Automation Committee Workshop Welcome
Automation Committee Executive Committee Mike Stoup Committee Chair McKim & Creed Evan Curtis Vice Chair Hazen & Sawyer Kevin Gerszuny Program Chair Kimley-Horn Dana Musumeci Marketing Chair Star Controls Wayne Wilson Secretary Data Flow Systems Brandon Bryant Municipal Rep Orange County Utilities Rick Nelson Municipal Rep St Johns County
Presentation 1: What is SCADA? How To Fund SCADA Projects? Discussion Workshop Agenda Presentation 1: What is SCADA? How To Fund SCADA Projects? Discussion 15 minute break Presentation 3: Radio vs Cellular Migrating from 3G to 4G or 5G Discussion 15 minute break Presentation 2: Life of a Signal The use of Big Data Discussion Q&A and Closing comments
Workshop Format Each presentation will last approximately 20 minutes Each table will be posed a list of questions to start discussions about the presentation A spokesperson for the table will be selected by each table The spokesperson will share the table’s answers to the questions with the rest of the tables
Automation Committee Workshop Presentation 1 What is SCADA? How To Fund SCADA Projects?
What is SCADA? SCADA is a term for a type of system. The acronym stands for Supervisory Control And Data Acquisition SCADA is a control system used to monitor and control operation of equipment such as pumps, valves, sensors and other instruments.
Human Machine Interface A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. MANUFACTURERS Rockwell - FactoryTalk Schneider - Citect Wonderware VTScada GE - iFix OpenSCADA Ignition HMI Human Machine Interface
Programmable Logic Controller A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. MANUFACTURERS Rockwell Allen-Bradley Schneider Modicon SCADAPack Siemens GE AutomationDirect Emerson PLC Programmable Logic Controller
Radio, Cellular, Ethernet, Modbus, Fiber Optic A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. Fiber Optic Copper Cellular Radio Radio, Cellular, Ethernet, Modbus, Fiber Optic
Variable Frequency Drives A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. Tank levels Flow Pressure, Temperature Pump Status pH Conductivity Valve Status Read Instruments Pump Start/Stop Valve Open/Close Variable Frequency Drives Control Devices
A Typical SCADA System Plant #2 Cellular Plant #1 Cloud Radio Remote Station A Typical SCADA System Radio FCC Licensed Unlicensed 200-900Mhz Point-To-Point Point-To-Multipoint Cellular Cloud Plant #2 Plant #1
How to fund SCADA projects? Obsolescence SCADA software upgrade cycle is typically 5 years Hardware lifecycle is typically 15-20 years CIP Planning Identify SCADA needs in advance Add the costs for SCADA projects to the CIP Master Plans Either overall or SCADA Master Plans can help justify Are a formal document identifying a need and path Master Plans typically have a list of projects
How to fund SCADA projects? Add-on Strategies Take advantage of plant expansions or refurbishments Add fiber optic cable when installing underground assets like pipelines Follow the IT model and specify the right equipment and software Justifications Improve safety Downtime or spill costs versus more instrumentation and visibility Go from 24/7/365 to only M-F 8-5 operators Remote visibility/control for all Reduce energy and maintenance costs
Discussion Questions What are some misconception you had about SCADA systems? What funding strategies have you found successful for funding SCADA projects?