Data Acquisition System for Gamma-Gamma Physics at KLOE2

Slides:



Advertisements
Similar presentations
LAV front-end board test Francesco Gonnella, Mauro Raggi Photo Veto Working Group 1 April Francesco Gonnella - Laboratori Nazionali di Frascati.
Advertisements

LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Status of the  ee analysis Mauro Raggi, LNF INFN 29 th August 2013 NA48/2 rare decay session NA62 Collaboration meeting Liverpool.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Fig.2: Carry chain delay line: (a) logic block diagram; (b) Layout obtained using a Xilinx Virtex 5 FPGA; (c) simplified block diagram of the Virtex 5.
1 MRPC detector as polarimeter for dEDM Characteristic of detector Time Resolution Electronics Possible R&D Plans D. Babusci, A. Ferrari, P. Levi Sandri,
LAV firmware status Francesco Gonnella Mauro Raggi 10 th October 2012 TDAQ Working Group Meeting.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
D EVELOPMENT & T ESTING : ADC BOARD FOR THE P ROMETEO T EST - BENCH MATTHEW SPOOR University of the Witwatersrand HEPP 2015.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
LAV firmware status Francesco Gonnella Mauro Raggi 23 rd May 2012 TDAQ Working Group Meeting.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
A flexible FGPA based Data Acquisition Module for a High Resolution PET Camera Abdelkader Bousselham, Attila Hidvégi, Clyde Robson, Peter Ojala and Christian.
Peter-Bernd Otte – Sep CB collaboration meeting, Edinburgh.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Design of a Novel Bridge to Interface High Speed Image Sensors In Embedded Systems Tareq Hasan Khan ID: ECE, U of S Term Project (EE 800)
Parallel Data Acquisition Systems for a Compton Camera
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
LAV firmware status Francesco Gonnella Mauro Raggi 28 th March 2012 TDAQ Working Group Meeting.
LAV L0 trigger primitives Mauro Raggi, Francesco Gonnella TDAQ Working Group.
Many LAV stations in digital trigger Francesco Gonnella Photon-Veto Working Group CERN – 03/02/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
RT 2009, 15 th May 2009 Pulse Pile-up Recovery Using Model-Based Signal Processing. Paul. A.B. Scoullar, Southern Innovation, Australia. Prof. Rob J. Evans.
ZHULANOV Vladimir Budker Institute of Nuclear Physics Novosibirsk, Russia Beijing
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Experimental considerations about  physics at DA  NE2 F. Anulli, D. Babusci, G. Pancheri Laboratori Nazionali di Frascati  Physics window at DA  NE2.
K + → p + nn The NA62 liquid krypton electromagnetic calorimeter Level 0 trigger V. Bonaiuto (a), A. Fucci (b), G. Paoluzzi (b), A. Salamon (b), G. Salina.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
The Laboratori Nazionali di Frascati of the Istituto Nazionale di Fisica Nucleare 1.
FONT5 digital feedback boards
A DWDM link for Real-Time data acquisition systems
Energy and time resolution for a LYSO matrix
RF acceleration and transverse damper systems
Bunch-by-bunch feedbacks and Low Level RF
AHCAL Beam Interface (BIF)
Yuzhe Liu1,2, Lian Chen1,2, Futian Liang1,3, Feng Li1,2, Ge Jin1,2
L0TP studies Clock and distribution Scheme Busy handling
The LAV primitive generator
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
(Potential) Site and Utilities
Electronics, Trigger and DAQ for SuperB
PADME L0 Trigger Processor
Data Acquisition System for Gamma-Gamma Physics at KLOE
Fundamental Physics and applications
DC trigger test Present layout Trigger electronics
FPGA implementation of a multi-channels, 1 ns time resolution, multi-hit TDC Lorenzo Iafolla Lorenzo Iafolla SuperB Workshop.
DC trigger test Trigger electronics Experience with cosmic
A WRM-based Application
Hellenic Open University
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
Intrabunch feedback system development at DAFNE
Master I/O Connectors PL12 PL14 PL21 PL20 PL17.
Commissioning of the ALICE-PHOS trigger
Univerity of rome “Tor Vergata”
GEM-based neutron detectors including beam monitors
1INFN Sez. Bari, 2Università degli Studi di Bari “A. Moro”
Quad-calorimeter for KLOE-2
How can we study the magnetic distortion effect?
The Laboratori Nazionali di Frascati of the
Presentation transcript:

Data Acquisition System for Gamma-Gamma Physics at KLOE2 Iafolla Lorenzo12, Archilli Flavio12, Babusci Danilo3, Badoni Davide2, Beretta Matteo3 , Gonnella Francesco12, Messi Roberto12, Moricciani Dario2 1Università degli Studi di Roma “Tor Vergata”, 2INFN, sez. “Tor Vergata”, 3INFN, Laboratori Nazionali di Frascati In the new KLOE experiment, at DAPhNE particle accelerator of LNF-INFN, a pair of tagger detectors will be installed in order to investigate gamma-gamma physics (refer to “Gamma-Gamma Tagging System for KLOE2 Experiment” poster). We shall need to acquire a 32 bits pattern for each detector and to allow an high time-resolution event reconstruction with KLOE data. To address this issue we are going to use, respectively, R/F (368MHz) and bunch reference (Fiducial) signals from DAPhNE as external clock and reference signal. The first level trigger signal (T1) from KLOE will indicate which data have to be saved and which can be discarded. Due to the high work-frequency, we will implement the data acquisition system with a XILINX Virtex5 FPGA: this choice is cheaper then TDC. The real time sampling and holding system, reference providing system, memorization and transfer data system will be described on the poster. We tested the developed electronic system and it worked properly up to 450 MHz with 32 channels on a Virtex5 VFX70T. A lot of communication systems with outside apparatuses, using Microblaze or PowerPC embedded processors, are feasible and make possible to use this system with different experiments. Other acquisition techniques, using Virtex5, are under consideration.