Replacement studies Construction Engineering 221 Economic Analysis.

Slides:



Advertisements
Similar presentations
Raising Entrepreneurial Capital Chapter 5: Valuation.
Advertisements

Lecture-1 Financial Decision Making and the Law of one Price
Impact of Taxes on Replacement Decisions
Replacement Study Fundamental Issue Over time, company assets need to be replaced due to: Reduced performance Altered requirements Obsolescence A replacement.
Engineering Economy Practice Problems
After-tax Salvage If the salvage value is different from the book value of the asset, then there is a tax effect Book value = initial cost – accumulated.
Evaluating Business and Engineering Assets Payback Period.
MANAGERIAL ACCOUNTING
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 26-1 CAPITAL BUDGETING Chapter 26.
Chapter 17 Investment Analysis
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
Capital Budgeting LECTURE 29. Ignores the time value of money. Ignores cash flows after the payback period. Payback Period.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
INVESTMENT ANALYSIS PRACTICE PROBLEM. A fertilizer dealer is considering the purchase of a new piece of equipment the will allow him to vary the application.
Flash back before we compare mutually exclusive alternatives.
Dealing With Uncertainty
Chapter 11 Replacement Decisions
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
1 Cash Flow vs. Accounting Income Project Income Statement Revenues -Depreciation (D) - All other costs EBT -Taxes Project NI (PNI) Cash flow = PNI + Noncash.
Chapter 15 Replacement Decisions
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
1 Supplementary Notes Present Value Net Present Value NPV Rule Opportunity Cost of Capital.
©2012 McGraw-Hill Ryerson Limited 1 of 45 Learning Objectives 4.Appraise the use of the cost of capital as the discount rate in capital budgeting analysis.
PLANT ASSETS, NATURAL RESOURCES, AND INTANGIBLE ASSETS
Chapter 7: Depreciation Lecture 13
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 9 Cost Concepts in Economics.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
Copyright © 2007 by The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Slide 15-1 Chapter Fifteen Leases.
A Comparison of Approaches to Investment Analysis John Favaro Proc. Fourth International Conference on Software Reuse, 1996, IEEE Computer Press, p
© 2012 McGrawHill Ryerson Ltd. Chapter 6 -  The coupon rate is the annual interest payment divided by the face value of the bond  The interest rate (or.
Capital Budgeting Decisions
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Engineering Economic Analysis Canadian Edition
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
1 Modeling Economic Life… Total EAC = EAC of Ownership + EAC of Operation Objective is to determine the optimum number of years to own an asset that minimizes.
課程四 : 風險分析 Application: The replacement decision Public utilities and annual cost Risk Analysis Sensitivity analysis Scenario analysis Mote Carlo simulation.
Berlin, Fußzeile1 More About Present Values Applications: Concept of Net Present Values.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Investment Analysis Chapter #8. Time Value of Money u How does time affect money? u Does money increase or decrease over time?
Life-cycle cost analysis (LCCA)
1 Developing Project Cash Flow Statement Lecture No. 23 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
By Muhammad Shahid Iqbal
Contemporary Engineering Economics
Accounting for Leases Largest group of leased equipment involves:  Information technology  Transportation (trucks, aircraft, rail)  Construction.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
Cash Flow Analysis Construction Engineering 221 Economic Analysis.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
CH 9 NET PRESENT VALUE AND OTHER INVESTMENT CRETERIA.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
By: Robert Anderson Economic Feasibility Model for Biogas Facilities in Ontario.
Cash Flow Estimation Byers.
Income Taxes and the Net Present Value Method
Replacement Analysis Lecture No. 46 Chapter 14
Engineering Economics
Comparing Mutually Exclusive Alternatives
About the Author. Creating an Apartment Feasibility Model For Park Cities By Terry Asante.
Chapter 7 Present Worth Analysis
Cash Flow Estimation Byers.
Construction Engineering 221 Economic Analysis
By Muhammad Shahid Iqbal
Engineering Economics
REPLACEMENT DECISIONS
OUTLINE QUESTIONS? NEWS? REMINDERS: EVALUATIONS
Presentation transcript:

Replacement studies Construction Engineering 221 Economic Analysis

Replacement Studies Opportunity costs is a conceptual term referring to the foregone returns of an investment not pursued, or what you will lose by not doing anything Opportunity costs are most often representing in engineering economics problems as the cash flows forfeited by not selling (replacing) an asset before its useful life is up

Replacement Studies When examining whether to continue using (economically) an existing process or product (equipment), the calculation is called a replacement study Any of the basic methods will work for comparison, but the annual cost method is most common Existing equipment is sometimes called the defender and the new is the challenger

Replacement Studies Salvage in replacement studies is an estimate of future value (F) Treat salvage as an opportunity cost- not as a trade-in cost (keep defender costs and values together, and separate from the challenger costs and values) Convention is to use present value if lives are equal and annualized cost if lives are different because discount of F will vary based on number of terms

Replacement Studies Economic life- when the cost to keep an asset (O & M) exceeds the value (revenue) it can produce. Cost to keep is sum of amortized initial cost (decrease with time) PLUS the operating cost (increase with time) Summation of amortization and operation produces a U-shaped curve

Replacement Studies Economic life calculation amortization operation $ time $ Economic life

Replacement Studies Example 16 on page 39 is a good illustration of replacement scheduling calculations Replacement schedules are only as good as the data/ estimates used to calculate operation costs and economic life.