Automation Committee Workshop Welcome

Slides:



Advertisements
Similar presentations
Fieldbus Technology Presenter: Todd Shadle
Advertisements

Introduction What is the PCIMS ? PCIMS :Process Control Information Management System Each plant as an individual process area shall consist of an integrated.
Wireless Modems Dan Tolley Director of Business Development ESTeem Wireless Modems Wireless Business Opportunities from the FCC Narrowband Mandate.
Substation Automation (S.A) System Project Supervisor: Stuart Wildy.
What can QCI do for you? Shawn Stevenson Don Weirens.
SCADA SYSTEM CLASSIFICATION
Copyright © 2002 Delmar Thomson Learning Chapter 9 Putting Together a Modular PLC.
History of industrial Automation
Secure Systems Research Group - FAU 1 SCADA Software Architecture Meha Garg Dept. of Computer Science and Engineering Florida Atlantic University Boca.
Introduction What is the PCIMS ? PCIMS :Process Control Information Management System Each plant as an individual process area shall consist of an integrated.
PLC: Programmable Logical Controller
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
An Introduction to SCADA Fundamentals and Implementation
SCADA and Telemetry Presented By:.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
Distributed Control System Group D Louay Sirwi Abdallah Jafar Dr. H. Shabaik SE – 401.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Topics of presentation
Overview Overview  Skills of AMERICAN TECHNOLOGIES Inc. CapabilitiesCapabilities  What is Spread Spectrum Technology?  ACT’s Products and Services.
Enterprise Systems Business Planning & Logistics Site Manufacturing Operations and Control Area Supervisory Control Basic Control Safety- Instrumented.
ADAM-4000 Modbus I/O Market Focus Mark Lin eAutomation Div. PSM Industrial Automation Group
SCADA John F. Lipka USA Security Lead Encana Oil & Gas (USA) Inc.
Chapter 3 Programming a Programmable Controller. Objectives Describe the available options for programming a PLC. Explain what online is in comparison.
Putting Together a Modular PLC
PROGRAMMABLE LOGIC CONTROLLER
Unrestricted © Siemens, Inc All rights reserved.Answers for industry. Crude Oil Pipelines Monitoring and Cont rol Siemens O&G Innovations Conference.
Employment of scada system in water purification and transmission system.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
Welcome To IITP Automation One Day Workshop Program of Industrial
Submitted by: - Debasis Samantaray 7 th semester, Mechanical Engineering Regd. No: Ajay Binay Institute of Technology 1.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Industrial Wireless Licensed Long Distance Ethernet Ultra-long range Ethernet for reliable connectivity.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 SCADA Market Share, Growth,
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
Fundamentals and Implementation
SCADA SCADA TRAINING AJAY K BASU
Industrial communication networks
Automation Technologies SCADA SENSORS HMI
Latency and Communication Challenges in Automated Manufacturing
CHAPTER 1: Computers and Systems
Lesson 3 SCADA.
RMSAWWA/RMWEA 2002 ANNUAL CONFERENCE
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
Programmable Logic Controllers: I/O
SCADA, what can it do for you?
PLC-based control systems at SOLEIL - ICALEPCS 2017
PRESENTATION ON AUTOMATION,PLC AND SCADA
Fundamentals and Implementation
How SCADA Systems Work?.
Welcome! Thank you for joining us. We’ll get started in a few minutes.
Engineering - potential areas for action
Industrial Automation
An Introduction to SCADA Fundamentals and Implementation
Identifying SLC 500™ System Components
 Best Industrial Automation Training Institute in Thane Mumbai|SageAutomation
Equipment Monitoring Market
Industrial Automation
Programmable Logic Controllers
SCADA Communication and Architecture Principles
PLC Hardware Components.
DET 214/3 PROGRAMMABLE LOGIC CONTROLLER
Automation Committee Workshop Presentation 2
Automation Committee Workshop Presentation 3
ICAS Alarm Upgrade ICAS Alarm Upgrade Project
COMPANY PROFILE. Contents Company Profile  Architectural Design, Plans & Drawings  Construction Management, Costing & Implementation  Process Measurement.
FieldLink Process Networking Introduction
Presentation transcript:

Automation Committee Workshop Welcome

Automation Committee Executive Committee Mike Stoup Committee Chair McKim & Creed Evan Curtis Vice Chair Hazen & Sawyer Kevin Gerszuny Program Chair Kimley-Horn Dana Musumeci Marketing Chair Star Controls Wayne Wilson Secretary Data Flow Systems Brandon Bryant Municipal Rep Orange County Utilities Rick Nelson Municipal Rep St Johns County

Presentation 1: What is SCADA? How To Fund SCADA Projects? Discussion Workshop Agenda Presentation 1: What is SCADA? How To Fund SCADA Projects? Discussion 15 minute break Presentation 3: Radio vs Cellular Migrating from 3G to 4G or 5G Discussion 15 minute break Presentation 2: Life of a Signal The use of Big Data Discussion Q&A and Closing comments

Workshop Format Each presentation will last approximately 20 minutes Each table will be posed a list of questions to start discussions about the presentation A spokesperson for the table will be selected by each table The spokesperson will share the table’s answers to the questions with the rest of the tables

Automation Committee Workshop Presentation 1 What is SCADA? How To Fund SCADA Projects?

What is SCADA? SCADA is a term for a type of system. The acronym stands for Supervisory Control And Data Acquisition SCADA is a control system used to monitor and control operation of equipment such as pumps, valves, sensors and other instruments.

Human Machine Interface A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. MANUFACTURERS Rockwell - FactoryTalk Schneider - Citect Wonderware VTScada GE - iFix OpenSCADA Ignition HMI Human Machine Interface

Programmable Logic Controller A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. MANUFACTURERS Rockwell Allen-Bradley Schneider Modicon SCADAPack Siemens GE AutomationDirect Emerson PLC Programmable Logic Controller

Radio, Cellular, Ethernet, Modbus, Fiber Optic A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. Fiber Optic Copper Cellular Radio Radio, Cellular, Ethernet, Modbus, Fiber Optic

Variable Frequency Drives A SCADA system uses computers, industrial processors and networks to read field devices, make decisions, and control other field devices. Tank levels Flow Pressure, Temperature Pump Status pH Conductivity Valve Status Read Instruments Pump Start/Stop Valve Open/Close Variable Frequency Drives Control Devices

A Typical SCADA System Plant #2 Cellular Plant #1 Cloud Radio Remote Station A Typical SCADA System Radio FCC Licensed Unlicensed 200-900Mhz Point-To-Point Point-To-Multipoint Cellular Cloud Plant #2 Plant #1

How to fund SCADA projects? Obsolescence SCADA software upgrade cycle is typically 5 years Hardware lifecycle is typically 15-20 years CIP Planning Identify SCADA needs in advance Add the costs for SCADA projects to the CIP Master Plans Either overall or SCADA Master Plans can help justify Are a formal document identifying a need and path Master Plans typically have a list of projects

How to fund SCADA projects? Add-on Strategies Take advantage of plant expansions or refurbishments Add fiber optic cable when installing underground assets like pipelines Follow the IT model and specify the right equipment and software Justifications Improve safety Downtime or spill costs versus more instrumentation and visibility Go from 24/7/365 to only M-F 8-5 operators Remote visibility/control for all Reduce energy and maintenance costs

Discussion Questions What are some misconception you had about SCADA systems? What funding strategies have you found successful for funding SCADA projects?