Job Performance Requirement 10-9

Slides:



Advertisements
Similar presentations
Lunch Table Set-up Roll the table into position Be sure you have clearance on both sides.
Advertisements

Fire Hose and Appliances
Wildland Progressive Hose Packs The Original made NEW !
The Cleveland Load.
TFT Blitzfire.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Ropes and Knots Skill Drills.
You need a square piece of paper. Fold the paper in half then unfold. Fold the paper along the diagonal then unfold.Repeat with the second diagonal.
Getting Wet Stuff to the Red Stuff For 300 Years
Fire Hose and Appliances
Blackwood Fire Company TL84 LDH Deployment/Restoration Training Module.
Pulling working lines. Step up onto the tailboard. Step up onto the tailboard.
1 14” 52” Garment 14” 21” 10” Fabric Arm Restraint Garment for 6-12 Month Olds You’ll need: Two pieces of lightweight knit overlock fabric (stretches one.
Job Performance Requirement 18-2 Louver in Lieu. JPR 18-2A A Detailed drawing identifying cutting terms used in louver-in-lieu operation.
HOW TO MAKE A KITE? BY : ADITYA SANJU SAGARJIT ARCHAN.
By Charlie Cimperman. Things you will need: Step 1: Fold the paper in half long ways.
TFT Blitzfire.
Following directions. Design your paper on ONE side.
Job Performance Requirement Tying a Figure Eight on a Bight.
Fire Hose, Nozzles, Streams, and Foam
Job Performance Requirement Modified Gasner Bar Pack.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
Ropes and Knots Skill Drills.
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
Job Performance Requirement Removing Tempered Glass.
Job Performance Requirement Tying a Rescue Knot.
Bumper Line of Engine/tanker ’ Pre-connect of 1-3/4”. 50’ flat racked with flaps and 50’ rolled. The nozzle is attached to the rolled section.
Job Performance Requirement Horseshoe Load.
The Westampton Rolls How to Pack and Pull the Westampton Rolls Hose Load.
Use of Modeling. Origami House Start off with an origami paper color side down.
How to Make Bows Modified by the Georgia Agriculture Education Curriculum Office September 2005.
Making a Bow. Probably the most difficult skill that a beginning florist or other plant retailer must learn is that of bow making. The process looks simple,
Making a Bow Georgia Agricultural Education Curriculum Office
Ropes and Knots (Fire Fighter I)
Job Performance Requirement 17-2
Job Performance Requirement 7-11
Derigging a CL16.
Fold Your Own Bank Activity
Job Performance Requirement 10-16
Harwich Fire Department
Job Performance Requirement 15-10
Job Performance Requirement 10-11
Job Performance Requirement 20-2
Job Performance Requirement 10-19
High-rise Pack Loading
Fire Hose, Nozzles, Streams, and Foam
9 Ropes and Knots.
Job Performance Requirement 15-11
Job Performance Requirement 20-3
Wildland Progressive Hose Packs
Job Performance Requirement 16-10
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Job Performance Requirement 15-13
Job Performance Requirement 10-15
Job Performance Requirement 10-31
Job Performance Requirement 15-21
Job Performance Requirement 15-9
Loading the SAC-METRO pack
Job Performance Requirement 10-14
Job Performance Requirement 16-3
Supplies needed 1 flat nose plyers 1 round nose plyers 1 cutters
Job Performance Requirement 15-4
Job Performance Requirement 10-27
Job Performance Requirement 15-8
Job Performance Requirement 10-33
PRODUCTION Understand Long Run V. Short Run
Job Performance Requirement 15-3
Job Performance Requirement 10-32
Job Performance Requirement 2-1
basic scout knots 2019 Chief Seattle PTC October 19, 2019
Presentation transcript:

Job Performance Requirement 10-9 Twin-Donut Hose Roll

A First the hose is laid flat with both couplings at one end and each half lying parallel to the other.

B At the center, the loop is folded over the top of both halves. JPR 10-9B

C The roll is started toward the couplings at the same time. JPR 10-9C

D At the end, the roll may be tied together for carrying. JPR 10-9D

E The twin donut can be secured by using the hose itself E The twin donut can be secured by using the hose itself. This is called a self-locking roll. To accomplish this, extend the amount of hose that is used for the starting fold and loop. Allow this excessive hose to “flop” as the twin donuts are rolled. When finished, use the extra hose at the center to form a bight around the two end couplings. (Photo courtesy Loveland Fire and Rescue) JPR 10-9E