Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
School Closure/Consolidation Composition of School Closure Committee (SCC) Closure/Consolidation Criteria Timelines.
2007 – 2008 Academic/Business Plan …a strategic initiative School District of Palm Beach County New Horizons for Student Success.
MAINTENANCE MANAGEMENT Module 9
Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
Introduction to Military Certification Office
School Community Councils Working Together for School Improvement.
October 7, 2014 A Presentation to the Caddo Parish School Board by: Evergreen Solutions, LLC.
NON-ROUTINE MAINTENANCE FACILITY UPGRADES EQUIPMENT CHRIS STARR LSRCP.
1 Requirements and the Software Lifecycle The traditional software process models Waterfall model Spiral model The iterative approach Chapter 3.
ITIL: Service Transition
FCRPS BIOPHatchery BIOP Program HGMP’s ESA coverage New Hatchery Reform Actions Program Description & Assessment Selection of Projects for New HSRG/HRT/HGMP.
109 Civil Engineer Support Equipment SEABEE COMBAT WARFARE NCF OFFICER SPECIFIC.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Lancaster County Replacement Facility Development Strategy Presented by: CGL Capital Solutions May 19, 2011 A World of Solutions.
Darton Ito Manager, Long Range & Capital Planning Drew Howard
INDUSTRIAL & SYSTEMS ENGINEERING
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
State of 2009 State of Good Repair Roundtable New York City Transit July 2009.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
2014 Budget Department Presentations Infrastructure Funding Options.
SPACE ADMINISTRATION IN HIGHER EDUCATION INSTITUTIONS – BARRIERS AND OPPORTUNITIES Jean Skene Director: HEMIS Department of Higher Education and Training.
1 RHD Cost Sharing Review Update 2011 UBCM Convention Presented by RHD Cost Sharing Review Implementation Group September 26, 2011.
FTA SGR Transit Agencies Feedback Session Results Presented by: PricewaterhouseCoopers Kristy Fridley, Mark Baumgardner, and Charles Baldwin.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
1 UTA & Alternative Fuel Vehicles GOVERNOR’S ENERGY DEVELOPMENT SUMMIT JUNE 2014.
NCTPA ACCOMPLISHMENTS. NCTPA Overall Work Program (OWP) Serves as a reference to be used by citizens, planners, and elected officials throughout the year.
Transit Asset Inventory Development & Integration Third State of Good Repair Roundtable Tracy Beidleman Director of Programs and Grants.
Department of General Services Strategic Capital Asset Management (SCAMP) “You Can’t Manage What You Can’t Measure” COUNTY OF SAN DIEGO.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Niagara Frontier Transportation Authority: The Niagara Frontier Transportation Authority is a multimodal organization serving the Buffalo Niagara Region.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
LOCAL OPTION SALES TAX FOR EDUCATION TIMELINE AND PROPOSED PLANS AS OF MAY 26, 2015 *THE DISTRICT CONTINUES TO SEEK INPUT/SUGGESTIONS FROM BOARD MEMBERS,
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Operating Budget Funding Sources State Appropriations - General Revenue Formula Funding, Special Items, Benefit Cost Sharing THECB Transfers TX Grant,
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
State of Georgia Release Management Training
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Los Angeles County Metropolitan Transportation Authority FY16 Budget Development: Preliminary Capital Program Board Staff Briefing February 12, 2015 The.
1 Perspectives on Reauthorization Robert Tuccillo Associate Administrator for Budget and Policy/ CFO Federal Transit Administration State of Good Repair.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Implementing Program Management Standards at Duke Energy.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Chapter 6 6 Maintenance C H A P T E R Brent Beggs.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
DEVELOPMENT Assessment Planning Design Reading Blueprints Funding
ITIL: Service Transition
2017/18 SIP Request Process September 2016.
Understanding the Asset Management/TAM Regulations
Capital Project Needs Assessment
NC AWWA-WEA 97th Annual Conference
Preparing Your TAM Plan
Updating Capital Asset Records
Fixed Assets (Capital Assets)
MVD System Modernization Implementation Request
Public Schools Facilities Authority
Kentucky County Treasurer’s Fundamentals Course
The Asset Management Journey for Building Assets
Capital Improvement Plans
Phoenix Public Works Support Services
Presentation transcript:

Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric trolley) Transit Centers …. 10 Park & Ride lots …. 132 Passenger shelters …. 1,536 Trolley Overhead wire …. 71 miles Transit Bases …. 7 Bus stops …. 9,549 Annual boarding …. ~119 million Transit employees …. 4,644 Operating expense …. ~ 500 million

Program Structure Three asset management programs Fixed assets Vehicles (revenue and non-revenue) IT (hardware and software) Fixed assets are grouped into four categories for inventory and inspection purposes. civil architectural mechanical electrical

King County Metro Transit Asset Management Program (TAMP) PROGRAM MILESTONES 1985 Program Initiated. Early 1990s all Transit Facilities and Infrastructure was included 2003 first full time Program Manager hired TAMP Team created including: Facilities Management, Engineering, Vehicle Maintenance.

