Industrial Assessment Center at NC State Project Sampler

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.
Energy Efficiency Auditing through the UW-Milwaukee Industrial Assessment Center W. Barlas, C. Zahn, and Y. Yuan Department of Mechanical Engineering,
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
Make the most of your energy Head Office – Case Study.
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
Integrated Systems + Principles Approach. Source: California Energy Commission (2000) Manufacturing Energy End-Use Breakdown.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
Chilled Beam Presentation
Chapter 4 — Control Principles Chapter 4 Control Principles Control System Components Sensors Controllers Controlled Devices Control Agents Control Functions.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Integrated Systems + Principles Approach. Source: California Energy Commission (2000) Manufacturing Energy End-Use Breakdown.
RETScreen® Energy Efficiency Projects
UTC’s Central Energy Plant Humid air Out with heat Central Energy
Objectives Finish with Multizone Systems
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Overview of Liquid Cooling Systems Peter Rumsey, Rumsey Engineers.
Green Building Demonstration Project Adam Saling City of San Diego.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
1 Mary Medeiros McEnroe Acting Public Benefit Program Coordinator Silicon Valley Power August 20, 2008 Energy Efficiency Resources for Industrial Customers.
N O R T H A M E R I C A C O M M E R C I A L TDP
Overview of Data Center Energy Use Bill Tschudi, LBNL
PRESENTED BY: J.MIKE TYSON S.RAVIKUMAR S.SAKTHI M.SATHISHKUMAR.
Purdue Technical Assistance Program Purdue TAP MEP Center EESH-TAP Campus Resources.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
Introduction to HVAC Optimization
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
THERMAL POWER PLANT.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Energy Conservation Building Upgrades Alma School District.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Comprehensive Energy Projects May 4, 2016 Andy Kelly Manager of Plant Engineering Central Production Facility Co-op & Northeast Hot Fill Co-op.
Changes for 2016 Moving Forward! 2016 ECM Fan Box Bright Energy Solutions! LED High Bay! Chillers! Ready for 2016.
Ch. 1 Introduction to HVAC & R
The Data Center Challenge
EnMS Management Review
Lecture Objectives: Discuss Final Project
PRIEN / PIAA Meeting April 30, 2009 Pfizer Caguas
Heat Pumps For Energy Efficient / Economical Hot water Generation
Energy Savings Projects
UMCP Learning Objectives
HVAC EQUIPMENT: COOLING SOURCES (see Chapter 16)
Grunenwald Science and Technology Building
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Variable Frequency Drive Savings Calculator Tools
HVAC EQUIPMENT General
Shavitz Heating & Air Conditioning is a premier residential and commercial service company, installing and maintaining systems from homeowners’ old hot-water.
Brian Wallingford, Applications Engineer
pplelectric.com/businessrebates
Objectives Humidifying - steam - adiabatic Cooling towers
Abbas Shirian, PE Certified GeoExchange Designer
LED Savings and Simple Payback at the Music Building
HW2 Book problems: 8.5, 8.25, 8.27, 8.28, 8.22  Additional Design Problem (#5): Due October 7th.
Calibrated Energy Models: One New Change
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
County of Kane Facility Efficiency Improvements.
Heating, Ventilation and Air Conditioning HVAC
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Industrial Assessment Center at NC State Project Sampler Alexander Thomas

NC-606 Wood Siding Facility in Roaring River, NC Recommendation: Reorganize Aerator Fans 10 Megagallon Aerobic Digestion Lagoon Ten 50 hp & ten 75 hp Electricity Savings: 614,107 kWh/yr. Cost Savings: $31,091/yr. Implementation Cost: $15,000

NC-613 Broadwoven Fabric Facility in Cliffside, NC Recommendation: Use Air Washer Water as Cooling Tower Make-up Air Washer HVAC system Water Savings: 380,000 gal./yr. Cost Savings: $6,422/yr. Implementation Cost: $1,500 Difference in humidity ratios

NC-616 Mirror Facility in N NC-616 Mirror Facility in N. Wilkesboro, NC Recommendation: Install sensors and oven controllers Mirrors on conveyor were not identical size Uneven heating caused breakages Product Yield Savings: 0.75% Cost Savings: $112,500/yr. Implementation Cost: $150,000

NC-623 Automotive Fabric Facility in Hickory, NC Recommendation: Install HVAC Economizers Knitting room relied entirely on infiltration for replacement air Electricity Savings: 265,790 kWh/yr. Cost Savings: $14,844/yr. Implementation Cost: $10,000

NC-629 Fiberglass Veil Facility in Dallas, NC Recommendation: Implement a Heat Recovery Chiller 100 hp boiler @ 105 psig 37% loaded, 90% steam used to make hot water Electricity Increase: 128,722 kWh/yr. Natural Gas Savings: 11,388 MMBTU/yr. Cost Savings: $35,842 Implementation: $115,000