FIDIC Workshop WS 12, Beijing Conference

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

MAINTENANCE MANAGEMENT Module 9
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
VISION & MISSION OF KeNHA VISION : Quality, safe and adequate National Road Network. MISSION : Provide quality National Road Network for sustainable social.
Contracts – important issues
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Cash Flow Sewon Kim Kevin Tran Mary. Index Introduction Clients cash flow Contractors cash flow Cash flow forecasting Improving cash flow Example References.
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Auditing, Assurance and Governance in Local Government
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Time for a new standard - AS General Conditions of Contract
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Future Defence Aviation Safety Regulation Module 3 EMAR Part M – Continuing Airworthiness Requirements May 2015.
Quality Assurance/Quality Control Policy
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
ZHRC/HTI Financial Management Training
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
OH&S Management System
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Occupational Health and Safety
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
International Federation of Consulting Engineers
Copenhagen, 5th March 2009 dansk byggeri - Export Section1 By Frank Kehlenbach Director of EIC.
SPED Certification Program September 17, 2003 Houston, TX.
Health and Safety Policy
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Prime Responsibility for Radiation Safety
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Hazards Identification and Risk Assessment
CONSTRUCTION CONTRACTS DOCUEMENTS
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Chapter 21 Internal, Operational, and Compliance Auditing McGraw-Hill/IrwinCopyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.
Energy for the Future Belene Nuclear Power Plant Project Status.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
WSSB Capacity Enhancement Workshops The Uganda Performance Contract & Purpose 2. Performance Key Elements 3. Water Board’s Rights & Obligations.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Distance Learning and Accreditation Heather G. Hartman, Ph.D. Brenau University Online Studies and SACS Liaison.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
OHSAS Occupational health and safety management system.
CDM Construction Design and Management
May 5, 2016 May 5, Reporting obligations for  Investment banks,  Stockbrokers and dealers  FM and Investment advisers 2. Publication financial.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
OH&S Management System
Introduction to FIDIC - Manuals
Health and Safety Policy
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Structural Funds Financial Management and Control, Romania
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Financial Management
Contract & Standard Forms
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
OH&S Management System
Particular Conditions of Contract & Appendix to Tender
What is the UL QFCP? FCIA Webinar Presenters:
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
THE EMPLOYER Right, of access to the site.
Quality Assurance for Emulsified Asphalt Surface Treatments
Construction Contract Administration
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

FIDIC Workshop WS 12, Beijing Conference Design – Build – Operate a new Contract Wednesday, 7th September 2005 Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger, EC Member NEK Ingenieure, Berlin, Germany

FIDIC DBO ( Definition ) The Design – Build – Operate approach combines design, construction, long term plant / facility operation and maintenance into a single contract, with one legal entity, known as the Contractor.

FIDIC DBO Format “green field” scenario : a sequence of Design – Build – Operate “brown field” scenario : a sequence of Operate – Design - Build

CONDITIONS OF CONTRACT published 1999

FIDIC DBO Motivation Time Schedule Advantages Financial Compliance Single Point of Responsibility Allocation of Project Risk Fitness for Purpose ACEC / FIDIC CC

Design – Build – Operate Organisation

DBO FLOW CHART(Typical Sequence of Principle Events)

DBO FLOW CHART ( TIMELINE PART 1 )

DBO FLOW CHART ( TIMELINE PART 2 )

FIDIC DBO Independent Auditor Appointment of an Independent Auditor is a common practice globally for compliance with Quality Assurance procedures . ( Performance Criteria ) It is required to assess the Contractor’s Performance in carrying out the Contract, and also to examine the Employer’s Management and Monitoring of the Contractor. Defects in the performance of both the Contractor and the Employer will be identified and addressed.

FIDIC DBO “Asset Replacement Fund” In order to ensure that the condition of the Plant in the Works is properly maintained, replacement of major items of Plant will be required over the Contract Period. Therefore capital sums will be need to be expended throughout the Operation and Maintenance Period. This money will be held as an “Asset Replacement Fund”.

FIDIC DBO “Asset Replacement Fund” Monies provided under the DBO Contract on the schedule presented by the Contractor, specifying the major items of Plant to be replaced and timing and cost of such replacement. The following cost are excluded : Routine maintenance items Correction of defects Replacement of Plant and Material which have a life expectancy of less than (5) to 7 years Providing spares between scheduled dates for major plant replacement Replacement of Plant and Materials not identified in the schedule of major plant items

FIDIC DBO “Maintenance Reserve Fund” The “Maintenance Reserve Fund” is required to provide an incentive to the Contractor to ensure that the Works are in proper condition at the end of the Operation and Maintenance Period. Definition: A retention of 5 % from payments due to the Contractor in the last five years of the Operation and Maintenance Period, up to a contracted ( capped ) amount, to be released after issuing the Contract Completion Certificate.

FIDIC DBO “Facility Management Plan” The Facility Management Plan means the operation and maintenance methodology submitted by the Contractor with his Tender and the requirements are as detailed in the Employer’s Requirements.

FIDIC DBO “Variation / Change Management” Typically, it is anticipated that the following must be provided for i.e. : Changing load Major industry ( arrival / departure ) Technical obsolescence Increased performance standards Interaction with networks managed by others Changes legislation Contractor goes into liquidation Failure to meet performance standards

DBO FLOW CHART ( TIMELINE PART 2 )

FIDIC DBO Joint Inspection The Employer’s Representative and the Contractor shall carry out Joint Inspection on the condition of the Works identifying maintenance works, replacements and other works.

FIDIC DBO Final Inspection The Contractor shall notify the Employer that the Works are complete and ready for Final Inspection. After issuing the Contract Completion Certificate when passing the Final Inspection satisfactory the Employer shall be responsible for the care, safety, operation, servicing and maintenance of the works.

FIDIC DBO Risks One of the advantages of the DBO approach is the value for money achieved through effective risk allocation. The Employer’s and Contractor’s risks have to be clearly defined.

DBO FLOW CHART(Typical Sequence of Principle Events)

FIDIC DBO CC Questions: Word and Content “Facility Management Plan” to assist and advise on the management and monitoring of the operation and maintenance of the facilities provided “Asset Replacement Fund” to ensure proper condition of Plant in the Works over the O & M Period “Maintenance Reserve Fund” to provide an incentive to ensure that the Works are in proper condition at the end of O & M Period Independent Auditor issues on compliance process in relation to the operation and performance criteria 5. Which colour for the DBO Conditions of Contract – golden ?