Jonathan Young ColumbiaGrid

Slides:



Advertisements
Similar presentations
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
Enoch Davies Associate Engineer Composite Load Model Implementation January 19, 2012 Salt Lake City, UT.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
Distributed Intelligence Provides Self-Healing for the Grid
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
North Mankato Load Serving study Xcel Energy Great River Energy.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Texas Nodal Electrical Buses and Outage Scheduling.
February 17, 2012 Regional Planning Group CREZ Shunt Switching John Adams Principal Engineer.
Nodal Planning Go Live Austin, TX February 3, 2011
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
PowerWorld Case Validation
Bert Peters Chair, Path Operator Task Force
Announcements Please read Chapter 6
Visibility Ramu Ramanathan 10/1/2007.
TH-57 Electrical System Review
ECE 476 POWER SYSTEM ANALYSIS
High Voltage Engineering High Voltage Direct current (HVDC)
John Dumas Director, Wholesale Market Operations
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Qiuli Yu, Jay Teixeira, and Ed Geer
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Jonathan Young ColumbiaGrid
Proposal to Remove from Service the PV-COI RAS
Philip Augustin TSS Chair
Shipboard Electrical Distribution
ECE 476 POWER SYSTEM ANALYSIS
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Presented by: LADWP November 14, 2017
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
I-5 Corridor Reinforcement Project
Update from PEAK on RAS Visualization Efforts
Removal of Fraser RAS from RAS Databse
WIND TURBINE GENERATORS.
Chapter 7 System Protection
Local Area Planning Update – TRANSAC
Base Case Build Process
Local Area Planning Update to TRANSAC – September 26, 2018
Jonathan young ColumbiaGrid
Yale Runback Local Area Protection Scheme
Jonathan Young, SDWG Chair
ADS and WPR Seed Case Background
System Review Work Group
Base Case Build Process
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Update from PEAK on RAS Visualization Efforts
Creating A Logo Part 2.
SRWG Chair Report March 2015 WECC HQ
Removal of Fraser RAS from RAS Databse
TONBRIDGE POWER GREEN LINE
ADS and WPR Seed Case Background
Tracy Rolstad TSS Chair
Palo Verde-COI RAS Retirement
Proposal to Remove from Service the PV-COI RAS
Jonathan Young, SDWG Chair
Jonathan Young SDWG Chair
Palo Verde-COI RAS Retirement
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Bert Peters Chair, Path Operator Task Force
Section Practice (Day 2) Section 6.5 Summary
Write a division equation for each.
Jonathan Young ColumbiaGrid
Presentation transcript:

Jonathan Young ColumbiaGrid SRWG’s Compliance Subgroup November 2015 Salt Lake City, UT

Discussion Topics Low voltages in base cases causing loading tripping Replog Explicitly model bypass breakers Multi-section lines Identify non-real buses DPM redlines RAS naming convention

DPM: 2017 Base Case Comp Sched Red Line Model Bypass Breakers Change “Emergency Ratings” to “Contingency Ratings” RAS Naming Convention Substations Removal of Multi-Section Lines Duplicate Star Bus Numbers Data Maintainer Field Multiple shunts on a bus Base Load Flag inconsistencies

DPM: Possible Future Additions Base Load Flag inconsistencies Multiple shunts on a bus Duplicate bus numbers Other option for turbine type Generators on BES buses Change “Emergency Ratings” to “Contingency Ratings” RAS naming convention PC/Data Submitter Field

RAS Naming Convention Suggested Convention RAS and Elements precluded by Member System Accronym and ann Underscore i.e. “SCE_”

Questions/Comments?