Project Management Issues John N. Galayda, SLAC April 24, 2002

Slides:



Advertisements
Similar presentations
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Advertisements

Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
Mark Reichanadter LCLS FAC Oct12-13, 2004 Meeting of the LCLS Facilities Advisory Committee LCLS Organization & Execution.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Jim Fast Pacific Northwest National Laboratory
Jefferson Lab Overview
LUSI Coordination with LCLS
Experimental Facilities Planning
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Injector Performance Requirements Conventional Facilities Update
CF Organization & Schedule
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
WBS 5.0 LCLS Strategic Projects Division
LINAC OPS Budget Review
John N. Galayda – Director of LCLS Construction March 30, 2009
LCLS History and Science Overview Keith Hodgson, SSRL Director April 23, 2002 LCLS DOE Review, April 23, 2002 Keith Hodgson, SSRL.
Electron Beam Systems ETC and Methodology
John N. Galayda – Director, LCLS Construction May 13, 2009
CONVENTIONAL FACILITIES LCLS Office Space
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Overview John N. Galayda, SLAC April 23, 2002
DOE Mini-Review of the LCLS Project
X-Ray Transport, Optics, and Diagnostics WBS Alan J
LCLS Project Management
X-Ray Endstations Update
Conventional Facilities (WBS 1
Details supporting the increase
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Conventional Facilities WBS 1.9
Endstation Systems, Installation Costs and Schedule J. Hastings
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Injector System Overview D. H
DOE Review 7-9 February, 2006 Steve Lewis
Control System Overview Hamid Shoaee LCLS Control System Manager
Linac Coherent Light Source Project Update
Linac Coherent Light Source Transition to Operations 11 July 2007
Department Of Energy Review Linac Coherent Light Source Project
LCLS Startup, Commissioning & Future Scenarios
Conventional Facilities
Phase 1 Statement of Work Preconstruction “Plan The Work”
X-Ray Endstation Design & Management/Commissioning
Electron Beam Systems ETC and Methodology
LCLS Lehman Review February 7-9, 2005
CF Scope, Management & Organization
X-Ray Endstation Systems (XES) 2006 Schedule
1.9 Conventional Facilities
DOE Status Meeting of the LCLS Project
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
Presentation transcript:

Project Management Issues John N. Galayda, SLAC April 24, 2002 Risk Assessment/Front-end planning Laboratory Oversight Acquisition Plan - Major Acquisitions LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment - Technical Accelerator Slice emittance at undulator is a key measure of technical risk Project goal 1.2 mm-mrad normalized emittance at the undulator entrance Saturation at 8 keV achieved for 1.5 mm-mrad, with 122 meter undulator channel Ample Safety factor for saturation at 0.8 keV FEL Physics Experimental verification is now solid LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment - Technical Undulator quality Mitigation of risk – design and test prototype Prototype meets specification Refinement of design underway Damage to Optics Mitigation of risk – gas absorption cell Mitigation of risk – construct Far Hall SAC recommendation LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment - Schedule Critical path for injector commissioning Consequence of delay: Risk in delay of injector commissioning milestone is minimal Risk associated with beam quality during FEL commissioning FEL-quality beam required one year after commissioning milestone Mitigation of Risk: PED funds for laser prototype verification in FY2004 LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment - Schedule Critical path for undulator procurement Consequence of Delay: Late completion of undulator deliveries Start of FEL commissioning without all undulators in place Commissioning goals can be met with 50% delivery of undulators Mitigation of Risk: Expedite start of procurement Two vendors – brings technical risk of compromised undulator quality LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment - Schedule Delay in Beneficial Occupancy of Hall B Consequence of Delay: Delay in completion of installation of far hall equipment FEL commissioning may proceed in Near Hall Mitigation of Risk: Early Construction start, or Obtain beneficial occupancy to lower level for installation of beamlines LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment: Schedule Experiment Optics and Infrastructure Risk to commissioning goals No risk to FEL commissioning Risk to Life Cycle Utilization Rapid exploitation of the LCLS, post-project Development must take place outside the scope of the Project Mitigation of Risk Include detector development in scope of project LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Risk Assessment - Cost Accelerator X-ray Optics ($2M) Conventional accelerator technology Superconducting wiggler is well within state-of-the-art X-ray Optics ($2M) The point is to mitigate risks for prospective experimenters LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Acquisition Plan Early placement of undulator orders Avoid potential for nonuniformity associated with two vendors Conventional Facilities Construction Several procurement options considered Detectors and Mirrors – Collaboration with Cornell, ESRF LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

LCLS Project Engineering Design Organization LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Lab Oversight Memorandum of Understanding Defines project responsibilities for partner labs Creates Inter-Laboratory Coordinating Council Committee members accountable to partner laboratory directors Functionality proven in PEP-II construction LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Acquisition Plan Undulators - $17M Stringent technical requirements Schedule is important Advance procurement plan Building construction Design-bid-build Design+build Specialized optical components Research partnership ESRF Array Detector Research partnership with Cornell LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Support Matrix at Each Laboratory SLAC Technical Division Resources LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Undulator Electron Beam Diagnostics Undulator Controls Undulator Electron Beam Diagnostics Undulators and X-ray Diagnostics LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

LCLS will become a LLNL Program LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

1.1 LCLS Project Management and Control 1.1 Project Planning, Management and Administration 1.1.1 ES&H 1.1.1.1 ES&H PED Phase 1.1.1.2 ES&H Construction Phase 1.1.2 Construction Project Management 1.1.2.1 PED Phase 1.1.2.2 Construction Phase LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

1.1 Cost Estimate (FY02 Dollars, Thousands) Name PED Construction Contingency Total % contingency 1.1.1 Proj. Planning $ 4,363 $ 7,819 $ 189 $ 12,372 2% ES&H $ 682 $ 1,226 $ 38 $ 1,946 1.1.2 Project Mgmt $ 3,681 $ 6,594 $ 151 $ 10,426 Staffing FY2003-2004 FY2005-2007 Project Director Project Director Chief Engineer Chief Engineer Rad. Physics (1.75FTE) Rad Physics ES&H (1.5 MY) ES&H QA (1.5 MY) QA Admin (3 MY) 2 x Admin PMCS (8 MY) PMCS (15MY) LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC

Startup FY2006, Laser/Injector/Linac startup $ 3.52M M&S $1.56M Effort $1.96M FY2007 Linac/FEL startup $ 5.38M M&S $1.95M Effort $3.43M FY2007 Photon Systems startup $ 2.34M M&S $ 0.41M Effort $1.92M Total $11.24M LCLS DOE Review, April 24, 2002 John N. Galayda, SLAC