ABC Chemical Complex1 Pipeline Repair ABC Company ABC Chemical Complex Engineering Specification.

Slides:



Advertisements
Similar presentations
MATERIAL SAFETY DATA SHEET
Advertisements

Job-Site Safety 101 May Job-Site safety is the simultaneous application of procedures, products, and employee participation.
HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
BLR’s Safety Training Presentations
Compressed Gases Slide Show Notes
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
ABC Chemical Complex1 PIPELINE SPECIFICATIONS ABC Company ABC Chemical Complex Engineering Specifications.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
COMPRESSED GASES. Compressed Gases Chemicals include oxygen, argon, nitrogen, helium, acetylene, hydrogen, nitrous oxide, carbon dioxide, ammonia, chlorine,
STEM Room 305 Mrs. Barbour.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Hazard Communication Chemical Specific. Determine hazardous chemicals in work areas Consult the list of hazardous chemicals Chemical manufacturers supply.
© BLR ® —Business & Legal Resources What’s the Big Deal? Flammable and combustible liquids: Are easily ignited and ignite with explosive force Burn.
1 Hot Work Permits Corporate Environment Safety & Health.
Standard 29 CFR Part Welding, Cutting and Brazing Training.
OMNI FACILITY SERVICES Copyright  Progressive Business Publications Material Safety Data Sheets.
Gas Transmission Pipelines
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Lumbermen’s Underwriting Alliance
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
Small Engine Repair Developed and Presented by Scott McFarland On behalf of Gateway Community College.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
General Industrial Battery Safety Changing and Charging Storage Batteries (g)  Battery charging installations shall be located in areas designated.
MSDS = Material Safety Data Sheet
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
Standard 29 CFR Part Flammable & Combustible Liquids.
On your own piece of paper list the following items Fire extinguisher Fire blanket Eye wash station Safety shower Fume hood Goggle sanitizer Next to each.
Safe Chemical Handling
ABC Chemical Complex1 Maintenance of DOT Regulated Valves ABC Company ABC Chemical Complex Engineering Specification.
Safety Unit II.
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
HAZARD COMMUNICATION (HAZCOM) Environmental Health, Safety, and Risk Management Stephen F. Austin State University.
SAFETY OBJECTIVE Without reference, identify basic facts about hospital safety practices pertaining to biological, chemical and fire hazards with at.
Safety Training Presentation
BASIC AUTO HAZARDOUS REGULATIONS. WASTE STREAMS RIGHT TO KNOW LAW n Hazard Communication Act of 1983 n Places some responsibility on Employer n Places.
HAZARDOUS COMMUNICATION - MSDS General Chemical Safety Chemical Storage Container Labeling Emergencies MSDS - Chemical User Information.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Module 1 : Lesson 1: Working safety in the shop
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Hot Work Procedure Training
SAFETY AND TOOLS CHAPTER 2.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Copyright  Progressive Business Publications Hazard Communication.
HOUSTON, TEXAS1 Maintenance of DOT Regulated Valves ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Arc Welding Basics SECTION OVERVIEW:
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
Hazard Communication Graphic
Workplace Hazardous Materials Information System (WHMIS) Hazardous Household Product Symbols (HHPS) There are two systems of hazardous materials labeling.
Fuel Contamination Gasoline into diesel fuel – Problems Lower diesel flashpoint - fire hazard Poor operability for diesel engines, lower cetane number.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Hazard Communication Chemical Specific
Revised Spring 2007 Hazard Communication And Your Right - To - Know Dept of Environmental Safety Services.
Subpart F - Fire Protection & Prevention ( ) Flammables/combustibles - Approved containers Fire protection program/equipment 2A fire extinguishers.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Hot Work Permit Osan AB Fire Emergency Services.
Flammable Liquids Directorate of Training and Education
Courtesy of Schools Insurance Authority. Title 8, California Code of Regulations, Section 5194 Hazard Communication determines the dangers of the chemicals.
Excavation & Trenching Awareness Plus
Flammable and combustible liquids
Maintenance of DOT Regulated Valves
Flammable and Combustible Liquids
First Break To establish minimum safety requirements when performing a first break “First Break” – Refers to the initial opening of piping/equipment.
PRESSURE EQUIPMENT REPAIRS API 510/570 and ASME PCC-2 are both PCCs
PIPELINE SPECIFICATIONS
ABC Company ABC Chemical Complex Engineering Specification
Gas Transmission Pipelines
Maintenance of DOT Regulated Valves
Presentation transcript:

ABC Chemical Complex1 Pipeline Repair ABC Company ABC Chemical Complex Engineering Specification

ABC Chemical Complex2 Pipeline Repair u PURPOSE –Provides repair guidelines on above ground and buried pipelines. u GENERAL –When a pipeline is determined to be leaking, an immediate temporary repair will be made to insure public safety, minimize damage to property, and avoid damage to the environment.

ABC Chemical Complex3 Pipeline Repairs u REFERENCES –API 1104 » Welding of Pipelines and Related Facilities –API 1107 »Pipeline Maintenance Welding Practices –ASME B31.8 »Gas Transmission and Distribution Piping Systems –ASME B31.4 »Liquid Transportation Systems for Hazardous Chemicals and Hydrocarbons

ABC Chemical Complex4 Pipeline Repair u DEFINITIONS –CGI: Combustible Gas Indicator –HVL: Highly Volatile Liquid –LEL: Lower Explosion Level –MAOP: Maximum Allowable Operating Pressure –MSDS: Material Safety Data Sheet

ABC Chemical Complex5 Pipeline Repair u Consult MSDS for the pipeline product during a pipeline repair. Determine personal protective equipment specific to the chemical and request from person in charge of the repair. u The following table summarizes the minimum required safety equipment for pipeline repairs.

