Problematic time series and how to treat them

Slides:



Advertisements
Similar presentations
Modeling Recession Effects and the Consequences for Seasonal Adjustment Demetra Lytras Office of Statistical Methods and Research for Economic Programs.
Advertisements

Seasonal Adjustment of National Index Data at International Level
Time Series Building 1. Model Identification
Using Demetra+ in daily work at NBP – SA in the time of crisis Sylwia Grudkowska, Department of Statistics, NBP.
Performance of Seasonal Adjustment Procedures Philip Hans Franses, Richard Paap, and Dennis Fok Econometric Institute Erasmus University Rotterdam.
(ons) Seasonal Adjustment in Official Statistics Claudia Annoni Office for National Statistics.
OECD Short-Term Economic Statistics Working PartyJune Analysis of revisions for short-term economic statistics Richard McKenzie OECD OECD Short.
J. Khélif Insee July 2008 A quality report for seasonally and trading day adjusted French IIP.
Demetra+ Quick Tour Versatile software. Choose the right tool Demetra+ main feature: multi-processing Demetra+ in production. Understanding.
13-Jul-07 European Statistical System guidelines on seasonal adjustment: a major step towards PEEIs harmonisation C. Calizzani – G.L. Mazzi – R. Ruggeri.
4 May 2010 Towards a common revision for European statistics By Gian Luigi Mazzi and Rosa Ruggeri Cannata Q2010 European Conference on Quality in Official.
United Nations Economic Commission for Europe Statistical Division Seasonal Adjustment Process with Demetra+ Anu Peltola Economic Statistics Section, UNECE.
The Examination of Residuals. Examination of Residuals The fitting of models to data is done using an iterative approach. The first step is to fit a simple.
United Nations Statistics Division Re-weighting, linking and re- referencing the IIP.
Overview of Main Quality Diagnostics Anu Peltola Economic Statistics Section, UNECE UNECE Workshop on Seasonal Adjustment 20 – 23 February 2012, Ankara,
Ketty Attal-Toubert and Stéphanie Himpens Insee, France 16th of November, 2011 ESTP course Demetra+ Demetra+ for X12 in Daily Work.
Confidence intervals and hypothesis testing Petter Mostad
Time series Model assessment. Tourist arrivals to NZ Period is quarterly.
Issues for discussion in the Workshop on Seasonal Adjustment Anu Peltola Economic Statistics Section, UNECE UNECE Workshop on Seasonal Adjustment 20 –
1 Departamento de Contas Nacionais / Serviço de Indicadores de Curto Prazo National Accounts Department / Short Term Statistics Unit Using Demetra+
* The views expressed are the personal opinion of the author and do not necessarily reflect the official position of the Deutsche Bundesbank 1 ESS Guidelines.
SADC Course in Statistics Forecasting and Review (Sessions 04&05)
Ketty Attal-Toubert and Stéphanie Himpens Insee 22nd of June, 2011 An Overview of seasonal adjustment in the short term statistic department.
Testing seasonal adjustment with Demetra+ Dovnar Olga Alexandrovna The National Statistical Committee, Republic of Belarus.
April 2011 Testing Seasonal Adjustment with Demetra+ Ariunbold Shagdar National Statistical Office, Mongolia.
A comparison of automatic model selection procedures for seasonal adjustment Cathy Jones.
Towards a seasonal adjustment and a revision policy Anu Peltola Economic Statistics Section, UNECE UNECE Workshop on Seasonal Adjustment 20 – 23 February.
Using Demetra+ at SURS Manca Golmajer, Andrejka Smukavec 20 June 2013.
A Proposal for a revisions policy of Principal European Economic Indicators (PEEIs) OECD STES WP June 2008.
USING DEMETRA+ IN DAILY WORK SAUG – Luxembourg, 16 October 2012 Enrico INFANTE, Eurostat Unit B1: Quality, Methodology and Research.
Testing Seasonal Adjustment of the Price Index for tomatoes with Demetra+ Kumpeisova Dinara Agency of Statistics of the Republic of Kazakhstan, Kazakhstan.
Ketty Attal-Toubert and Stéphanie Himpens Insee 22nd of June, 2011 Using SAS to implement additional tools.
EC 827 Module 2 Forecasting a Single Variable from its own History.
Seasonal Adjustment Methods and Country Practices
Revisions in raw, working-day and seasonally adjusted data
Environmental Engg II.
Deirdre Syms, George Xia Macomb Community College November 5, 2015
Carsten Boldsen Hansen Economic Statistics Section, UNECE
Shohreh Mirzaei Yeganeh United Nations Industrial Development
Research Process №5.
Handbook on Seasonal Adjustment
Using Demetra+ at NSO of FI, - first results of testing
4th Joint EU-OECD Workshop on BCS, Brussels, October 12-13
Revision Analysis for General Economic Statistics
The expandable seasonal adjustment framework of JDemetra+
TESTING AMI PERFORMANCE OF J-DEMETRA+ Turaç YAVUZ TURKSTAT
Testing seasonal adjustment with Demetra+
Discrete Event Simulation - 4
SA results obtained with Demetra2.2 and Demetra+
Difficulties in Seasonal Adjustment
How to select regressors and specifications in Demetra+?
Seasonal adjustment with Demetra+
STATISTICAL AGENCY UNDER PRESIDENT OF THE REPUBLIC OF TAJIKISTAN
The System of National Accounts and Policy Development
Testing seasonal adjustment with Demetra+
Unit Root & Augmented Dickey-Fuller (ADF) Test
The Examination of Residuals
LAMAS Working Group June 2015
Task Force on Seasonal Adjustment of Quarterly National Accounts Second meeting Item 7 Calendar adjustment: Issues note Martin Eiglsperger Frankfurt,
Introduction to Seasonal Adjustment
Chapter 9 Hypothesis Testing: Single Population
Time series.
Yankov V.M. Rosstat, Russian Federation
Latest features Frankfurt, 7 June 2016
Model Selection, Seasonal Adjustment, Analyzing Results
Ermurachi Galina National Bureau of Statistics, Republic of Moldova
Summary of methods presented at the CMBF
Issues on Seasonal Adjustment in the EECCA countries
Using JDemetra+ at STATEC
Time Series Analysis 6th lecture Dr. Varga Beatrix.
Presentation transcript:

