Work Cell Development Ingalls Shipbuilding March 13, 2019

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

Rebuild Massachusetts and PHEEP Energy Information Services Project Presentation to DCAM, EOEA, HUD January 4, 2006.
Constellation Heating and Cooling Building Automation Systems.
Navy Metalworking Center A ManTech Center of Excellence Advanced Metalworking Solutions for naval systems that go in harm’s way Distribution Statement.
Assembly Bill 617 (Torrico) Financial Risk Mitigation February 23, 2009.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
1 The Cost of Organizational Structures and Interfaces prepared for Ground System Architectures Workshop by Darryl W. Webb Business and Operations Analysis.
IT PLANNING Enterprise Architecture (EA) & Updates to the Plan.
Design, pageRaffoBA Design and Technology Design, pageRaffoBA Scope of Operations Support from Accounting, Finance, Human Resources, Information.
November Northrop Grumman Ship Systems 14th annual International Integrated Program Management Conference Washington D.C.
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Optimizing IT Department Project Portfolio Management (Concurrency Corporation)
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Product Design Specifies materials Determines dimensions & tolerances
The Microsoft Office 2007 Enterprise Project Management Solution:
Teezle TMatics M2M Platform & Solutions Overview January 28 th, 2014.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Push Technology Job Description Development and Management System HR Innovations Catalogue Executive Summary A No Frills Distillation of Vendor’s Marketing.
From Research Prototype to Production
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Chapter 4 Process Design.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
IMPROVED CONTAINER LIFTING FRAME (ICLF). IMPROVED CONTAINER LIFTING FRAME - MARK II (ICLF-Mk II) Quantum Engineering Design, Inc (QED) 01/28/04 OBJECTIVES.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
Product Design Specifies materials Determines dimensions & tolerances Defines appearance Sets performance standards.
What’s Coming…. Today (2/16) Update and review a sample final presentation (20’) Group Presentations- milestones and resource requirements (50’) Work Sessions.
Regional Technical Forum July 8, 2002 Ken Anderson, NW Energy Efficiency Alliance Business Computer Energy Savings EZConserve’s Surveyor Software.
Carl G. Ray Program Executive Small Business Innovation Research Small Business Technology Transfer SBIRSBIR To increase small business participation.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
It is the mission of 4E-Eagle Electric Engineering Enterprise, A Division of Eagle Industries, Inc. to provide products, services and solutions of the.
Facility Consolidation Proposal IEM 5121 July 21, 2003 Robert Volk.
1 DLA Aging Systems Program: Technology Investment for Sustainment Cliff Wolfe Program Manager DSCR-VE March 2005.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Slide 1 Eurostat Unit B6 – Dissemination IT Directors Group 24 – 25 October 2005 Cooperation with Member States on Internet Gunter Schäfer Eurostat B6:
© Siemens A/S 2015siemens.com/answers Siemens Partner Program Automation, Drives, Power, Services.
Excellence in Performance Based Logistics Presented at: PSM Workshop 6 April 2016 Presented by: John Dockins, EA-6B Integrated Weapons Support Team (IWST)
Briefing on Notional Core Training for Services Acquisition (Non-Acquisition Workforce) Defense Procurement and Acquisition Policy, Services Acquisition.
Upturn Consulting 27, March 2017.
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
State Coordinator Intervention
Core Competencies in Advanced Manufacturing
Systems Implementation,
Business System Development
Implementing Effective Energy O&M Strategies on a Limited Budget
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
City-wide LED Street Light Conversion Program
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
From PDS to SP3D From PDS to SP3D
TPF-5(181) Research Management Database Business Analysis
Election System Modernization
Lockheed Martin Canada’s SMB Mentoring Program
Cell Deployment Process
System Development Life Cycle (SDLC)
QEP/Pathways The Pilot Year.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Technology Evaluation (RATE)
Shaped Plate Verification
High Speed Rotating Arc Welding Process
NSRP Workforce Development Panel – Navy Program Manager Thoughts
DCN# Ambre Cauley R&D Portfolio Manager
Sheet Metal Modernization ManTech Project No. S2702
Robotic Process for Installing Hull Inserts
Chapter 13 Building Systems.
from ideation to design and realization
Technology Maintenance
Equipment Maintenance Office Supplies Replenishment
Presentation transcript:

Work Cell Development Ingalls Shipbuilding March 13, 2019 DCN# 43-5004-19 Sarah Hayes ManTech Project Manager Prepared under ONR Contract N00014-14-D-0377 as part of the Navy ManTech Program This material is based upon work supported by the Naval Shipbuilding Advanced Manufacturing Center of Excellence under Contract No. 2015-456-11

ManTech Team Members ONR Program Office (Program Officer) Paul Huang Program Office (Designator) Todd Hellman (PMS-400) Contractor Organization Ingalls Shipbuilding Ambre Cauley (ManTech Manager) Sarah Hayes (Project Manager), Reid Kennedy (Technical Lead), Michele Robb (Contract Specialist), & Nick Rosetti (Budget Analyst) Center of Excellence NSAM Dale Orren (Deputy Director) Tim Macon (Program Manager) Richard Storch (Project Technical Representative) Wade Hedges (Contract Manager)

Issue Description & Project Objective The current process, tools, and equipment utilized to fabricate many repetitive parts require intensive manual processes. Currently, there are currently no readily available commercial off-the-shelf solutions to automate or semi automate these processes. Project Objective The project’s objective is to develop a manufacturing solution focused on improving process efficiency and tooling for production of repetitive tasks and labor intensive products. Work Cell Approach Advanced Tooling and Fixtures Modifications to existing equipment and processes

Work Cell Prototype Development Concept Development Project Overview Develop Final Report Work Cell Pilot Work Cell Prototype Development Concept Development Shop Process Baseline & Part Family Identification Project Initiation Planned Work Completed Work

Shop Process Baseline & Part Family Identification Integrated Product Division (IPD Shop) Manhole Assemblies Tank and Manufacturing Testing Continual Process Evaluation Electrical Shop Light Legs Machine Shop Field Bolts Custom Bolts These three areas were selected as they encounter more uniform, high volume parts than most shipyard process areas and likely have the highest potential for successful application of work cell and process development with resultant savings, efficiency and quality improvement.

Integrated Product Division (IPD Shop) Tank Manufacturing Manhole Assemblies

Electrical Shop Light Legs & Light Feet Pipe Spools

Machine Shop Custom Bolts

Work Cell Prototype Development Next Steps Concept Development Market Survey Identify Work Cell Concepts Candidate Downselect Work Cell Prototype Development Prototype Design Test Plan Development Prototype Testing Prototype Modifications Work Cell Pilot Pilot Test Plan Execute Pilot Final Modifications Final Reporting Implementation Plan Final Business Case Final Report

Benefits This project will provide the following benefits: Reduced labor Improved quality Increased throughput by workflow planning Improve efficiency resulting in schedule savings