How can we make the longest walking /cycling tunnel in Europe

Slides:



Advertisements
Similar presentations
Karl and Taavet.  This map portrays the steam trains and narrow guage railways in Wales.
Advertisements

The Local Authority Response to the E4G M&E challenge with reference to Valleys Regional Park Eleri Davies Rheolwr Prosiect Treftadaeth Heritage Project.
Nottingham Sustainable Travel and Transport. Although Nottingham has lower than average levels of car ownership, levels of traffic are continuing.
Mainstreaming Cycling for All Nick Vaughan Transport for Greater Manchester Eleanor Roaf Sustrans Local Sustainable Transport Fund National Conference.
Ultra at Heathrow & beyond BASE April 2013 Presentation by Adam Ruddle, Key Account Manager, Ultra Global PRT.
The Local Authority Response to the E4G M&E challenge with reference to Valleys Regional Park Gayle Wootton Environment Projects Manager Valleys Regional.
Smarter Choices Smarter Places EAST END ACCESSIBILITY Adam Bows Team Leader Sustainable Transport LES.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Change Over Time. Benidorm In the 1950's Benidorm was a small, attractive fishing village bordered by fine sandy beaches. Few people visited it despite.
Culture, Leisure and Sport Cllr Peter Clarke Pennine Lancashire Culture, Leisure and Sport Group.
Stockport Key Centre Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 947 – GMATS Stockport Key Centre report Whereas.
Fire Cover Review (FCR) Blaenau Gwent Briefing for Scrutiny Committee.
Cork City  Corks transport management has developed dramatically over recent decades  It suffers from severe traffic congestion because of the number.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
 Cardiff is the largest city and a capital of Wales.  The city is a tourism centre and the most popular visitor destination in Wales.  Cardiff has.
Cycling Scotland Presentation
Challenges for welfare to work in Wales Dave Simmonds.
Encouraging Cycling in London – A Lambeth perspective Dawn Rahman: Transport Policy Manager.
Physical Activity in North Yorkshire and the Tour de France Legacy 09/05/20141 Lincoln Sargeant Director of Public Health.
Types of Transport in Britain. Roads and motorways are Britain's primary domestic transport routes. There are some 225,000 miles (362,000 km) of roads.
Urban Land Uses 6 Land Classifications. 1.0 Residential Land Uses includes all the places where people live often takes up to 40% or more of the developed.
Neil Hoskins LSTF Programme Manager.
Use Survey to Improve the DFX Transit Model
West of England Joint Transport Study
John Bann Cycling and Roadspace Transformation Manager
What’s the Combined Authority all about
Partnership Working in Nottingham The Greater Nottingham Transport Partnership and the role of the Cycling Development Group.
In it for good The Bristol Method Peter Mann Transport Director Bristol City Council, UK
Improving the Cardiff and Valley Railway
Running a bath Depth (cm)
Raising the Bar for Integration with Public Transport
What the Big Blue can do for you!.
The changing location of football stadiums
Delivering transport and growth
Walking & Cycling Strategy to Implementation
CAPE WINELANDS ELGIN.
Waltham Forest Mini Holland
Cycling in Edinburgh – 2016 Current position and potential
*NEW EXHIBITION FOR 2018* Neepsend Model Railway Society
Sustainable Development of Waterways in Wales
Commuter Routes in Ireland especially benefit from Wi-Fi
The EU Referendum Thought for the Week.
Simon Warburton Interim Strategy Director, TfGM.
The Regeneration of Swanley
Call Now How to Search a Good Taxi Service in Udaipur.
JOURNEY TIME MODELLING
World Meeting of Families
Walking & Cycling Strategy to Implementation
Cycle Hubs Cycle hubs is a pilot scheme aiming to encourage cycling in Havering, especially among groups that do not cycle often, including women, people.
Better mobility for older people
North Fife Cycling Key Points
ECOMM 2014 Mobility management as a tool for facilitating cycling in the sector of home care (cleaning services and family care) TRAJECT Katrien Backx.
Walking and Cycling Strategy Implementation
AP Day 75.
GO E-bike South East Scotland regional e-bike share
TRAVELLING.
Food Security in Different Phases
Why build this new link to Heathrow?
STRATEGIC OPPORTUNITY AREAS
Food Security in Different Phases
HE Designated Funds Cycling Safety and integration (CSI)
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Innovation in Railways NTA Ireland
Members’ Workshop Wednesday 17th April 2019 Woodhill House Aberdeen
Travel & Transportation
The Cancer Research UK London Winter Run will be holding its 5 th annual event. It promises to be even more exciting than the previous ones, offering.
Delivering the North East Chelmsford Growth Ambition
Future Visions: overview of GCP plans and proposals
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Western Rail Link to Heathrow
Presentation transcript:

