Conceptual Design of the Central Process Systems

Slides:



Advertisements
Similar presentations
Emerado Public School: Energy Audit & Energy Conservation Alternatives Undergraduate Thesis Mechanical Engineering Kristin McKenzie March 15th, 2007.
Advertisements

Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
ESS Cooling and Heat Recovery system Thomas Hjern
BRC Storage & Distribution Safety and Quality Management System Training Guide
RETScreen® Energy Efficiency Projects
ENVIRONMENTAL MANAGEMENT PLAN
Integrated and Intelligent Building Certification for Designers and Installers: The Industry’s Path Forward for Credibility.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Overview of Energy Efficiency & Renewable Energy (Draft version) Prepared by Natural Resources Canada in association with Indian and Northern Affairs Canada.
Adsorption Refrigeration System. INTRODUCTION  Adsorption refrigeration system uses adsorbent beds to adsorb and desorb a refrigerant to obtain cooling.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Regional Workshop MICRODATA ACCESS IN EUROPEAN COUNTRIES – COOPERATION BETWEEN NATIONAL STATISTICAL INSTITUTES AND DATA ARCHIVES 2nd Regional Workshop.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Paul Henry with thanks to co-reviewers: Wolfgang Hees, Karin Rathsman, Peter Rådahl, Mats Lindroos Review of TDR Chapter 7 “Conventional Facilities”
8 th Address Policy SIG Report Takashi Arano Yong Wan Ju Kenny Huang Chair/co-Chairs of APNIC Address Policy SIG.
EAUC-Scotland Campus Sustainability Programme 21 November 2007
Principal Investigator ESTCP Selection Meeting
HVAC Replacement Case Study
Town Road Improvement Project Plan
Student Activities Centralized Training
Session objectives After completing this session you will:
Dr. Alem Tesfai Renewable Energy Consultant, CIBSE
PLWG Review 6.9 and the Interconnection process
The Data Center Challenge
Performance monitoring framework for the technical infrastructure
Monitoring the State of Conservation of World Heritage Properties
The revised Periodic Reporting Questionnaires: general features Alessandra Borchi Policy and Statutory Meetings Section UNESCO World Heritage Centre.
Principal Investigator ESTCP Selection Meeting
GREENHOUSE GAS EMISSIONS INVENTORY
Development Projects / Analysis Projects / On-site Service Projects
LCLS Linac Technical Design Review Charge
Overview of the FEPAC Accreditation Process
MnDOT Office of Civil Rights Targeted Group Business and Veteran-Owned Small Business Programs Special Provisions Updates March 2017.
10 Stages Of the Engineering Design Process
Roles and Responsibilities COC & District
Southern Sierra IRWMP Update
Case Study: Water Based PU
A Design Process.
8th Grade Matter and Energy in Organisms and Ecosystems
Accelerator Safety Workshop SLAC
Coordinate Operations Standard
Technical Communication: Strategies for College and the Workplace by Dan Jones & Karen Lane Chapter 16 Proposals Copyright © 2002 by Pearson Education,
Senate Meeting Summary
NERC Reliability Standards Development Plan
Principal Investigator ESTCP Selection Meeting
NERC Reliability Standards Development Plan
Review of TDR Chapter 11 “Safety”
TECHNOLOGY ASSESSMENT
Welcome to the CSBM operational workshop:
International Training Centre of the ILO
PSS verification and validation
Björn Eldvall ESS P&ID.
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Using State and Local Data to Improve Results
Principal Investigator ESTCP Selection Meeting
Roles and Responsibilities
Director, CPF Financial Services Limited
Alternative Approach to UN R13 Type-IIA for Battery Electric Vehicles
Presentation transcript:

Conceptual Design of the Central Process Systems Review of the Conceptual Design of the Central Process Systems - Charge and planning - 12 February 2019, Lund Roland Garoby https://indico.esss.lu.se/event/934/

Review purpose The main purpose of the review is to scrutinize and optimize the design of the “Central Process System” (CPS) that is proposed by the selected contractor. The CPS design has to allow ESS facility to operate reliability and to fulfil its commitments to the authorities, especially in terms of sustainability and heat recovery. Optimization is concerning: Costs of construction and operation*, Design principles in view of sustainability, Practical implementation in view of maximizing reliability and minimizing complexity and maintenance efforts. * Qualitatively, on the basis of the technical design

Planning 1st Review on November 14-15, 2017. Presentation of ESS needs and required cooling systems. Explanation of E.ON energy strategy (“Ectogrid”) and preliminary plans for the Central Processing System (CPS) at ESS. 2018: Re-baselining of the whole ESS project. Revisiting the cooling systems for simplifying and optimizing the CPS. New version summarized in ESS-0508287. 2nd Review on February 12-13, 2019 to analyze the Preliminary Design submitted by the contractor. Overview schedule of implementation to be presented by E.ON on February 12, 2019.

Review charge Are the Contractor’s responses to the questions from the first review satisfying? Are the ESS revised requirements meeting ESS needs and likely to simplify the CPS design and its construction and operations costs? Analyze the CPS design proposed by the Contractor: Is the information communicated sufficiently complete to allow judging the proposal? Is the design in-line with ESS requirements? Is it addressing ESS need for reliability and availability? Is it correctly sized and cost effective (construction)*? Is it properly minimizing cost of operation and maintenance*? More generally, the Committee is encouraged to provide comments and suggestions for improvement on all matters it judges relevant. * Qualitatively, on the basis of the technical design

Thank you for being here. We look forward to your advice!

Reminder from first review (1/2) - Requests Present a Failure Analysis that explicitly demonstrates the redundancy of all systems including cooling, water treatment and compressed air. (No single point of failure within the CUB systems should disturb the ESS operation.) Show explicitly how the quality of the water is monitored, what happens if the quality requirements aren’t met and how redundancy is met. The subcontracting engineers responsible for the water quality system design should attend. E.ON should make a decision on the possible implementation of the “ectogrid”. Determine which part of the Central Process Systems needs to be attached to the backup generator. A restart strategy should also be developed. Provide the characteristics of the rejected water and inform ESS of the needs for draining. Describe the noise environment. Provide details on the optimization of electricity consumption. Describe a preliminary plan for operation, maintenance and troubleshooting. Exploit the ESS replies to the questions listed in the section below (“Questions to ESS”).

Reminder from first review (2/2) - Recommendations E.ON should take note of the ESS PLC and EPICS standards and is encouraged to apply them. ESS and E.ON should work together to optimize any interlocks. Interlocks should be minimized if possible. Examine the possibly of using the 80 C heat to produce the chilled water. Examine decoupling the production of temperature from the distribution of the water. Consider the use of double walled heat exchangers between the ESS and the external circuits.