Underground Cable – Replacement & Rejuvenation Presented by John Gilkey May 7, 2009.

Slides:



Advertisements
Similar presentations
An Introduction to On-line Partial Discharge Surveys
Advertisements

IAQ, FILTRATION AND THE CONSUMER MARKET Matthew Klein, PE-ME, MBA Indoor Air Quality Solutions, Inc.
APS Underground Distribution Cable Replacement Project
BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment.
Computer Network Topologies
Nilesh Agre Wedashree Jalukar Neelima Shahi Group Members.
Network Management Basics Network management requirements OSI Management Functional Areas –Network monitoring: performance, fault, accounting –Network.
CERTIFICATON EN Wireless Fire Detection.
TRENCHING AND EXCAVATIONS
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Engineering Services Department of Public Utilities.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Software Testing and Quality Assurance: Introduction and Terminology
1 The Utility Breaker Tim Heard DDC Engineer AEP Texas SWEDE 2006.
URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.
Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.
The TIMING System … …as used in the PS accelerators.
Pipe Freeze Protection. 2 XL-Trace Systems Pipe Freeze Protection and Flow Maintenance.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering.
Chapter 3 Memory Management: Virtual Memory
The Three Important Topologies By: Parimal Satashia.
Module 6: Designing Active Directory Security in Windows Server 2008.
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
POWER SYSTEM PROTECTION
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
1 Maintain System Integrity Maintain Equipment and Consumables ICAS2017B_ICAU2007B Using Computer Operating system ICAU2231B Caring for Technology Backup.
Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)
Cable Rehabilitation at Oncor by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning SWEDE 2009 – Tulsa, OK – Thursday,
BOARD POLICY H-26 NON-CAPITALIZED ASSET MANAGEMENT.
How many wires can safety be installed in a junction box
1 Network Topology 2 Introduction 8Physical and Logical Topologies 8Topologies 8Bus 8Ring 8Star 8Extended Star 8Mesh 8Hybrid.
Three types of network cabling Star Topology Tree Topology Linear Bus.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19th – 20th April 2012.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
JOHN DOE PERIOD 8. AT LEAST 80% OF HUMANITY LIVES ON LESS THAN $10 A DAY.
Computer Information Science (TIK201) Class Rules & Regulations.
Outside Plant Fiber Optics
1 Electricity. This material was produced under grant number SH F-54 from the Occupational Safety and Health Administration, U.S. Department.
Maintenance Management
Batteries as Integral Part of Equipment
Corrugated Metal Pipe (CMP)
Introduction Data Communication Networks Protocols and Standards
HOW BEST CAN WE MANAGE MEDICAL EQUIPMENT By Khalif D.Mohamud BMET-GCRH
Network Configurations
PD Testing Some Perspectives from Users
Introduction Data Communication Networks Protocols and Standards
Private Septic Systems
Reliability Valuation in AEP Texas
Evaluating Non-Leak Threats
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
Private Septic Systems
Fiber Optic Network Audit
Pietro Manni, P.Eng. PQ Logic Corporation
Customer Minutes Lost CBM ON MV POWER CABLE SYSTEMS AND THE USE OF CABLE DIAGNOSTICS: ? YES or NO ? Switchgear 4 % Transformers 2% Secondary.
Click anywhere to get started…
ST800 Service Tester, 800 Amps.
Difference between Earthing & Grounding
CPS Energy URD Primary Cable and Splices
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
10. If Two items are selected simultaneously a second time… Terminate the session, replace all items and begin a new presentation session If the client.
Presentation transcript:

Underground Cable – Replacement & Rejuvenation Presented by John Gilkey May 7, 2009

Introduction John – who???????

PSO Policy for Replacement PSOs Underground Cable Replacement guideline is to remove from service those direct buried cables that exhibit unacceptable performance.PSOs Underground Cable Replacement guideline is to remove from service those direct buried cables that exhibit unacceptable performance. Unacceptable performance is based on the number and frequency of cable failures, and takes into account the underground system configuration.Unacceptable performance is based on the number and frequency of cable failures, and takes into account the underground system configuration.

Causes for Failure Lightning Soil Conditions – Sand Dig-ins / other utilities Previous installations of splices

Repair/Replacement Guidelines Replace if neutral bad – Replace if neutral bad – Replace after 3 splices Replace after 3 splices Replace all riser/dip runs Replace all riser/dip runs Replace if fault is in a difficult location Replace if fault is in a difficult location Always replace secondary non jacketed concentric neutrals Always replace secondary non jacketed concentric neutrals

AEP Corporate Recommendations for Injection – Short Term Goals Identify the oldest, most problematic sections of URD cable. Identify the oldest, most problematic sections of URD cable. Replace these, including splices, terminations and accessories using the least invasive method(s). Replace these, including splices, terminations and accessories using the least invasive method(s). Inject only in those cases where the cable is judged to be of modern type & relatively splice-free, but extremely difficult or extremely costly to replace. Inject only in those cases where the cable is judged to be of modern type & relatively splice-free, but extremely difficult or extremely costly to replace.

AEP Corporate Recommendations for Injection - Long Term Goals Develop a comprehensive database to track cables (and other equipment) from installation to retirement. Develop a comprehensive database to track cables (and other equipment) from installation to retirement. Accelerate efforts to develop a comprehensive cable testing and condition assessment program. Accelerate efforts to develop a comprehensive cable testing and condition assessment program. Develop criteria for economic analysis of cable testing vs. replacement vs. injection to determine long term values of programs. Develop criteria for economic analysis of cable testing vs. replacement vs. injection to determine long term values of programs.

PSO / AEP Ohio Experience PSO PSO Utilix / CableCure Utilix / CableCure Notable success Notable success Other AEP Other AEP Utilix / CableCure Utilix / CableCure AEP Ohio AEP Ohio Utilix / CableCure – Novinium Utilix / CableCure – Novinium

Discussion & Questions Underground Cable – Replacement & Rejuvenation