CEPC Vacuum Systems Design Consideration

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

First Wall Heat Loads Mike Ulrickson November 15, 2014.
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
20-21 January 2009, RAL Joint DL-RAL Accelerator Workshop 1 INVESTIGATION OF NON- EVAPORABLE GETTER FILMS O. B. Malyshev, K.J. Middleman, A. Hannah and.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
SR Vacuum Systems and Front Ends
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Beam screens in IT phase 1
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
CEPC 真空盒研制进展 2016/4/27. 报告内容 1. 真空盒材料 2. 真空盒形状 3. 真空盒热应力计算.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Halo Collimation of Protons and Heavy Ions in SIS-100.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
τ- Charm Vacuum System Preliminary
INVESTIGATION OF NON-EVAPORABLE GETTER FILMS
Beijing Institute of Technology
Some Design Considerations and R &D of CEPCB Dipole Magnet
Experiments on Fast Ion Instability at PLS
Stress and cool-down analysis of the cryomodule
Vacuum Problems in the ILC Damping Ring
Cornell ERL Prototype Injector DC Photocathode Gun Design Review Vacuum Systems Yulin Li, January 5th– 6th, /5-6/2011 Cornell Gun Review.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Preliminary Y-chamber specifications – First draft
The Interaction Region
MDI: Trapped modes and other power losses
R. Kersevan, TE-VSC-VSM 30/06/2016
Vacuum System Failures at HERA
Electron cloud & vacuum pressure observations: 2011 proton run
CEPC Vacuum System Dong Haiyi 2017/11/5.
Electron cloud and collective effects in the FCC-ee Interaction Region
Challenges for FCC-ee MDI mechanical design
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
XFEL Collimation and Beam Switchyard Vacuum Issues
Discussion on the TDI impedance specifications
Accelerator R&D Results from the B-factory
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
IR Beam Transport Status
Presentation transcript:

CEPC Vacuum Systems Design Consideration Ma Yongsheng Dong Haiyi May 1, 2019

Outline Basic requirements to the vacuum system 2. Synchrotron radiation power and gas load Vacuum chamber Bellows Module with RF Shielding Pumping system Vacuum measurement and control Summary

1. Basic requirements to the vacuum system A vacuum in the lower than 310-9 Torr is required when a beam is circulating in the collider. It can be shown that the beam lifetime would exceed 20 h if only losses due to Interactions between beam and gas. A pressure of 310-10 Torr or lower outboard the Q1 magnet must be achieved in the interaction regions to minimize detector backgrounds from beam-gas scattering. Good beam lifetime must be achieved soon after the initial startup with a stored beam. The system must be capable of quick recovery after the sections are vented for maintenance. The chamber wall is designed as smooth as possible to minimize the electromagnetic fields induced by the beam. Sufficient cooling to safely dissipate the heat load associated with both synchrotron radiation and higher-order-mode (HOM) losses. Capability to shield outer ring components from synchrotron radiation.

2. Synchrotron radiation power and gas load In the design of the storage ring vacuum system, two issues produced by the synchrotron radiation must be considered: One is the Heating of the vacuum chamber walls owing to the high thermal flux Another is the strong Gas Desorption (both photon-desorption and thermal desorption). The dynamic pressure induced by synchrotron radiation can rise by Several Orders of Magnitude once a beam starts circulating.

2.1 Synchrotron radiation power

2.2 Gas load Chamber material Material fabrication and preparation Amount of prior exposure to radiation Photon angle of incidence Photon energy

3. Vacuum chamber The synchrotron radiation power deposited on the arc chamber wall would entail using a water-cooled high electrical conductivity chamber material (aluminum or copper); Copper is preferred in the CEPC dipole chamber design for the positron ring because of its naturally lower molecular yields, lower secondary electron yields, lower electrical resistance, higher thermal conductivity, and good radiation self-shielding; Considering the cost of manufacture, the dipole vacuum chambers of the electron ring will be fabricated from the Aluminum alloy.

Al & Cu

Aluminum vacuum chamber The dipole vacuum chamber of storage ring Aluminum vacuum chamber (elliptic 7556, thickness 3, length 6000) Copper vacuum chamber (elliptic 7556, thickness 3, length 6000) The vaccum chamber manufacturing procedure follows these steps: NO The aluminum chamber The copper chamber 1 •Extrusion of the chambers •Extrusion of the beam pipe and cooling channel 2 •Machining of the components to be welded 3 •Chemical cleaning 4 •Electron-beam welding 5 •Welding of the water connections and flanges •Welding of the end flanges and water connections 6 •Leak detections •Leak checks 7 •NEG coating inside chamber

Finite element analysis for vacuum chamber E=120GeV, I=17.7mA, h=1000 W/m2∙℃ The aluminum chamber The copper chamber •The highest temperature reaches 39.9 ℃; •The highest temperature reaches 37.4 °C; •The maximum stress is 15.7 MPa; •The maximum stress is 12.1 MPa; •The maximum deformation is 0.029 mm. •The maximum deformation is 0.016 mm. •(SR hitting another side of the cooling channel, temperature will be 78.3 ℃) •(SR hitting another side of the cooling channel, temperature will be 53.7 °C)

4. Bellows Module with RF Shielding The primary function of the bellows module : allow thermal expansion of the chambers and for lateral, longitudinal and angular offsets due to tolerances and alignment, while providing a uniform chamber cross section to reduce the impedance seen by beam. It is important to get a minimum contact force to avoid excess heating and abnormal arcing at the contact point. The leakage of higher order mode from the slits between contact fingers into the inside of bellows is another important problem.

