India Electricity – 2006 Session – II Renovation & Modernisation Presented by: M.R. Ganesan / GM / SSBG Bharat Heavy Electricals Ltd.

Slides:



Advertisements
Similar presentations
Welcome.
Advertisements

Improving Efficiency & Reliability
1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
PRESENTATION OF INDUSTRIAL TRAINING ON
THERMAL POWER PLANT.
SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation.
New Generation Strategy
SURATGARH SUPER THERMAL POWER STATION
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
1 EGTEI – 22 November 2011 Nadine ALLEMAND – EGTEI secretariat Pilot Study on Cost Analysis applied to the Apatity Power station Preliminary results Cooperation.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
Pressurized Oxy-Combustion An Advancement in in Thermal and Operating Efficiency for Clean Coal Power Plants June 20, 2012.
DETAILS OF CALCULATIONS:
“Energy Efficiency Guide for Industry in Asia”
POWER GENERATION TECHNOLOGIES
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
STUDY OF BOILER’S ACCESSORIES
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
Presentation Title A holistic view of energy efficiency improvement in power generation. New technology, renovation & modernization and process improvement.
by Mr. V.S. Verma Member (Planning) Central Electricity Authority
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Indian Power Sector- Clean Coal Technologies V.S. VERMA MEMBER, CERC 1.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Page 1 May 08 Energy – Fossil Power Generation 700°C Steam Turbine for highest efficiency Energy – Fossil Power Generation 700°C Steam Turbine – Challenges.
STEAM TURBINE POWER CYCLES. The vast majority of electrical generating plants are variations of vapour power plants in which water is the working fluid.
AIM :- TO STUDY ABOUT STEAM POWER PLANT
Presentation of Energy Efficient Renovation & Modernization (R&M) By H.S.Bedi Sr. Vice President (Power Engineering and Energy Services)
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Welcome PRESENTATION BY ASHISH MISHRA.
Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC.
STEAM POWER PLANTS.
ENERGY EFFICIENCY IN THERMAL UTILITIES AND SYSTEM
Perform Achieve And Trade (PAT) Mechanism
CARBON EMMISION FROM COAL BASED THERMAL POWER PLANTS
Energy Management and Planning MSJ0210 Energy generation 2 Eduard Latõšov.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
Thermal Power Station.
KOTA SUPER THERMAL POWER STATION ,KOTA
THERMAL POWER PLANT.
WELCOME Project Electric Power Plant. Electric Power Plant Electric Power Plant.This is the age of Technology. In this age there is no place where we.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
SURATGARH SUPER THARMAL POWER STATION
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
Seminar Report On KOTA SUPER THERMAL POWER STATION Submitted in partial fulfilment for the Award of degree of BACHELOR OF TECHNOLOGY In Electrical Engineering.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
CERTIFICATE This is to certify that the project work entitled “Different Power Plants“ Is being submitted by Name of the student : Enroll no.: Patel Akshaykumar.
Industrial Training Project on Turbo Generators
Coal quality issues and options Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre January 2015.
S.K.Thapa General Manager BHEL, Kolkata EFFICIENT CYCLE IN POWER GENERATION AN INDIAN PERSPECTIVE.
Introduction And Thermal Power Plant
Seminar on Practical Training By: Er. Kapil Kantia Electrical Engineering BIO-MASS ENERGY DIVISION.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Gas Turbine Power Plant
Humidity Measurement Benefits in Power Applications
 II THE ADVANTAGES OF ELECTRICITY
EXPERIENCE SHARING 4th April 2016   SSBG.
POWER PLANT THERMAL POWER STATION.
Managing Director (Bajaj Power Ventures Ltd)
THERMAL POWER PLANT.
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
Condenser in Power Plants
Presentation transcript:

India Electricity – 2006 Session – II Renovation & Modernisation Presented by: M.R. Ganesan / GM / SSBG Bharat Heavy Electricals Ltd.

Boiler & auxiliaries Pressure Part components are designed for hrs of operation (ASME stress values are for hrs.) Selection of various equipments / materials is based on specific input parameters, steam requirements, coal, ambient condition. Original design

Pollution Control Equipments Based on output parameters of boilers. Coal / Ash characteristics of coal. Pollution control norms Original design

Turbine, Generator & Auxiliaries Designed for ambient & cooling water temperature & blade profile. Components are selected based on operating conditions. Original design

Balance of Plant Selection based on specific requirements of inputs of main plant – boiler, pulverizers, TG Electrical, etc. Water quality & quantity. Coal quality & quantity. Original design

Boiler components suffer due to Service related damages like Oxidation, Corrosion, Erosion and Creep Fatigue Deterioration in coal quality Unit capacity derating Inadequate spares / quality spares Postponement of overhauls / no overhauls Absence of good O&M practices Aging of old equipments – erosion, material damages Low Availability / Reliability State of art features available now for the Design and Operation Philosophy of yesteryears Need for R&M

Benefits of R & M Extended life. Restore lost capacity and /or enhance rated capacity. Improved availability & reliability. Improved heat rate & cycle efficiency. Reduction in auxiliary power consumption. State of art systems for better O & M practices. Low capital requirements compared to green field projects. Low gestation period. Meeting statutory pollution norms.

Strengths of BHEL Improvement on design philosophies to suit Indian conditions based on vast experience. Developed technologies / retrofits to improve the performance e.g: Smart Wall Blower System. Gravimetric feeders with micro processor controls Steam Tube Leakage Detection (STLD) system By-pass Over Fire Air System – NOx Control High efficiency BFP cartridge.

Korba East Thermal Power Station - CSEB (2x120 MW) R&M executed by BHEL Scope of work based on RLA and Condition Assessment. Units running consistently at PLF > 80%. Kothagudem Thermal Power Station – APGENCO (Station B&C – 4x110MW uprating to 4x120 MW) Scope of work arrived at after RLA studies and Condition Assessment and specified by APGENCO. Uprating to 120 MW implemented. Units running consisting at PLF > 85%.

GSECL – Ukai TPS (2x120 MW) Scope: Turnkey execution of R&M works of 2x120 MW Ukai TPS Units 1&2 (involving Boiler & Aux, TG & Aux, C&I, Balance of Plant and Electrical). HPGCL – Panipat TPS (1x110 MW) Scope: Uparting of 1x110 MW SKODA Turbines (involving Boiler & Aux, TG & Aux, C&I, Balance of Plant and Electrical) R&M under execution by BHEL

Adjustment required for compilation of final R&M cost: Suggestions Environmental requirements, like ESP addition, etc. Exclude normal O&M spares Additional allocation for extent of BOP scope The scope & price should be based on the recent RLA study. Performance guarantees should be in line with MOP guidelines.

Thank you