Antiproton Lens Replacement Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target Station Group.

Slides:



Advertisements
Similar presentations
R&M Fiberliner LAN / WAN applications R&Measynet.
Advertisements

How to apply a TXV kit to an evaporator coil – Initial installation
Weather Discussion Synopsis Final check-up on Hurricane Adrian NC weather conditions from 6/9 (Thursday) through 6/14 (Tuesday)
AUTOMOTIVE COOLING SYSTEMS
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Weather diary 31ST March-6 April hungary,Marcali.
+ St. Mary and St. Joseph Coptic Orthodox Church.
Next Home µox Compact troubleshooting guide Start the slide show then click Next.
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Slide 1 CP Rectifier development – A tight squeeze. Richard Brodribb, M. Brodribb Pty Ltd
ESLS 04 Daresbury Laboratory
Day of the week 9:00 – 10:00 10: :00 12: :00 13: :00 14: :00 15: :00 16:00 – 17:00 17: :00 18:00 – 19:00 19:00 – 20:00.
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Grade 2 Created by; Kim Smith
BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
Training for YOUR marathon! Chris Leigh. The 4 Ps of marathon training PLANNING PROGRESSION PERSONAL PATIENCE.
Week 1.
Shiretoko Model Plans. Model Plan during Bear Activity Period (for groups of 20 or less) Alternative Course Day 1 12:40 Depart Utoro lunch location 12:50.
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
The Swagelok® SSV Series Stream Selector System for Process Analyzer Applications Swagelok introduced the next generation of stream selection technology.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
AP-0 Target Hall Experience Fermilab Anti-Proton Source P. Hurh ( ) Mechanical Support Dept. Fermilab Anti-Proton Source P. Hurh ( ) Mechanical.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.
Progress of the BEPCII Injection System Kang Wen.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
Days of the week instructions. Children can; Order the days of the week. Use sentence strips and activity cards to write sentences about what they do on.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Antiproton source startup report Bill Ashmanskas Prevault sump water rerouted to Main Ring OTR installation in AP1. (Another OTR will go into.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
ORBUMP Power Supply... 16x3 SCR’s Pulse Forming Network (PFN) - looks like a very slow transmission line. Flat top ~ (10 usec)*(number of cells). Reduced.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
TC meeting P2 planning wks 3&4 A.Tauro
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
1 Target Station Design Dan Wilcox February 2012.
SRF Operating Experience at JLab
Automotive Heating And Air Conditioning
Completion of the MICE-US construction project
MICE Target Report Video Conference 29/11/07
Hall A Target Status 9/27/16 Dave Meekins.
Radiation Laboratory Meeting
Main Coupler R&D at DESY
Lithium lens and window tests
Presentation transcript:

Antiproton Lens Replacement Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target Station Group

Fri Saturday 00:00 Sunday Monday Initial Failure at 18:40 Friday Determined problem in vault and not the power supply Appeared as open circuit

Fri Saturday 00:00 Sunday Monday Lens change-out crew arrive, open vault, remove module with lens/transformer assembly and discover problem

Fri Saturday 00:00 Sunday Monday

Fri Saturday 00:00 Sunday Monday Strip-line failure (1 st time seen) Moved on to installing previously used 10mm-2 lens (high gradient) 10mm-2 history: Used 1 week in May07 before water leak caused transformer to fail Lens installed in a new transformer during shutdown07 Used Oct-Dec07 During Target change-out photograph showed tie-rod working its way out Tie-rod repaired early Jan08

Fri Saturday 00:00 Sunday Monday 10mm-2 lens put upon module and connections made Failed water circuit test (pressurized gas) 2 pairs of 8ft tubes run though module (provide water cooling for lens and transformer) connect to brass block (patch panel) of lens/transformer assembly. Depending upon brass block, order of connection can make difference of leak Could not disconnect one water tube

Fri Saturday 00:00 Sunday Monday Meeting to discuss options: Repair 10mm-2 brass block – water tube connection vs installing low gradient lens 32 Low gradient means a 12-15% loss of yield 8days low gradient = 7days high gradient Repair plan was chosen

Fri Saturday 00:00 Sunday Monday Water tube was forcibly removed from brass block 10mm-2 lens/transformer assembly un-installed from module New water tube installed on module New brass block was taken from another low gradient lens Brass block swap-out performed on 10mm-2 Re-install 10mm-2 lens/transformer assembly to module Pressurize gas test - still leak 10mm-2 lens/transformer assembly un-installed from module Determine leak on connection of line into lens -- tightened

Fri Saturday 00:00 Sunday Monday Upon moving lens/transformer assembly to prepare for re- connection to module, hit a water line Replaced water line Reconnect lens/transformer assembly to module Passed water circuit test!! HiPot of module + lens/transformer find 1500V New lens are 3000V Earlier HiPot of 10mm-2 was reasonable Experts decided to install into vault and pulse at low setting to see if can change HiPot Power supply trip on load overcurrent

Fri Saturday 00:00 Sunday Monday Disconnected from power supply HiPot of module + lens/transformer find 3000V !! Vault stripline HiPot is also fine Connect power supply to pulse … ground fault Problem getting power supply to turn on with dummy load Movement of control cards about get supply to pulse with Back to original configuration…able to pulse dummy load Another HiPot of module + lens/transformer shows good Power supply re-connected to lens/transformer … Pulsing!!! Will gradually bring up to operation gradient and then put rest of shielding blocks back. Should be stacking within a few hours