Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©

Slides:



Advertisements
Similar presentations
Lecture No. 36 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Advertisements

(c) 2001 Contemporary Engineering Economics 1 Chapter 15 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis.
Replacement studies Construction Engineering 221 Economic Analysis.
Chapter 9: Replacement Analysis
Engineering Economics in Canada
TYPES OF REPLACEMENT DECISIONS
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, Replacement Basics.
Replacement Analysis. Chapter 11 - Replacement Given a cash flow profile for current and replacement equipment, be able to use either the cash flow or.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP V-ANNUAL WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
Rate of Return Multiple Alternatives Lecture slides to accompany
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Replacement.
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Contemporry Engineering Economics, 4 th edition, © 2007 Equivalence Calculations with Continuous Payments Lecture No.12 Chapter 4 Contemporary Engineering.
Chapter 11 Replacement Decisions
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
Contemporary Engineering Economics, 4 th edition © 2007 Economic Equivalence Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2006.
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Contemporary engineering Economics, 4 th edition, © 2007 Design Economics Lecture No.23 Chapter 6 Contemporary Engineering Economics Copyright © 2006.
© 2012 by McGraw-Hill All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 11 Replacement.
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Annual Equivalent Worth Criterion.
Contemporary Engineering Economics, 4 th edition, © 2007 Income Tax Rate To Be Used in Economic Analysis Lecture No. 37 Chapter 9 Contemporary Engineering.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Lecture No.19 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Design Economics Lecture No. 22 Chapter.
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
1 Modeling Economic Life… Total EAC = EAC of Ownership + EAC of Operation Objective is to determine the optimum number of years to own an asset that minimizes.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Developed.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Irregular Payment Series and Unconventional Equivalence Calculations
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Lecture No. 9 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Interest Formulas for Single Cash Flows
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Replacement Analysis Lecture No. 46 Chapter 14
Chapter 6: Comparison and Selection Among Alternatives
Applying Annual Worth Analysis
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Annual Equivalent Worth Criterion
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
By Muhammad Shahid Iqbal
REPLACEMENT DECISIONS
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
OUTLINE QUESTIONS? NEWS? REMINDERS: EVALUATIONS
Applying Annual Worth Analysis
Presentation transcript:

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright © 2006

Contemporary Engineering Economics, 4 th edition, © 2007 Required Assumptions and Decision Frameworks Planning Horizon (Study Period) Infinite planning horizon Finite planning horizon Technology No technology improvement is anticipated over the planning horizon Technology improvement cannot be ruled out Revenue Cash Flow Information Decision Frameworks

Contemporary Engineering Economics, 4 th edition, © Replace the defender now: The cash flows of the challenger estimated today will be used. An identical challenger will be used thereafter if replacement becomes necessary again in the future. This stream of cash flows is equivalent to a cash flow of AEC C* each year for an infinite number of years. 2. Replace the defender, say, x years later: The cash flows of the defender will be used in the first x years. Starting in year x+1,the cash flows of the challenger will be used indefinitely thereafter. Replacement Strategies under the Infinite Planning Horizon

Contemporary Engineering Economics, 4 th edition, © 2007 Types of Typical Replacement Decision Frameworks

Contemporary Engineering Economics, 4 th edition, © 2007 Example 14.4 Relevant Cash Flow Information (Defender) Cash flow diagram for defender when N = 4 years

Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life for the Defender (Example 14.4) Defender: Find the remaining useful (economic) service life.

Contemporary Engineering Economics, 4 th edition, © 2007 AEC as a Function of the Life of the Defender (Example 14.4)

Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life for the Challenger (Example 14.3) N = 1 year: AE(15%) = $7,500 N = 2 years: AE(15%) = $6,151 N = 3 years: AE(15%) = $5,847 N = 4 years: AE(15%) = $5,826 N = 5 years: AE(15%) = $5,897 N C* =4 years AE C* =$5,826 Investment cost = $10,000 Salvage value N = 1: $6,000 N > 1: decreases at a 15% over previous year Operating cost N = 1: $2,000 N > 1: increases at a15% annual rate

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Should replace the defender now? No, because AEC D < AEC C If not, when is the best time to replace the defender? Need to conduct the marginal analysis. N C* = 4 years AE C* =$5,826

Contemporary Engineering Economics, 4 th edition, © 2007 Question: What is the additional (incremental) cost for keeping the defender one more year from the end of its economic service life, from Year 2 to Year 3? Financial Data: Opportunity cost at the end of year 2: Equal to the market value of $3,000 Operating cost for the 3 rd year: $5,000 Salvage value of the defender at the end of year 3: $2,000 Marginal Analysis to Determine when the Defender should be Replaced

Contemporary Engineering Economics, 4 th edition, © $3000 $2000 $5000 Step 1: Calculate the equivalent cost of retaining the defender one more from the end of its economic service life, say 2 to 3. $3,000(F/P,15%,1) + $5,000 - $2,000 = $6,450 Step 2: Compare this cost with AEC C = $5,826 of the challenger. Conclusion: Since keeping the defender for the 3 rd year is more expensive than replacing it with the challenger, DO NOT keep the defender beyond its economic service life. $6,450 23

Contemporary Engineering Economics, 4 th edition, © 2007 Example 14.5 Replacement Analysis under the Finite Planning Horizon N Annual Equivalent Cost ($) DefenderChallenger 15,1307,500 25,1166,151 35,5005,857 45,9615,826 56,4345,897 Some likely replacement patterns under a 8-year finite planning horizon

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis under the Finite Planning Horizon (Example 14.5) Option 1:(j 0, 0), (j, 4), (j, 4) PW(15%) 1 =$5,826(P/A, 15%, 8) =$26,143 Option 2:(j 0, 1), (j, 4), (j, 3) PW(15%) 2 =$5,130(P/F, 15%, 1) +$5,826(P/A, 15%, 4)(P/F, 15%, 1) +$5,857(P/A, 15%, 3)(P/F, 15%, 5) =$25,573

Contemporary Engineering Economics, 4 th edition, © 2007 Option 3(j 0, 2), (j, 4), (j, 2) PW(15%) 3 =$5,116(P/A, 15%, 4)(P/F, 15%, 2) +$5,826(P/A, 15%, 4)(P/F, 15%, 2) +$6,151(P/A, 15%, 2)(P/F, 15%, 6) = $25,217minimum cost Option 4 (j 0, 3), (j, 5) PW(15%) 4 = $5,500(P/A, 15%, 3) +$5,897(P/A, 15%, 5)(P/F, 15%, 3) =$25,555 Example 14.5 continued

Contemporary Engineering Economics, 4 th edition, © 2007 Example 14.5 continued Option 5:(j 0, 3), (j, 4), (j, 1) PW(15%) 5 = $5,500(P/A, 15%, 3) + $5,826(P/A, 15%, 4)(P/F, 15%, 3) + $7,500(P/F, 15%, 8) = $25,946 Option 6: (j 0, 4), (j, 4) PW(15%) 6 = $5,826(P/A, 15%, 4)(P/F, 15%, 4) + $5,826(P/A, 15%, 4)(P/F, 15%, 4) = $26,529

Contemporary Engineering Economics, 4 th edition, © 2007 Graphical Representation of Replacement Strategies under a Finite Planning Horizon