MPRN Creation Workgroup MPRN Creation Scenarios

Slides:



Advertisements
Similar presentations
Set Based Search Modeling Examples II
Advertisements

Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Lesson 23 AC Source Tx AC Thèvenin
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
MPRN Creation Workgroup Tuesday 27 th March 2012.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
ADDED VOCABULARY…. BATTERY CHANGES CHEMICAL ENERGY INTO ELECTRICAL ENERGY SOLAR CELL CHANGES SOLAR ENERGY INTO ELECTRICAL ENERGY INSULATOR Covers.
DN Emergency Procedures – Theft of Gas Simon Trivella –15 th June 2009 Review Group 0245 – Theft of Gas arrangements.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.
IPv6 Renumbering, scenarios & requirements Christian Huitema draft-huitema-ipv6-renumber- 00.txt.
Meiosis Creation of Gametes. Reviewing mitosis… Why? – To replace cells that have been lost or were old, and so that.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
The U.S. Constitution Christian Abueg Aaron Magaziner.
Binary Numbers Practice.
SAHV Annual Review… Overview of Changes.. Section 2 Changes Definition of “Disconnection Point” Change = Removal of the word “total”. Disconnection Point.
IGT and Shipper Workgroup meeting 28 th February 2011.
Gas Regional Initiative North West Region - Short Term Capacity RCC Meeting Den Haag – 21 September 2010.
Plot Diagram.
Objectives: To find inverse functions graphically & algebraically.
11.1 Polar Coordinates.
3D MAN– HOUSE.
Calculating Percent Change
Why Your Guests Would Love Luxury Wedding Transportation?
FINDING INVERSES OF LINEAR FUNCTIONS
Graphs and Models.
خطوات البحث العلمي.
CAP105 – National Grid’s name change
University of Wisconsin at Madison BMU Alignment Corrections
The following slides show just how this transformation took place.
Dynamic Equilibrium What does mean?
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
iGT Agency Services Background
12 Further mathematics Seasonal Indicies.
Potential Nexus Topic: Universal Single Meter Point Supply Points
Summary of a MAP portfolio
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Find My Supplier Xoserve has launched a new online version of the M Number helpline This free to use service enables gas consumers to retrieve data online.
Strip me.
Automatic safety insulation switch
DSC Change Committee Summary – 9th May
MOD National Grid NTS Initiated Flow Swaps
Industry Shipperless & Unregistered Working Group
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Industry Shipperless & Unregistered Working Group
Shipperless and Unregistered Workgroup
Proposals to be Reviewed
Connections & Registration
AUG Query Responses 21st November 2013.
UIP Project Lifespan NG UIP
Development modification group 194
Development modification group 194
M Number Creation process
Development modification group 194
Find My Supplier Xoserve has launched a new online version of the M Number helpline This free to use service enables gas.
Development modification group 194
Burtonwood Road, Great Sankey.
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Nexus Workgroup Read Validation Scenarios
Calculating Percent Change
Transmission Workstream, 1 Mar 07
Development modification group 194
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

MPRN Creation Workgroup MPRN Creation Scenarios Lee Jackson

Scenario A House Gas Main ECV Removed Service Altered Service laid at same point on the main (Alteration of service, Service replacement & Capacity increase) Existing MPRN should be used

Scenario B Old service disconnected and new service fitted at a different location in the gas main Existing MPRN should be used and old service isolated

Scenario C ECV Removed Service New Service House Gas Main 1 Gas Main 2 Old service disconnected and new service fitted at different main. Existing MPRN should be used and old service isolated

Scenario D Additional service fitted at different points in same gas main. New MPRN should be created

Scenario E House converted to flats old service removed and additional services fitted at different points in the same gas main 3 New MPRNs should be created Further discussion needed regarding isolation of old service

Scenario F House converted to flats and existing service changed to flat 1 and additional services fitted at different points in the same gas main. 3 new MPRNs should be created Address amendment would be required for original MPRN to reflect ‘flat 1’. How should this be actioned?

Scenrio G New service laid at any point on the main (New Development – Could be a plot addess) New MPRN should be created