Possible parasitic measurement during Fall GMp run

Slides:



Advertisements
Similar presentations
Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.
Advertisements

Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
The calibration and alignment of the LHCb RICH system Antonis Papanestis STFC - RAL for the LHCb Collaboration.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Deeply Virtual Compton Scattering on the neutron Malek MAZOUZ LPSC Grenoble EINN 2005September 23 rd 2005.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
SoLID review DAQ recommendations Alexandre Camsonne.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Forward Tagger Calorimeter Prototype tests at Jlab: report CLAS12 Workshop February 22, 2012 A. Celentano.
LHCf: Integration and compatibility with the luminosity monitor
Jean-Sebastien Graulich, Geneva
Counting Mode DAQ for Compton
CERN meeting report, and more … D. Breton
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
Preparation for CERN test beam
Hall A Compton Electron detector overview
M. Jones B. Wojtsekhowski
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
Conceptual design of TOF and beam test results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
during Fall GMp run (high current)
Example of DAQ Trigger issues for the SoLID experiment
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Special Considerations for SIDIS
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
Alexandre Camsonne January 13th 2015
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
August 19th 2013 Alexandre Camsonne
TOF read-out for high resolution timing
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

Possible parasitic measurement during Fall GMp run February 24th 2016 Alexandre Camsonne

DVCS setup Stand has range from 10 to 16 degrees Z position from 1.5 m to 5.5 m Carrier about 2 m x 1m 208 channels of RG 213 signal going in HRS 208 HV channels DVCS electronics in spectrometer 1 GHz waveform sampling 128 ns depth Calorimeter trigger

DVCS setup

DVCS arm

DVCS calorimeter box and carriage

GMp experiment Need high current up to 60 uA Two single arms DAQ Left HRS Right HRS : limite to about 42 degrees because of DVCS stand DVCS requested to run at under 25 uA when calorimeter is in place, can run high current when DVCS calorimeter is unstacked Most likely extended to Fall

GMp kinematics 0.7+2.4+3.3+8.5+10.5+26.7+21.2+39 =112.3 hours = 5 PAC days = 10 days

Dedicated GMp run When DVCS is done, unstack calorimeter Most likely stand stays in place to save installation time GMp uses Left HRS for small angle measurement Most like Right HRS at smallest angle and DVCS stand at smallest angle 10 degrees

Electron Calorimeter irration test 10 degrees, current up to 60 uA Can reuse DVCS cables 208 channels and stack lead glass, need PMTs support Could reuse DVCS box, but not heat curing C200 ready next fall ?

GEM tests One plane or more in front of calorimeter Large or small GEM in front of HRS on sieve hold MPD in VME64X crate in spectrometer Test CODA integration, rate capability, DAQ capability, position resolution in high background, radiation hardness

GRINCH prototype test PID for GEM and ECAL Test rate capability and VETROC

HCAL Can be place in place of ECAL Or could look for coincidence with ECAL or HRS Can install FADC crate in LHRS for trigger testing

DAQ options Use DVCS DAQ Use SBS DAQ Good to look at accidental and background rate Use SBS DAQ Good to test full scheme in realistic conditions More involved in terms of installation

Drawback Only small angle available 10 to 16 degrees limited by RHRS No magnet : background and irradiation will be significantly higher

Conclusion Opportunity to take data in high background environment Test detector capabilities Benchmark Montecarlo Could test several detector components Could need significant effort depending how involved in the setup