City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Standards Review Subcommittee Update April 30, 2013.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
Replacement of the Queens Approach Bronx-Whitestone Bridge
April 2, $1 Billion - $1.2 Billion The Pawlenty-Molnau Transportation Financing Package will improve Minnesotas transportation system by greatly.
PLAYGROUND SAFETY 1. 2 Why is playground safety so important? 76% of injuries to children occur on public playgrounds 44% of all injuries are caused by.
Federal Accountability/ AYP Update Texas Assessment Conference December 1-3, 2010 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.
2011 Planning Commission Annual Report Mayor & City Council Presentation April 10, 2012.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Health and Safety Executive Update on progress in implementing the recommendations of the Löfstedt report Anthony Lees Construction policy unit.
AD/AB - LCCA 2 nd Session Wednesday, January 29th.
West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Seattle Design Commission Update.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
September The Board of External Auditors recommended in their reports for 2009, 2010, and 2011 that the GS/OAS sell the Casa del Soldado and use.
Highway Maintenance and Preservation Needs
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
DISTRICT IMPROVEMENT PLAN Technology Domain Annual Progress Report Lakewood School District # 306.
BLACK MOUNTAIN TOWN SQUARE Building a Grander Front Porch.
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
Cathedral of the Immaculate Conception Project Information Session.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Instruments supporting effectiveness of the Cohesion Policy Karina Bedrunka Director of the Department for Coordination of Operational Programmes Gdańsk,
MOVIDA – MOVing from Inspection to Domestic Advice by service companies MOVIDA – MOVing from Inspection to Domestic Advice by service companies Matjaž.
ADBA PERMITTING WORKSHOP 27 March 2013 Stephen Barnes, Technical Director, Wardell Armstrong.
Mt. Greylock RSD Building Project Initial Community Report October 8, 2013 Rose Ellis, Superintendent 0.
Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.
LESNER BRIDGE REPLACEMENT PROJECT
Mount Vernon Yacht Club Long Range Projects. Projects under consideration Replace/repair bulkhead along parking lot Dredging Replace/Upgrade of C and.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
CTS* Project Regulation and Licensing Department Status July 20, 2012 Lori Hewig, IT Director and Project Manager * Construction Tracking System (formerly.
NPMA YANKEE CHAPTER PRESENTATION September 26, 2013.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Pasadena Water and Power Contract with R C Foster Corporation to Provide Seismic Upgrades to Sheldon Reservoirs 1 and 2 City Council March 12, 2012.
Belt Line Project Cost Update May 27, Belt Line – Project Overview Undergrounding of aerial utilities – electrical and telecom Two Phases – Marsh.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Highlights From the Survey on the Use of Funds Under Title II, Part A
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Market Data ASHRAE May, Keith Stippich. Global Energy Consumption Global Energy Consumption (+10.9% overall increase)
 Created by City Council in October Original purpose of the fund: To support housing opportunities for workforce families. $600,000 fund.  On.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
IMPROVING COAST WALK TRAIL Friends of Coast Walk Vision-Mission-Actions to Date.
1. 2 Briefing Purpose To provide an update of the existing condition of the Portsmouth Seawall and to indicate the status of future projects.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SUN CITY HILTON HEAD COMMUNITY ASSOCIATION, INC. PURRYSBURG POOL UPDATE.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
Library Remodel Update Abbot Chambers City Librarian 31 July, 2012.
Electronic Report of Injuries & Illness
2018 Adopted Budget February Financial Plan
Sitka Harbor Department
Kamran Marashi, P.E., S.E. Jim Schettler, P.E., S.E.
Presentation transcript:

City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014

History Percival Landing Update

Approach GOAL Protect public safety Maintain use by the public Plan for the future INSPECTION PROGRAM Initial assessment by structural engineers in 2004 Annual walk-through inspections Regular 5-year structural inspection – next scheduled for 2014 ANNUAL CFP Percival Landing Inspections funded through CAMMP Percival Landing Major Maintenance funded through CAMMP Percival Landing Replacement Projects

