Transformation of DoDs Tactical Petroleum Distribution Capability: Replacement of the Current Off Shore Petroleum Discharge System by a Turn-key Commercial.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration Global Results.
Advertisements

BETTER SOLUTIONS KMS : PRESS Transport/Installation
Sector Puget Sound COTP/FOSC Report: CDR Agneta Dahl Contingency Planning & Force Readiness 15 November 2011.
United States Coast Guard OSC BRIEFING USCG SECTOR COLUMBIA RIVER 15 November 2011.
MARINE MONEY CONFERENCE DUBAI, MARCH Saleh Al-Shamekh President Oil & Gas The National Shipping Company of Saudi Arabia ( NSCSA )
Chapter 6. Competitive strategy: The analysis of strategic position
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Transport and Station Observations and Recommendations January 26, 2005 TOMA – Diesel Fuel Marketers Seminar Nashville, TN TRANSPORTATION OF ULSD MAP.
- legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Site Selection March 2010.
Scotch Marine Boiler Design
GREEN GLOBAL LOGISTICS VIETNAM (GGLC) GGLC - Your Reliable Partner NO.01, CAI LAN ROAD, BAICHAY, HALONG CITY, QUANGNINH PRO., VIETNAM TEL/FAX: (84) ;
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Chapter 12 Lesson Goal After completing this lesson, the student shall be able to make hydrant connections and draft from a static water source according.
1 Managing Tactical Water Purification Waste Streams TerraGroup Corporation.
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Fire Protection Systems
Confidential and Proprietary to Food & Restaurant Solutions Int'l LLC Copyright 2010 CASE STUDIES January 1, 2010 Confidential and Proprietary to Food.
PRESENTED BY: FELIX A. NEGRON AMERICAN PRECIOUS METAL RECYCLING LLC As of 23 February Mining Projects in 7 Countries.
Sprayer Economics Gary Schnitkey University of Illinois.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Offshore Wind Floating Foundations the competitive technology
Murray River Project Update Coal Forum October 2013.
Coal to Liquids Plant Site Selection in WV Douglas G. Patchen October 25, 2007.
Who We Are Owned and operated by the LeVasser family since (Medley, FL) Supplying South Florida’s marine, commercial, and industrial companies with.
LONE STAR TECHNOLOGIES, INC. IPAA Annual Meeting October 25, 2005.
VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.
Anti-Trust/Competition Law Compliance Statement INTERTANKO’s policy is to be firmly committed to maintaining a fair and competitive environment in the.
P R E S E N T.  We appreciate the opportunity to introduce you to our water based, (not petroleum or acid based), chemicals that dissolve the paraffin.
DIALOG Jubail Supply Base
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
J.D. NEUHAUS powered by air J.D. Neuhaus L.P. The Force To Lift Your Business J.D. Neuhaus LP 9 Loveton Circle Sparks, MD Phone:
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
SMALL SCALE LNG PROSPECTS
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Helix Energy Solutions Group, Inc. (HLX) NYSE Recommendation: BUY Price (10/3/14): $21.55.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
The Natick Soldier Center Matthew Hill | Bret Richmond Polina Segalova | David Yoshida Franklin W. Olin College of Engineering 3 November 2003.
OVERVIEW OF PETROLEUM ENGINEERING.
USS MISSISSINEWA (AO 59) Oil Offloading Operations Ulithi Atoll, FSM February 2003.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Intermediate SFFMA Objectives: – Hrs received.
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Deepwater drilling challenges Gm, Drilling – murphy malaysia
NAVAL FACILITIES ENGINEERING COMMAND 13 July 2015.
TRANSPORTATION MANAGEMENT
NFPA 31 Standard for the installation of Oil- Burning Equipment
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
ASC – On The Line ASC – On The Line APBI GMASS II Information Brief 21 Aug 08 UNCLASSIFIED.
CURRENT PORT OPENING COMPANY DESIGN. PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES,
Military Sealift Command PM-5 JLOTS Team Sealift - Ships, People, Innovation.
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
Oklahoma Small Business Manufacturing for Aviation Conference Presentation - Subcontracting August 10, 2005 Nathaniel Stevens Sr. Systems Engineer.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Euromed October 2010 A Flexible Desalination Solution.
COMMAND STAFFING Presented by Adrienne Somerville AIR 2.0 Technical Lead 26 July 2007 Enabling the Right Skills At the Right Time To Accomplish the Right.
FSCS/TRACER Wheels v. Tracks 19 January 2000 LTC Jack Reiff DPM FSCS
Outsourcing “A practice used by different companies to reduce costs by transferring portions of work to outside suppliers rather than completing it internally.”
Rehabilitation Program impact on Sewer Management
Subsea 100 Global Services Products Presentation
Cargo Solutions for Palma, Mozambique.
NAVSEA SUPSALV Mission
2009 Tropical Cyclone Conference
Presentation transcript:

Transformation of DoDs Tactical Petroleum Distribution Capability: Replacement of the Current Off Shore Petroleum Discharge System by a Turn-key Commercial System 7 February 2005

Off Shore Petroleum Discharge System (OPDS) 4 Govt owned OPDS tankers years old –2 forward deployed, 2 in ROS –System designed in early 80s. –Manpower intensive –Very weather dependent

