TYPES OF REPLACEMENT DECISIONS

Slides:



Advertisements
Similar presentations
Chapter 9 Introduction Capital budgeting is the decision-making process used in the acquisition of long-term physical assets. Traditional capital budgeting.
Advertisements

5/31/20141 HFT 4464 Chapter 9 Introduction to Capital Budgeting.
Chapter 11 Cash Flow Estimation
(c) 2001 Contemporary Engineering Economics 1 Chapter 15 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©
Impact of Taxes on Replacement Decisions
Chapter 9: Replacement Analysis
Engineering Economics in Canada
Replacement Study Fundamental Issue Over time, company assets need to be replaced due to: Reduced performance Altered requirements Obsolescence A replacement.
Replacement Analysis. Chapter 11 - Replacement Given a cash flow profile for current and replacement equipment, be able to use either the cash flow or.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Replacement.
Engineering Economy Practice Problems
INFO 630 Evaluation of Information Systems Prof. Glenn Booker Week 8 – Chapters INFO630 Week 8.
McGraw-Hill/Irwin Slide 1 McGraw-Hill/Irwin Slide 1 Capital budgeting: Analyzing alternative long- term investments and deciding which assets to acquire.
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
COMPARING ALTERNATIVES
Engineering Economic Analysis Canadian Edition
Chapter 11 Replacement Decisions
COMPARING ALTERNATIVES
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Capital Budgeting – Final Analysis For Students, Term 1, 2002/03 02_Lecture11.ppt.
CHAPTER 9 Replacement Analysis.
Chapter 8 -- Estimating Incremental Cash Flows u Relevant Cash Flow u A cash flow that is caused by a course of action or project u Irrelevant Cash Flow.
Project Cash Flow – Incremental Cash Flow (Ch – 10.7) 05/22/06.
© 2012 by McGraw-Hill All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 11 Replacement.
Making Capital Investment Decisions Estimating Cash Flows Special cases.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
1 Cash Flows and Other Topics in Capital Budgeting Chapter 10.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
1 Modeling Economic Life… Total EAC = EAC of Ownership + EAC of Operation Objective is to determine the optimum number of years to own an asset that minimizes.
1 Replacement and Economic Service Life Replacement Analysis When to replace an asset, and what to replace it with? Outsider’s Perspective… What would.
1 Replacement Decisions How should an asset be replaced? If an asset can be overhauled and used a little longer, should those funds be invested in the.
Cost/Benefit Analysis Review Cost/Benefit can done using NPW or EAW, pick one! (choose whichever method is easiest for the problem statement) Criteria:
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Relevant Costs and Benefits for Decision Making
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Developed.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Differential Analysis and Product Pricing Chapter 12.
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
10-0 Making Capital Investment Decisions Chapter 10 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
Engineering Economic Analysis Canadian Edition
Comparing Economic Alternatives Using time value of money to choose between two or more options.
Chapter 12 Analyzing Project Cash Flows. Copyright ©2014 Pearson Education, Inc. All rights reserved.12-2 Slide Contents Learning Objectives 1.Identifying.
Replacement Analysis and Economic Life Should we replace an asset that we own now or later?
Comparison of alternatives
Replacement Analysis Lecture No. 46 Chapter 14
Chapter 6: Comparison and Selection Among Alternatives
Engineering Economics
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 9: Replacement Analysis
Engineering Economics
REPLACEMENT DECISIONS
Decision Making and Relevant Information
Chapter 6: Comparison and Selection Among Alternatives
Cost/Benefit Analysis Review
Chapter 6: Comparison and Selection Among Alternatives
OUTLINE QUESTIONS? NEWS? REMINDERS: EVALUATIONS
Engineering Economics
Economic Life Economic life refers to the asset retention time(n) that yields its lowest equivalent AW Example: Determine the economic life of an asset.
Presentation transcript:

TYPES OF REPLACEMENT DECISIONS Aging assets may be: kept without major change retired (removed) without replacement overhauled to improve performance replaced with another asset. JK Higginson: Engineering Economics