Problematic time series and how to treat them N. Alpay KOÇAK Turkish Statistical Institute

Seasonal adjustment of short time series For some series that are too short to be seasonally adjusted using either TRAMO-SEATS or X-12-ARIMA, it is possible to adjust them using alternative, less standard, procedures. For series that are long enough to run X-12-ARIMA or TRAMO-SEATS but remain quite short (3-7 years), some instability problems can appear. Several empirical comparisons have been done to investigate the relative performance of X-12-ARIMA and TRAMOSEATS on short time series. As a general rule when the series are shorter than seven years, the specification of the parameters used for pretreatment and seasonal adjustment has to be checked more often (e.g. twice a year in order to deal with the higher degree of instability of such series).

Seasonal adjustment of short time series Series shorter than 3 years should not be seasonally adjusted. Seasonal adjustment of short time series (3-7 years) should be performed, whenever possible, with standard tools. Moreover back-recalculated time series (even non-official) should be used to extend the sample and stabilise seasonal adjustment when they are reliable for estimating a seasonal component. Simulations on relative performances of the existing standard tools for adjustment of short series should be carried out. Users should be informed of the greater instability of seasonally adjusted data for short series, and of methods used. Clear publication policy rules should be defined. The settings and parameters for seasonal adjustment should be checked more than once per year.

Seasonal adjustment of short time series (Proposal) Use TRAMO&SEATS for the series longer than 3 years! 1) Find the best model at the start of the year, 2) fix the model specification and parameters values, and position of outliers and type of the calendar effects, 3) Check parameter stability twice a year for entire series! Do not forget that Airline model (0,1,1)(0,1,1) may be the most representative model for a series!

Mongolia Example Intitial Assumptions: Model is Airline,   Weekdays Effect with Mongolia Fixed Days Moving Holiday Regressor Effect Airline Estimation Span Level-Log Th(1) Bth(1) [I-2000 : IV-2003] Log -0.53 0.47 -0.0075 0.0687 [I-2000 : I-2004] -0.57 0.38 -0.0061 0.0684 [I-2000 : II-2004] -0.62 0.58 0.0621 [I-2000 : III-2004] 0.19 -0.0053 0.0708 [I-2000 : IV-2004] 0.15 -0.0048 0.0722 [I-2000 : I-2005] -0.70 0.28 -0.0091 0.0428 [I-2000 : II-2005] -0.63 0.27 -0.0090 0.0465 [I-2000 : III-2005] 0.29 0.0474 [I-2000 : IV-2005] -0.79 0.43 -0.0096 0.0425 [I-2000 : I-2006] -0.20 -0.13 -0.0055 0.0419 [I-2000 : II-2006] -0.92 0.26 -0.0087 0.0096 [I-2000 : III-2006] -0.97 0.24 -0.0078 0.0101 [I-2000 : IV-2006] -0.93 0.35 -0.0086 0.0094 [I-2000 : I-2007] -0.99 -0.0073 0.0003 [I-2000 : II-2007] -0.89 0.14 -0.0060 0.0055 [I-2000 : III-2007] 0.06 -0.0054 0.0085 [I-2000 : IV-2007] -0.90 0.03 0.0089 Mongolia Example Intitial Assumptions: Model is Airline, Weekdays (1 regressor) and Moving Holidays (1 regressor) are in the model. Log/Level selectioin is automatic. Airline parameters, and calendar effect parameters are estimated, every quarter. Orange : Statistically significant at 10% Yellow : Statistically significant at 5% Green : Statistically significant at 1% Trend become more deterministic. Seasonality is stochastic (moving) Weekday effect are very strange. There is no consensus between significant or not significant. Moving holiday regressor become more unsignificant when number of observation increases 

Seasonal adjustment in times of economic crises In case of economic crises or turmoil, economic time series shows sudden changes in tendency, (rapidly up or down) Given that a time series is represented by an ARIMA modelin the process process of seasonal adjustment, the changes in ARIMA model can be seen mostly. Specification of ARIMA model, Parameters of ARIMA model, Types, dates and parameters of outliers Parameters of calendar effects When new data become available at the end of the data, huge revision of old published data probably can be seen if any of properties above mentioned has been changed.

Seasonal adjustment in times of economic crises Actually, this issue is a matter of fact that which revision policy is chosen for the series. Current seasonal adjustment → More revision Concurrent seasonal adjustment → Less revision Semi-concurrent revision → Mild revision

Seasonal adjustment in times of economic crises Do not take into account an last observation as an outlier. You can not judge this point as an AO or LS

Effect of 2009Q1 Economic Crisis on Seasonal Adjusted Series

Focused! Revision History is a good tool to follow this type of changes occured in the past!