January 2010 doc.: IEEE 802.15-<10-0082-00> January 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on 802.11 WNG for 2010-01] Date Submitted: [21 January, 2010] Source: [Clint Chaplin, 802.11 Liaison] Company [Samsung Electronics] Address [] Voice:[], FAX: [], E-Mail:[] Abstract: [Liaison Report on 802.11 WNG for January, 2010.] Purpose: [Informative.] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Clint Chaplin, 802.11 Liaison (Samsung) Clint Chaplin, 802.11 Liaison (Samsung)
Liaison Report on 802.11 for 2010-01 January 2010 Clint Chaplin, 802.11 Liaison (Samsung)
802.11 Status Went out to first Sponsor ballot: 802.11p which passed January 2010 doc.: IEEE 802.15-<10-0082-00> January 2010 802.11 Status Went out to first Sponsor ballot: 802.11p which passed Went out to recirculation WG ballot: 802.11mb, 802.11s Going out for recirculation Sponsor ballot: 802.11p, 802.11u, 802.11v, 802.11z Asking to form Task Groups: None Asking to form study groups: None Clint Chaplin, 802.11 Liaison (Samsung) Clint Chaplin, 802.11 Liaison (Samsung)
802.11 TGad Very High Throughput 60GHz January 2010 doc.: IEEE 802.15-<10-0082-00> January 2010 802.11 TGad Very High Throughput 60GHz Reviewed Notifications of Intent for proposals 38 new techniques proposals (30 min each) 12 to be presented in March 26 to be presented in May 4 complete proposals to be presented in May (60 min each) Selection Procedure adopted 09/0935r5 as the first draft of TGad selection procedure Evaluation Methodology development adopted 09/0296r16 as the first draft of TGad evaluation methodology document Channel modeling development adopted 09/0334r6 as the first draft of TGad channel model Estimated to have draft ready for first WG ballot in December 2010 (PAR deadline) Clint Chaplin, 802.11 Liaison (Samsung) 4 Clint Chaplin, 802.11 Liaison (Samsung)
802.11 WNG Wireless Next Generations SC January 2010 doc.: IEEE 802.15-<10-0082-00> January 2010 802.11 WNG Wireless Next Generations SC Three presentations at this meeting Adding 900 MHz ISM band into 802.11 (11-09-1313-05-0wng-900-mhz-ism-band.ppt and 11-10-0001-04-0wng-900mhz-par-and-5c.doc) – Dave Halasz Motion to take PAR and 5 Criteria to full 802.11 WG Result: Yes - 15; No - 5; Abstain – 14: passed Motion in full 802.11 WG on Wednesday: Yes – 36; no – 18; Abstain – 32: fails IEEE 802.11 for High Speed Mobility (11-09-1000-04-0wng-ieee802-11-for-high-speed-mobility.ppt) - Hiroshi Mano An Example Protocol for FastAKM (11-10-0059-00-0wng) - Hiroki Nakano Does WNG think that we need tutorial session exploring the need for support for mobile communication? Result: Yes - 18; No - 1; Abstain - 7. Clint Chaplin, 802.11 Liaison (Samsung) 5 Clint Chaplin, 802.11 Liaison (Samsung)