How can we make the longest walking /cycling tunnel in Europe benefit the wider communities of Wales? 1

the greater the deprivation. Overall Deprivation 2014 The darker the blue, the greater the deprivation. 2

The tunnel is in the middle of an area of high multiple deprivation Overall Deprivation in South Wales The tunnel is in the middle of an area of high multiple deprivation 3

The lighter the blue, the better the physical environment 4

National Cycle Network in Southern Britain Where are the most traffic-free (green) Routes? 5

Abandoned Tunnels in South Wales Abandoned Railway Tunnels Merthyr Merthyr Rhondda Cwmbran Swansea Caerau Port Talbot Pontypridd Newport Bridgend Cardiff Abandoned Tunnels in South Wales Abandoned Railway Tunnels 6

National Cycle Routes in South Wales Circular Routes? Merthyr Cwmbran Swansea Port Talbot Pontypridd Newport Bridgend Cardiff Off-Road Quiet Road Proposed National Cycle Routes in South Wales Circular Routes? 7 Many possibilities centred on Bridgend

Bridgend can become a centre for cycle tourism: Currently it has the nearest hotel to the Rhondda Tunnel. The proposed National Cycle Networks need to be developed, especially NCN 885 down the Llynfi Valley from Maesteg to Bridgend Active Travel Funding should be available for many of the developments. 8

A management company will be able to promote special attractions Tunnel Events - Runs are likely to attract over 1000 runners, based on experience at Bath. 9

46km Railway Path with one tunnel Dublin Waterford Rosslare Dungarvan Waterford Greenway 46km Railway Path with one tunnel 10

11

One-Way Cycle Hire Shuttle to return bikes… & riders to the start point 12

Why not hire a bike in Treherbert, ride to Port Talbot via Aberavon Beach then return by shuttle bus? Port Talbot “Little Switzerland in Wales” - Richard Burton 13

Caerau Tunnel? 14 Treorchy Cycle Shuttle Bus Port Talbot Or: Come by car or train to Sarn or Bridgend; Shuttle Bus to Treorchy with bikes; Cycle through tunnel to return. Sarn Caerau Tunnel? Bridgend 14

Or cycle one-way & train the other way? Merthyr Cwmbran Swansea Port Talbot Pontypridd Newport Bridgend Cardiff Railways Or cycle one-way & train the other way? 15

Set up a network of bike hire docking stations at train Stations Merthyr Cwmbran Swansea Port Talbot Pontypridd Newport Bridgend Cardiff Railways Set up a network of bike hire docking stations at train Stations 16

How can we make the longest walking /cycling tunnel in Europe benefit the wider communities of Wales? The tunnels will become the centre-pieces of the South Wales Cycle Network: Currently a big resource with unfulfilled potential Develop circular routes based on the tunnels Commercial management will enable the Rhondda Tunnel to promote major sporting events and visitor attractions One-way bike hire with shuttle bus return, particularly in the & Llynfi Afan Valleys Or use the rail network for the return journey Improve Sunday rail services Set up a network of bike docking stations, as in Cardiff, at Valley Line railway stations 17

Our Vision 18