© Industry Forum 2012 All Rights Reserved Rev 7

Slides:



Advertisements
Similar presentations
Pass the eraser. When the music stops – whoever has the eraser must finish the sentence…. SPEAK UP AND SPEAK CLEARLY!
Advertisements

Throughput Throughput, Utilization, Bottleneck, Effective Capacity, Theoretical Capacity, and Capacity Leverages. November 11, 2011 Ardavan Asef-Vaziri.
Figure M.1a: MEA Bulk Supply Demand. Figure M.1b: PEA Bulk Supply Demand.
Here we continue in the chapter on Lean Systems
Vandal Boat Factory Simulation
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Beginning the Assent: 16:57 Rerun to Beer Bottle Pass.
Internet Architecture Two computers, anywhere in the world, following certain hardware, software, protocol specifications, can communicate, reliably even.
Verbs in the present and past tense Present tense I am jumping. I am jumping. This means I am doing it now.
Advanced Decisions and Loops Chapter Some Simple Schoolroom Statistics.
Graduate Program in Engineering and Technology Management
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
MEASURING SPEED. Measuring speed is very hi-tech nowadays but before this technology was developed the police relied on the same method of measuring speed.
Stage 13 Bee: Conditionals
Public Relations Manager Vocabulary PowerPoint Created by the University of North Texas in partnership with the Texas Education Agency.
The Cell- the basic unit of living things. The following questions should be answered as completely as possible. Draw, write, diagram or discuss your solution-
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
© Cambridge University Press 2013 Thomson_alphaem.
© Cambridge University Press 2013 Thomson_Fig
© Oxford University Press 2011 IC Emulsions Emulsions.
all possible y -values all possible x -values The lowest or highest point of a parabola. Minimum: lowest point (bottom of the valley) Maximum: highest.
The Mosaic Idea For Physics
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Wednesday, August 31, 2010 Today’s Agenda: Special Intentions and Prayer Review of Fridays Class God Created Us to Know Him Essential Vocabulary Timeline.
Choose an image START MORE DINOSAURS REVEAL ANSWER THE SUM WOULD BE WRITTEN LIKE THIS.
Insert a voice comment in Word 2007 Before you can add a voice comment for the first time, you need to add the Insert Voice command to the Quick Access.
TWO TYPES OF DEMAND Push Pull Which would you prefer to have as a manufacturer? Why can that be tricky?
The Business Cycle An Economic Concept.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
© Cambridge University Press 2013 Thomson_Fig
Paper Planes Paper Aeroplane Simulation. Session Outline Setup a factory to make paper aeroplanes Run the factory and record performance data Analyse.
Timed Quiz You are about to see 6 questions. You need to work out which answer is the odd one out. You have 30 seconds per question Click to continue.
Image from
T Accounts: Demand Deposits and Money Creation?
Event-driven accounting information systems
Process engineering TAKT times.
© Cambridge University Press 2011
Stock Market Crash.
Bell Work Don’t forget to copy down the questions or incorporate them into your answers. Use complete sentences. What was the best part of your winter.
From: Where do we go from here

Stop Motion Video Open “Flipagram” app on the iPad
Marketing Versus Sales
Top Fire Protection Services Ottawa available on Dubinskyconstruction
© Akhilesh Bajaj, All rights reserved.
The Business Cycle An Economic Concept.
Click on a numbered square to make the square disappear.
Do you know your sentence types?
Types of Advertising by Purpose
Thomson_eeWWtgc © Cambridge University Press 2013.
Industrial Training Provider ,
Thomson_atlascmsEventsAlt
What is the function of the graph? {applet}
Write the equation of the line.
Do Now: Solve and Graph.
Utility: The Value Added by Marketing
Reflection © T Madas.
Thomson_CandP © Cambridge University Press 2013.
Harvard ManageMentor®
WALT: understand and use present and past tense
Transcendentalism Stations
2. SUPPLY, DEMAND AND PRICE
What is the function of the graph? {applet}
Piecewise-defined Functions
Verbs in the present and past tense
Stages of Production.
Unit 1 Test Review.
Thomson_AFBCartoon © Cambridge University Press 2013.
Game / Application Quote Brief
Find the limit {image} ,024 2,160 -1,

Presentation transcript:

© Industry Forum 2012 All Rights Reserved Rev 7 Takt Time What happens if the product takes 32 seconds to make? You need to set the process up with a number of separate work stations. A maximum of 4 seconds of work is done at each station and then the product is passed on. To meet customer demand a finished product is required every 4 seconds. But it takes 32 seconds to make Press to reveal the next 2 statements. Press to reveal moving image. Note it stops and reruns after every 8 moves. © Industry Forum 2012 All Rights Reserved Rev 7