ABC Chemical Complex6 u Material or Chemical –Ethylene –Hydrogen –VCM Vapors –VCM Liquids –Kerosene –Ethylene Dichloride –Natural Gas u Safety Equipment –Fire extinguisher –Combustible Gas Ind. –Fire Retard. Clothing –Eye goggles –Ear plugs –Full or air face mask –Slicker suits and boots –Non-Sparking Tools

ABC Chemical Complex7 Pipeline Repair –Check for gas presence prior to welding in or around an area containing flammable gas or liquids. –Maintenance craftsman have the final authority for work to be performed. –Post warning signs at the entrances of the right- of-way during repair work.

ABC Chemical Complex8 Pipeline Repair u PROCEDURE –Leak Repairs »Leak Classification »Pinpointing the Leak - Aboveground Gas and HVL »Pinpointing the Leak - Underground Gas and HVL »Excavation »Precautions »Preliminary Failure Analysis »Initial Leak Arrest

ABC Chemical Complex9 Pipeline Repair –Methods of Repair - Corroded Areas »Repair, if possible, by cutting out a cylindrical pipe section and replacing it with a pipe of equal or greater design strength. »Do not weld on hydrogen or ethylene pipelines before shutdown/purging operations are complete. »Acceptable repairs on a pipeline during operation: u Weld a nipple over a small leak and install fitting. u Install a leak clamp over a corrosion pit. u Use a patch with rounded corners for pipe with <40K SMYS. u Repair with full encirclement welded split sleeve.

ABC Chemical Complex10 Pipeline Repair –Leak Repair - Cracks or Tears »Replace a cylindrical section containing the crack or tear with an equivalent pipe section. »Reduce the pressure to 20SMYS equivalent or less if the line cannot be removed from service. u Determine the pipe condition by visual and NDE methods. u Stop welding or heating operations on the pipe. u Drill the ends of the crack and test by NDE u Repair with a full encirclement welded split sleeve. u Request Unit Manager approval to return to service.

ABC Chemical Complex11 Pipeline Repair –Leak Repair - Gouges, Grooves, and Dents »Repair by cutting out a section of the pipeline containing the defect and replace with a new section of equivalent or higher strength and composition. »Reduce pressure to 20%SMYS or less if line cannot be removed from service. Use one of the following methods for repair: u Install a full encirclement welded split sleeve. u Repair with installation of a full encirclement welded hot tap sleeve providing the entire defect can be removed with the hot tap coupon.

ABC Chemical Complex12 Pipeline Repair u RECONDITIONING OF PIPE –Pipelines that cannot be removed from service »Repair with replacement of an equivalent section. »Repair cracks in welds by grinding and rewelding. »Repair small corroded areas by weld metal overlay. »Repair small pitted areas with a welded patch. »Repair large corroded area with a full encirclement welded split sleeve. »Repair all gouges or grooves deeper than 10% wall thickness. Use a full encirclement welded sleeve.

ABC Chemical Complex13 Pipeline Repair »Repair dents deeper than 1/4 on pipe to NPS 12 or more than 2% greater than NPS 12. »Repair dents that affect the curvature of the pipe with removal of a cylindrical section containing the defect and replacement with an equivalent section. »Repair dents not meeting the above restrictions by filling the dent with a hardenable material and installing a full encirclement welded split sleeve.

ABC Chemical Complex14 Pipeline Repair –Initial Inspection »Determine soundness of the pipe adjacent to the defect prior to work »Inspect external surface of the pipe by one of the following methods: u Inspect exterior of pipe visually aided by a pit gage. u Use magnetic particle inspection if cracking is suspected. u Determine pipe wall thickness with ultrasonic testing. u Use radiographic inspection as required for definition.

ABC Chemical Complex15 Pipeline Repair –Welding »Check for hardness on hydrogen lines and maintain a hardness equal to or less than BHN 235. »Welding Procedures u Perform all weld repairs by Company employees using Company Welding Procedure Specification (WPS) 1.2. u Perform all weld repairs by Contract employees using Company-approved welding procedures provided by the Contractor.

ABC Chemical Complex16 Pipeline Repair »Welder Qualifications u Use Company welding procedure for qualification of Company employees to make weld repairs. u Use Contractor welding procedure (Company approved) for qualification of Contract employees to make repairs. »Burn through control u Burn through during welding is not expected when welding parameters do not exceed 20 volts and 100 amperes, if the remaining wall thickness is greater than inches (See ASME/ANSI B31.8, paragraph f). Welding performed outside these limits must be approved by the Plant Engineer.

ABC Chemical Complex17 Pipeline Repair –Coating Repair »Repair pipe coating damaged during pipeline repair activities in accordance with the original coating manufacturers recommendations. »Hydrotest pipe replacement sections to 1.5 times MAOP prior to installation. Hold for one hour. »Test all field welds with 100% NDE coverage using the best method for the weld configuration. »Grade and repair weld defects in accordance with API 1104 and API 1107 requirements.

ABC Chemical Complex18 Pipeline Repair –Documentation »Include the location of the leak, location class, grade of the leak, and action taken when writing leak reports. »Add repair reports to the original equipment file, the inspection file, and the DOT coordinators file. »The DOT Coordinator shall determine if the leak is classified as an incident that requires reporting to the regulatory authorities.