Mission Statement (Fixed Assets) Preserve existing King County Transit plant and equipment to accomplish the purpose(s) for which they were constructed or purchased. Replace equipment and/or infrastructure as indicated by the facilities and equipment assessment, life cycle projections, condition inspections and maintenance reporting

What is in the TAMP Approximately $1 Billion in Facilities and Infrastructure Items in the program but not presently incorporated fully into TAMP – Downtown Seattle Transit Tunnel – Structured Parking Garages – Transit Facility Security Systems Within the current Capital Improvement Period ( )TAMP expenditures will total approximately $10 million per year. Asset categories not included in the TAMP Program - IT systems, hardware and software - Revenue vehicles - Non-revenue vehicles

TAMP Organization For King County Metro KC TAMP is organized into three distinct replacement models at the component and sub-component level. – Facilities & Infrastructure (this includes large building systems such as HVAC, Other Mechanical and Plumbing, Lift replacement, Building systems such as roofs, and electrical.) – Equipment Replacement (this includes all capital equipment ($5K or greater) that does not require significant engineering or building modification to install). Plug and play approach. – Regular Asset Replacement (this includes replacement or refurbishment of similar assets on a regular schedule such as bus passenger shelters and electric trolley bus infrastructure (pole and switch replacement)

The King County Asset Management Program Is Managed By A Team The team consists of members representing Facilities management/maintenance (team lead), engineering, design, construction, project management and budget personnel. The team members have project management experience as well as expertise in their respective disciplines. The team solicits input from a variety of stakeholders, including operating and maintenance work units, planners and service planners.

Key Functions Of The King County Metro Asset Management Team Produce an annual Facilities Condition Report (FCR). The FCR includes inspection information, condition ratings, and project recommendations. The information contained in the FCR is used in conjunction with maintenance records and lifecycle information to determine asset replacement schedules. Prioritize/select projects from the FCR for the next year and the remaining capital planning horizon. The FCR is also used to assist in development of a programmatic budget for asset replacement. The planning horizon is normally six years. Track and report schedule/budget for current year program status.

Current Approach for Capital Asset Management and Replacement at King County Metro Transit. Multi-disciplinary team structure. Organized along the lines of business. Facilitate communication among all stakeholders. Selection/prioritization of projects are formalized to assure a rational basis for decision making, assuring best use of available funds and personnel.

Structure of the TAMP Program 1990 installed CMMIS DataStream MP-2 (for Asset and maintenance record keeping) 2008 purchased EAM system Infor 8e (go live date scheduled for September 09) Life cycles cycles place Assets into 3 tier replacement window (near term 1-6 years, mid term 6-15, long term beyond 15) Annual inspection cycles, maintenance records and other criteria of near term Assets place asset condition on a rating scale of 1-5 Engineering develops scope and cost estimates for refurbishment or replacement. TAMP team determines an annual work plan based on condition, budget, and a variety of other factors previously discussed

Asset management Process Assets are assigned a numerical life cycle based on industry standards, manufacturers recommendations, transit experience and best practices. Annual inspections held for assets which fall into the life cycle replacement planning window of 6 years. 6 year planning horizon includes consideration of technology changes, mandatory and regulatory concerns, safety and risk, cost benefit, service criticality, business practice changes and internal politics. Annual inspections and testing preformed at the component and sub- component level for assets that appear in the planning horizon Funding appropriation requests made based on inspection results and prioritization of equipment and systems to the above criteria. Annual work program established

State of Good repair Current definition: An asset is determined to be in a State of Good Repair (SGR) when the evaluated asset (system, equipment, or component) is in a condition where/when it can continue to meet and perform adequately for the purpose to which it was acquired and be safely operated and maintained with-in the parameters set forth by the manufacturer. Factors other than a SGR may be considered when determining replacement or refurbishment of an Asset.