GLAST Large Area Telescope

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
Configuration Management
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectT&C Database Management, 1 July GLAST Large Area Telescope T&C Database Management 1 July 2005 Bryson Lee
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST LAT ProjectISOC Peer Review March 2, 2004 GLAST Large Area Telescope ISOC Peer Review Section 4.2 FSW Code Maintenance Tools T. L. Schalk U. C. Santa.
Reduce Development and Testing Time on Embedded Space Programs With Auto- Generated Code Software Engineer Northrop Grumman Electronic Systems Matthew.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Configuration Management
Software Configuration Management
Software Configuration Management
Software Project Configuration Management
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
Amendment Invoice Task Force Progress Report
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
Calorimeter calibrations with Flight Software.
Amendment Invoice Task Force Progress Report
Chapter 11: Software Configuration Management
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Instrument Flight Software LAT Monthly Sept 1, 2005 Terry Schalk U. C. Santa Cruz

FSW Status FSW Short term goals Run calibration on the LAT with a FSW build OCT 1 Build will have all FSW functionality with a small number of well identified liens (eg GRB identification) Engineering FQT during Sept with Formal FQT in Dec Added configuration functionality last month and FSW packages have moved from imbedded data to this system We now have the pieces for new build (V0-5-0) Provide event output to SSR Basic science data output format Most remaining FSW packages under CCB control with this build

FSW Development and Test Milestones for FQT Candidate Release 0-4-0 (includes CFG system) Science Data Output (Release 0-5-0) Release for Testing (Release 0-6-0) GRB and Compression (Release 0-7-0) TRR ΔTRR 7/20 8/15 9/8 9/15, 9/20 9/30 10/1 11/18 Procedure Review Complete Scripts Complete FQT Complete {I&T System Test} FSW Test <Date> FSW Status Review

FSW TRR Preparation Documentation Specification: Baselined, final updates to CCB 9/6 Test Plan: Baselined, final updates to CCB 9/6 Test Procedures: 48 for System Checkout phase baselined. 7 more (GRB-related) to be baselined prior to System Test. Design Document: Draft complete FSW-ISOC ICD: In work Telecommand and Telemetry Formats: Autogenerated after each integrated build. Will rebaseline prior to FSW testing supporting System Checkout phase RFAs 1 of 6 Flight Unit Peer Review RFAs closed Responses to remaining 5 provided and awaiting closure

TRR Preparation - SQA Documentation Action plan resulting from various internal & external reviews Update and approve MD-00091 Quality Manual Incorporate relevant parts of MD-00474 Internal Quality Audits MD-00216 Controlled Document Release Procedure superseded by CM Plan. Remove reference from Quality Manual. Update MD-00472 Corrective & Preventive Action to clarify that JIRA is FSW database and approve Update Software Mgmt. Plan to reflect current management structure Corrective action status All items in progress ECD 9/2 for changes ECD 9/9 for approval

July Activities Incorporated configuration parameters into all relevant pkgs Built filter's infrastructure for calorimeter pedestal, gains and geometry files Finished the preliminary event output format definitions high energy Gamma are about 500-600 compressed bytes. Delivered code to write data to the SSR "Finished" the LATC design document Finished testing LIM’s modes. Started discussions on operational usage issues

July Activities Worked on a number of bug fixes Identified flaw in LCI compaction routines (& reduced footprint to ~7MB. ) Worked on FES firm/soft ware bugs wrt testing of the calibration code Debugged an issue in the RING buffers Debugged an issue with the Thermal code running at lockheed

FSW Outstanding Issues CR 0-5-0 needs to be made with pkgs exercising the SSR path Completion of high priority Lien list items GRB identification Finish any missing event formats Finish event compression if needed Discovered bugs need to be addressed and CR 0-6-0 made to run system checkout TTR and FQT against. Gain operational experience and address any high priority issues

FSW Test Progress

Test scripts