Percival Landing Update Summary of Actions 2004PND conducted a complete reconnaissance- level structural evaluation of Percival Landing 2005PND conducted an annual walkthrough evaluation. 2006PND conducted an annual walkthrough evaluation. Closed vehicular section at Olympia Ave., viewing pier and Motherhood stage area to public use. 2007PND conducted an annual walkthrough evaluation 2008 PND conducted an annual walkthrough evaluation. Findings were: cross bracing, column footings, various pilings, unsafe electrical, gangway traction slats and transition plates PND conducted an annual walkthrough evaluation. Findings were: continued deterioration, exposed wiring, gangway traction slats, decayed Bent 94, cross bracing along E-Float and bull-rails on all floats, recommend survey of roadway for settlement and installation of pea gravel. OPARD crews removed electrical service from E Float (November 2009 – March 2010) PND and Echelon completed a 5-year reconnaissance-level inspection and designed a project scope to address any remaining repair items. Project included: repair cross bracing, repair Bent 94 piles and all others that were in need of repair, repair of bull-rails on all floats, repair of Sylvester Street Float, new transition and skid plates and added floatation to all floats as needed. 2010(July 2010 – July 2011) Percival Landing Rehabilitation Project – Section A, Phase PND conducted an annual walkthrough evaluation. Was done during while rehabilitation project was underway so it included repairs that were underway and eventually completed. 2011PND conducted an annual walkthrough evaluation. Inspection was during Section A, Phase 1 work so Phase 1 area and E and F Floats were not evaluated. Report identified: various missing bolts and protruding nails, need Up-and-Out ladders, remove grass and moss from floats, add more non- skid to transition plates, repair various non-smooth transitions, recommend survey of roadway for settlement and installation of pea gravel PND conducted an annual walkthrough evaluation. F float recommended for closure, monitor 4 th street for settlement and installation of pea gravel, miscellaneous O&M items from cleaning to replacement of rotten boards. At the request of the City, the report also provided recommended replacement dates for original Percival Landing sections that were not reconstructed in Phase PND conducted an annual walkthrough evaluation. Recommendations: keep F Float closed, monitor 4 th Ave. bulkhead for settlement, miscellaneous O&M issues from cleaning to repairs of transitions to reduce tripping hazards. The report reiterated previous years recommended replacement schedule for remaining sections of the boardwalk. 2013Designed and bid F Float Replacement. Bids were beyond existing funding. City reconsidered float enhancements. 2014Reconsidering F Float replacement and contracting for a complete reconnaissance-level structural evaluation of Percival Landing in July

Percival Landing Update Previous Percival Landing Funding 2011 CFP Section A Phase 1 Construction - $150,000 Section A Phase 2 Design - $350,000 (Moved to cover additional contamination costs) Annual inspection - $8,000 (CAMMP) Percival Landing Maintenance Fund - $25,000 (CAMMP) 2012 CFP Annual inspection - $6,500 (CAMMP) Percival Landing Maintenance Fund - $50,000 (CAMMP) 2013 CFP F Float Replacement - $297,000 Annual inspection - $6,800 (CAMMP) 2014 CFP 5-year inspection - $43,000 (CAMMP) Percival Landing Maintenance Fund - $27,000 (CAMMP)

Projected Costs and Timeline Section A Phase II Repair boardwalk $750,000 within 3-4 years Replace floats $6.5M Replace all $15M Section B Repair boardwalk $1.6M within 3-4 years Replace $20M Section C Repair boardwalk $1.3M within 5-10 years Replace $20M Percival Landing Update

F Float Replacement Background Closed F float in January 2013 Designed and bid replacement project. Received bids December 5, Bids received exceeded funds available. Permit timeline limitations Single float manufacturer willing to bid Currently reviewing options for moving forward

Percival Landing Update Options Option A) Rebid as designed. This would require the allocation of an additional $440,000. Option B) Obtain a second engineering opinion or evaluation. Option C) Change design to fit within remaining funds ($400,000). Project would include: Removal of all of existing F Float Construct only the pump out finger float as designed Install new pump out Repair F Float as originally designed (flotation and structural) Add water and power to existing E Float

Option C) E & F Float Proposal Percival Landing Update E Dock: Add water and power F Dock: Replace single float for new pump out F Dock: Remove moorage floats