When operating the Tongs under tension, make sure all crew keep clear

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
Don’t pull a twisted sling
Always stay out of the line of fire
Ensure all safety covers and guards are secured and in place
PDO Second Alert Date: Incident title: Fall from Height
Always ensure the correct grade and length bolts are used
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Always Drive to road conditions
PDO Second Alert What happened? Your learning from this incident..
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the right equipment for the task !!!!
Check & avoid potential Pinch points
Ensure OHL Clearance required for your lifting activity
PDO Second Alert Date: Incident Type: LTI What happened?
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
Always stay out of the line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: Fatality What happened?
PDO Second Alert Date: Incident title: LTI What happened?
Pay attention to your footing
Unsecured pup joint falling
Identify, Verify & Monitor Barriers
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Never place yourself in “line of fire”
Always use your hands to set the slips
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Photo explaining what was done wrong
Do not move into the Line of Fire
Always be vigilant while moving across well site location
PLAN AND DOCUMENT CHANGES TO THE OPERATION
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
Always adhere to Red/No Go zones
Keep away from “Line of Fire”
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

When operating the Tongs under tension, make sure all crew keep clear PDO Second Alert Date: 27.09.16 Incident title: LTI What happened? When breaking out the first connection following Milling operations, a Manual Tong was latched onto the Drill Pipe to secure it in place. The bottom connection had already been broken and was resting in the thread housing from the below Drill Pipe. The Manual Tong was slipping on the Drill Pipe when force was applied through the Power Swivel so the Driller instructed the Floor Man to stay within the Red Zone to hold it in place. Your learning from this incident.. Always ensure you talk about the importance of the Red Zone during your Tool Box Talks Do not remain within the Red Zone while equipment is being operated Always check that your equipment is correctly placed, prepared or secured before applying torque and increasing the potential energy. Always check the Rig Floor is clear before operating equipment Make sure all crew members understand the empowerment to stop an unsafe act. When operating the Tongs under tension, make sure all crew keep clear

Management self audit Date: 27.09.1 Incident title: LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Are all crew members aware of the potential risks of the equipment used? Are all crews aware of the importance of the Red Zone? Is all equipment and materials checked before they are used? Are all PSP’s regularly monitored and up to date? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.