Transformation of DoDs Tactical Petroleum Distribution Capability 1997 MSC proposed commercial industry provide a contractor owned contractor operated performance based solution –Conducted two Market Surveys with significant commercial interest CDR USPACOM msg DTG Z Aug 03 –Recommended to JCS: MSC commercial OPDS option be pursued –Old Requirement: deliver 1.2M gal/day from 4 miles –New Requirement: deliver 1.7M gal/day from 8 miles JCS directed USTC to pursue and demonstrate the MSC OPDS option. –RFP issued 31 Oct 03 –Tech eval team: JCS J-4, PACOM, DESC, NAVSEA, TRANSCOM, MSC –Final offers received 7 Oct 04 MSC Msg DTG Z DEC 04 –3 Options- option for 1 system approved –Contract awarded 25 Jan 05

Requirements Deliver 1.2M gallons per 20 hour dayDeliver 1.7M gallons per 20 hour day Deliver fuel from 4 miles off-shore Deliver 2 products from 2 miles Deliver fuel from 8 miles off-shore Single product Install in up to five foot wavesInstall in up to six foot waves Install with up 1.5 Knot surface currentInstall with up 3 Knot surface current Install with winds up to 16 knotsInstall in wind up to 30 knots Install over bottom of Mud, Sand or CoralInstall over bottom of Mud, Sand, Rock, Shell or Coral Deliver product in the following conditions: 40-knot wind 12-foot waves 4-knot current 1.5-knot cross current Deliver product in the following conditions: 42-knot wind 12-foot waves 5-knot current 1.5-knot cross current foot tidal range 1984 Requirement2003 Requirement

Approved Option Procure one 8 mile system immediately - Annual cost $28.2M - Demonstration required for acceptance Upon delivery of new system -Transfer two deployed old systems to the RRF (DESC cost $33.7M) -Transfer two of the old systems to the NDRF. One RRF OPDS could be layberthed in the far east. - Off set loss of one forward deployed system Advantage: -provides system which fully meets the PACOM requirement within the funding currently available. -Option exist-second new 4 or 8 mile system.

Chouest Team Edison Chouest Offshore (ECO)-lead for 3 company team. –Louisiana offshore vessel service company –Designs, builds and operates their own vessels. –Owns & operates 130 offshore vessels –Total of 350 vessels of all sizes, including river tugs and barges Tecnip –Among top five in field of oil, and gas engineering/construction –Specializing in the production and installation of flexible pipe Defense Support Systems (formerly Day Zimmerman), –Large engineering firm currently operating OPDS training school –Provide technical support to NAVSEA on OPDS

System Strengths Dynamic Positioning –No anchoring system required –Oil field proven technology –Support Vessel-DP-2, Tender DP1 –ECO operates 60 DP vessels world wide High Pressure Flexible Pipe –Smaller outside diameter-easier to handle –Minimize impact from currents –2 mile sections-fewer connections Hose is Sink Sink –Sits on bottom more firmly Tender Vessel –Shallow draft vessel with high horse power

System Capabilities LARC –Deliver BTU and Beach Tractor to beach –Large winch to haul conduit ashore Support Vessel and Tender each carry RHIB Pipe floats for up to 6Kft- if required Side scanning sonar on Support vessel –Complete route survey Mission Specialist Team-8 people –2 Senior permanently embarked –6 Other Mission specialists only for deployments 2 system deployments per year

Tender OPDS Support Beach Tractor BTU New System Deployment

OPDS Support Vessel

OPDS Tender Vessel Beach Tractor OPDS Major Subsystems

Flexible Pipe

Tender Vessel Tender OPDS Support Beach Tractor 1.LARC delivers BTU & tractor to beach 2.Support Vessel approaches beach 3.Tender/RIB deliver messenger/pipe end to beach 4.Support vessel lays pipe sink/sink Deployment Step 1 BTU

OPDS Support Beach Tractor BTU 1.Support vessel lays pipe 2.Support vessel detaches from Pipe Deployment Step 2

Tender OPDS Support Beach Tractor BTU Deployment Step 3 1.Support vessel tows tanker to pipe end 2.Tender connects to stern of tanker 3.Support vessel maintains position with DP

Multi-Mission Vessel Open ocean tow –Vessels up to 63,000 DWT, minimum bollard pull 50 tons. Auxiliary fireboat in remote locations. –2,000 GPM of water at 125 PSI. Chemical, Biological, Radiological decon support to MSC chartered and government owned vessels. –200 cubic feet of storage for additional equipment –Additional government supplied training for 6 crew members. High speed Force Protection: –OPDS Tender Significantly improves readiness of APF Reduces Risk Funded by APF (Army, Navy Air force)

Considerations Replace single skin OPDS tankers with on call modern Double hulls Separating System from Tanker increases flexibility: –Reduce number of tankers –Shallow water ops would be feasible. –Supply different product as required. Commercial time charter –Fleet recapitalization without capital investment –Leverage commercial industry in training –Increase ability to reengineer rapidly Two Exercise deployments/yr included in rate.

Conclusion This performance-based contract is an outstanding example of how to leverage commercial capabilities to meet military requirements without a lengthy R and D process or significant capital investment.

Back up

Civilian versus Military Current OPDS installed by military OPDS not combat system –Military personnel not required to install –OPDS tankers operate < 4 miles from shore by civilians. Nothing militarily unique in this mission Current system designed by contractors –All military training provided by contractors Civilians do not require special training