualizing Groundwater Impacts

Dangers of Groundwater Depletions of Surface Water Kansas v. Colorado on the Arkansas River Texas v. New Mexico on the Pecos River –$15M settlement, $180M compliance cost Rio Grande much higher value resource

Escalating Tensions 2006 – (April) EBID proposes D3 allocation method, tying EPCWID and Mexico allocations to Project Release, based on D1/D2 Inconsistent implementation by U.S. Bureau of Reclamation 2007 – EPCWID files suit in federal district court in Texas based on Reclamations allocation and carryover issues Litigation appears inevitable

February 14, 2008 January 2008 – Last-ditch attempt to negotiate allocation and operating agreementJanuary 2008 – Last-ditch attempt to negotiate allocation and operating agreement –Mediated by Texas Compact Commissioner Pat Gordon –Major issues addressed January 21 and 22 –Details worked out January 23 to February 13

Highlights of the Agreement Annual Allocation based on D3 procedure (D1 basis for Mexico allocation, D2 basis for El Paso #1 allocation) level of groundwater pumping grandfathered in EBID benefits from Project supply in excess of D2 level if release is greater than 600 kAF Carryover equal to 60 percent of a full allocation may be accumulated by each district (306 kAF for EBID, 233 kAF for EPCWID) Excess carryover goes into account of other district Mexicos allocation based on actual release

Key Points of Compromise EPCWID wanted and got carryover, protection from impacts of excessive groundwater pumping in New Mexico EBID wanted and got D3 as basis for allocation of Project Water regardless of origin, and accountability from Reclamation EBID and EPCWID dismiss their lawsuits Reclamation will conduct an internal review of the operations of the El Paso Field Office under the Managing for Excellence program Allocation and operating procedures are specifically codified, subject to change by consensus agreement

Benefits Massive court, settlement, and compliance costs avoided Cost to State of New Mexico: $0.00 Potential for LRG to develop innovative conjunctive management of water resources Resources can be focused on improving productivity rather than litigation Local solution to local problem LRG water supply is as certain as it can be

Whats Next? Negotiations with State of New Mexico over conjunctive management of surface water and groundwater Continuing coordination among water use sectors –Protect existing equities and beneficial use –Plan for and support economic development and changing use Storm water management and capture –Address existing flood control deficiencies –Take advantage of opportunity for new water

LRGWUOs Flood – Related Initiatives Need continued Dam Safety – Pilot Project –Training, inspection, inundation mapping, emergency response planning –Building local organizational and institutional infrastructure Need an Early Warning System –National Weather Service NEXRAD –Upper watershed and flow instrumentation Pilot project in Placitas (Hatch), Rincon, and Picacho Arroyos

Need a Storm Water Capture and Use program –Controlled release from dams to river, canals, drains, Municipal &Industrial treatment –Offset release from Caballo Reservoir –Infiltration for aquifer recharge –Environmental enhancements for river restoration –Water quality enhancements – E. Coli mitigation –Sediment management –Redesign of flood control infrastructure –Institutional/legal implications Need an Aquifer Storage and Recovery program LRGWUOs Flood – Related Initiatives Continued…

Municipal and Industrial Surface Water Treatment Initiatives Village of Hatch – Rincon Valley Doña Ana Mutual Domestic Water Consumers Association – North Valley City of Las Cruces Mesquite Mutual Domestic Water Consumers Association – South Valley

Wastewater Reclamation and Reuse Initiatives City of Las Cruces Doña Ana Mutual Domestic Water Consumers Association – North Valley Village of Hatch – Rincon Valley Doña Ana County

Funding Requests

Questions?