WHY REPLACE ONE ASSET WITH ANOTHER? If the current asset is inadequate and has to be replaced If the current asset is adequate, but there is a less expensive or more efficient way to obtain the same service JK Higginson: Engineering Economics

RELEVANT COSTS FOR ANALYZING ASSET REPLACEMENT Capital costs Installation costs Installation costs occur at the beginning of the life of new assets and are not reversible once the asset has been put in place Operating and maintenance costs Operating and maintenance costs typically increase as the asset ages. Disposal costs and salvage costs JK Higginson: Engineering Economics

MAKING REPLACEMENT DECISIONS Once a new asset has been put in place, the incremental cost of keeping it typically is low. This gives the existing asset (called the defender) an advantage over a potential replacement (called the challenger). To make a replacement decision, all relevant costs must be considered. Typically, this is done through equivalent annual cost (EAC) computations. JK Higginson: Engineering Economics

TYPES OF REPLACEMENT DECISIONS Case 1: Challenger is the same as the Defender (the “economic life” problem). Case 2: Challenger is different than the Defender, and succeeding Challengers are the same as the first Challenger. Case 3: Challenger is different than the Defender, and succeeding Challengers are different from the first Challenger. JK Higginson: Engineering Economics

CASE 1: CHALLENGER IS THE SAME AS DEFENDER In the case when technology is not changing quickly and when prices and interest rates are not changing rapidly, an asset often will be replaced with the same type of asset. Each asset is replaced when its lifetime cost is minimized. At this time, the asset is said to have reached the end of its economic life. The lifetime will be the same for all replacement assets for the time period over which the asset is needed (assumed to be a long time). This results in cyclic replacement. JK Higginson: Engineering Economics

ECONOMIC LIFE OF AN ASSET Equivalent annual cost (EAC) of capital costs decrease as the asset is kept longer. EAC of operating and maintenance costs increase as the asset is kept longer. There will be a lifetime that will minimize: (EAC of capital costs) + (EAC of operating and maintenance costs) This is the “economic life” of the asset. JK Higginson: Engineering Economics

CASES 2 AND 3: CHALLENGER IS DIFFERENT FROM DEFENDER Case 2: All succeeding challengers are the same as the current challenger. Case 3: The challengers after the current challenger will be different (most likely better). JK Higginson: Engineering Economics

CASE 2: SEQUENCE OF IDENTICAL CHALLENGERS Step 1: Find EAC at the economic life of the challenger. Step 2: Find the cost of keeping the defender one year. Step 3a: If EAC(defender, one more year)  EAC(challenger), keep the defender at least one more year Step 3b: ELSE: IF: there is a “life” for the defender that will give an EAC less than EAC(challenger), keep the defender for that “life” and then replace ELSE: replace the defender immediately JK Higginson: Engineering Economics

ASSUMPTIONS MADE IN THE SOLUTION OF EXAMPLE 2 The challenger will be replaced by a stream of machines with identical technology (that is what allowed us to compute the economic life of the challenger). The installation cost of the Defender is irrelevant because we cannot change the past; ie., it is a “sunk cost”. The “first cost” of keeping the Defender is its salvage value now, i.e. the revenue that we would receive if we sold it now. This is the “opportunity cost” of keeping it. JK Higginson: Engineering Economics

CASE 3: SEQUENCE OF DIFFERENT CHALLENGERS Normally, we may expect the future challengers to be better than the current challenger. Then, do we skip over the current challenger and wait for the next “new and improved” challenger? Do we wait even longer for the next-generation “new and improved” challenger? We would have to enumerate all possible combinations of decisions and evaluate all decisions to make a choice. JK Higginson: Engineering Economics

CASE 3: SEQUENCE OF DIFFERENT CHALLENGERS The EAC for each project would have to be calculated (quite a bit of work!). The list would increase geometrically if we expect that each Challenger was different from the preceding one. Typically, we will have very little information about the costs and benefits of new challengers. It is often reasonable to assume that all challengers in the future will be approximately the same as the current challenger. How do we make a replacement decision when we need the asset for a finite period of time (e.g., for a contract of specified length)? JK Higginson: Engineering Economics