Project management services We do offer to our clients management skills, tools, and required techniques to a broad range of activities in order to meet.
Advertisements

Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Images and text from HKT Architects – Project Architects.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Traditional and Modern Construction Methods. A presentation for P7, P8, and P9 By ?
Construction Technology Bachelor of Science (hons) in Quantity Surveying ITS April 2008.
7 Set of Floor Plans Primary Considerations
SUBJECT CODE : CE1301 BUILDING TECHNOLOGY
Technical boclair academy Building Drawings.
Double storeyed house Galore By Sophie lunn Ensuite:1 Toilets:3 Intercom Study Built-in Wardrobes Dishwasher Ducted Heating Ducted Cooling Remote Garage.
Site Plans.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
How to build a two storey house
The HelitropThe Helitrop.  Rolf Disch is the architect of the Helitrop.  His first building was finished in summer 1994 in Freiburg.  He and his wife.
Graphic Communication
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
FOR SALE 132 Park Road Blackpool Lancs FY1 4ES 3 Bedrooms Rear porch/ conservatory PVCu Double Glazing Gas Central Heating Price: £74,950 Middle Terraced.
1 Cathcart Road Planning Drawings CR/1/P/15 Philip Challinor 3 Cathcart Road m Position of photos Photo showug.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
. TEMPLE ARCHITECTURE Gudied By Presented By Ms KAVITHA P ESARATH K THANKAPPAN LecturerSemester 7,CIVIL Dept of CIVILRoll No:49.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
Fundamentals of Construction
Foundations of Technology Construction
Major Steps In Building a SFR
* 07/16/96 Site Development Plan * ##.
Dream House By Steven Reyes.
Table (3.1)- the averages of the 10 models costs
Curriculum for Excellence
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Cockshutt Plow Company Office and Timekeeper’s Building
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
HANDICAPPED PEOPLE RESIDENT
20 Chestnut Drive, Mansfield
Progress Report 11/10/11.
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Building Drawings.
7 Building Construction and the Environment
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Foundations of Technology Construction
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
Minuteman Vocational Technical Regional High School Progress
PKL INVESTMENTS LTD Value of contract: Length of contract:
Ashfield District Council Disabled Facilities Adaptations
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Field House, Car Colston Value of contract: Length of contract: Contract start date: Completion date: £3,500,000 24 months Summer 2015 Spring 2017 Works/services provided: Demolish & recycle agricultural buildings Bespoke Mahogany staircase, balustrade Site clearance, Earthworks, UG Drainage French polishing Installation of ground source heating Sliding sash timber windows, bespoke doors In-situ concrete foundations & substructure Decorative plaster mouldings Masonry walls, Stone masonry Bespoke Timber cabinetry, Marble tops Waterproof tanking to basement walls Limestone flooring, Wall panelling Welsh slate roofing, decorative lead welding Hardwood ‘parquet’ flooring Detailed description of contract: Construction of a three storey Georgian style house on the site of the former Field House Farm. Works included; separate Garage & Office building, formal garden, Kitchen Garden, approach roads, Driveway & Courtyard parking etc Particular challenges to be overcome: Contact details: Working within Environmental Agency restrictions to protect ecology – Greater Crested Newts Sourcing master craftsmen for a range of traditional skills Working closely with the lead architect to agree detailing and an exacting finishes schedule Alex McIntyre Architects The Studio, 1 Clinton Terrace Derby Road Nottingham, NG7 1LY Tel: 0115 9599977