Double finger of RF bellow For CEPC, the fingers are designed to maintain a relatively high contact pressure of 15010 g/finger, and the slit length between fingers is set to be 20mm. The RF-shield should absorb the maximum expansion of 10 mm and contraction of 20 mm, allowing for the offset of 2 mm. The step at the contact point is limited to less than 1mm. The cooling water channel is attached considering the reflecting power of the synchrotron radiation, Joule loss and HOM heat load on the inner surface, and the leaked HOM power inside the bellows. RF shielding bellow module

Comb type RF Bellow The comb-type RF shield has a structure of nested comb teeth, and has higher thermal strength and lower impedance than the conventional finger-type one. Advantages of the comb-type RF-shield are as follows: (1) The RF shield, i.e. the copper teeth, has a high thermal strength compared to thin fingers. (2) There is no transverse step at inside surface in principle, and the shield has low impedance. (3) The TE-mode like HOM, which can easily couple with the finger-type RF shield, hardly goes through due to the large radial thickness of teeth. (4) There is no sliding point on the inner surface of beam duct, which otherwise could be a source of arcing. (5) The RF shield can fit for beam ducts with various cross sections. The potential disadvantages compared to the finger-type RF shield, on the other hand, are the limited stroke of expansion/contraction, typically ±4 mm, and the small bending angle, ±30 mrad at most

5. Pumping system The circumference of the CEPC storage ring will be subdivided into about 520 sectors by RF all metal gate valves, which allow all vacuum work to be done in sections of manageable length and volume. The main pumping is preferably achieved with Non Evaporable Getter(NEG)-coated copper chambers in the positron ring, the ion pumps will be used pump off CH4 and noble gases

5. Pumping system The aluminum chambers of the electron ring are evacuated by the ion pumps and bulk NEG pumps at a interval of about 6m. For interaction regions, depending on the space available, NEG pumps, sublimation pumps and ion pump will be used.

NEG coating of the inside chamber NEG coating suppresses electron multipacting and beam-induced pressure rises, as well as provides extra linear pumping. The NEG coating is Ti, Zr, V, Hf alloy, deposited on the inner surface of the chamber through sputtering. NEG films can be fully activated at relatively low temperature.(e.g. 180C24 hrs.) has been successfully applied in the case of aluminum chambers (LHC). Vacuum Distribution Low SEY NEG coating pump Ion sputtering pump B. Henrist, N. Hilleret, App. Surf. Sci.172(2001)95 Oleg. B. Malyshev

NEG Coating Facility for HEPS-TF Coating Facility: Direct Current Magnetron Sputtering systems for NEG coating, capable to coat up to 1.5 meter long chambers with a 280mm dimeter pipe Coating Facility Plasma distribution Twisted wire

NEG Coating Pumping Test Facility Vacuum Pipe:1000 mm×23mm Film area: 722cm2 Orifice Conductance: Ф 6/4/2 mm Test gas: CO, H2 TiZrVHf [1] C. Benvenuti et al. Vacuum 71(2003). 307-315

Properties of NEG NEG coating for HEPSTF has reached the project`s aim XPS analysis _Can be activated at 180℃——TiZrV Columnar film for high pumping speed Dense film for low impedance NEG coating for HEPSTF has reached the project`s aim The film lifetimes with a thickness of 100 nm will be experimented.

Secondary Electron Yield for NEG Coating Compared SEY of TiZrV& TiZrVHf We did not test SEY after activation for limited of machine. The SEYs of NEG coating films after activation will decrease to 1.1 according to the references. Air exposed B. Henrist, N. Hilleret, App. Surf. Sci.172(2001)95

6. Vacuum measurement and control The size of CEPC excludes the installation of vacuum gauges at sufficiently short intervals, some special sections such as injection regions, RF cavities and interaction regions are equipped with cold cathode gauges and residual gas analyzers. The current of the sputter ion pumps, which are placed at the interval of 6~18m, will be monitored continuously and should provide adequate pressure measurements down to 10-9 Torr. Some mobile diagnosis equipment can be brought to the place of interest during pump down, leak detection and bakeout when the machine is accessible. The control of the vacuum system will be part of the general computer control systems; it includes the control of the sputter ion pumps, vacuum gauges, sector valves, and the monitoring of the water cooling of the vacuum chambers.

7. Summary Basic requirements of the CEPC vacuum system are presented. Synchrotron radiation power 435W/m and gas load are calculated 3.6×10-8 Torr l/s∙m. The materials and shapes of the vacuum chambers are analyzed and compared, and the aluminum alloy will be chosen for the electron ring and the copper for positron ring to reduce SEY. A three-dimensional drawings of RF bellows are designed. Pumping system, vacuum measurement and control are considered. The routine technology will be used for the LINAC and Booster vacuum system.

Thank you for your attention!