Nimble Storage – Success Story Nick Furnell. Welcome.

Slides:



Advertisements
Similar presentations
A: acceleration E: equilibrium Determine whether the following diagrams illustrate acceleration or equilibrium. Number your paper from 1 to 5 and answer.
Advertisements

Mental Mind Gym coming …. 30 Second Challenge - Early Additive.
Fill in missing numbers or operations
ARIZONA DEPARTMENT OF ADMINISTRATION INFORMATION SERVICES DIVISION - DATA CENTER.
A whole 1 1 Half Half Third Third Third Quarter
Understand multiplication and division as inverses
Multiplication and division as arrays 1) 2)3) 4)5) 7) 6) 8) 9) Use each array to write 2 multiplication and 2 division sentences ©
Ozone Level ppb (parts per billion)
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
Steel 1.34% growth in steel production in the last 10 years 2.50% of production in OECD, Moderate trade – 30% of production traded 4.Highly fragmented.
All Rights Reserved, Copyright(C) 2007, Hitachi, Ltd. 1 Transport-layer optimization for thin-client systems Yukio OGAWA Systems Development Laboratory,
Agenda Trends & Technology Real Metrics The Philotek Model.
Half Life. The half-life of a quantity whose value decreases with time is the interval required for the quantity to decay to half of its initial value.
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
1 s Share 2 s Share 3 s Share settles with 1 for $200,000 (the limit of 1 s insurance policy) settles with 1 for $700,000 Fault allocation: =0%, 1 =50%,
Deploying Virtualised Infrastructures for Improved Efficiency and Reduced Cost Adrian Groeneveld Senior Product Marketing Manager Adrian Groeneveld Senior.
Capacity Planning in a Virtual Environment
NOTES: FY 2015 is the President’s Budget Request. Some FY 2015 funding for TB programs at USAID (between $8 and $20 million in prior years) and malaria.
WHEEL OF EOC CLICK THE SPINNER BANKRUPT $50 $5 $10 $20 $500 $100.
Young People’s Project AA YP Project Progress Report Chester April 2014.
BT Managed Compute Solution Overview April 2013 Chris Faulkner Head of Managed Hosting Rob Ellison Managed Hosting Architect.
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Flame conference, Amsterdam, 13th March 2007
HYPER V 3.0 David Hodap, Geodetski zavod Rijeka MCT
CHESAPEAKE BAY PROGRAM EXECUTIVE COUNCIL GUNSTON HALL ▪ LORTON, VA ▪ JULY 9, Strategies To Meet Infrastructure Finance Goals Christopher D. Pomeroy.
Doc.: IEEE /0012r0 Submission January 2013 Graham Smith, DSP GroupSlide mc Annex N Discussion/Proposals Date: Authors:
Number bonds to 10,
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
Wednesday, March 20, 2013MAT 145. Wednesday, March 20, 2013MAT 145.
Powerpoint Jeopardy Category 1Category 2Category 3Category 4Category
R Street Improvement Project (30% Review Meeting) February 28, 2007 August 20, 2008 City of Sacramento R Street Market Plaza Project 16 th Street to 18.
Tomi Dolenc Jernej Porenta Arnes TF-MSP, Heraklion User‘s Needs in the Cloud.
Virtunet Systems Elevator Pitch
Adam Duffy Edina Public Schools.  The heart of virtualization is the “virtual machine” (VM), a tightly isolated software container with an operating.
1 Windows Disaster Recovery (DR) with Replication using Double-Take Availability.
VIRTUALIZATION AND YOUR BUSINESS November 18, 2010 | Worksighted.
Virtual Network Servers. What is a Server? 1. A software application that provides a specific one or more services to other computers  Example: Apache.
© Novell, Inc. All rights reserved. 1 PlateSpin Protect Virtualize your Disaster Recovery.
SAIGONTECH COPPERATIVE EDUCATION NETWORKING Spring 2009 Seminar #1 VIRTUALIZATION EVERYWHERE.
Planning and Designing Server Virtualisation.
Presented by: B2B Technologies B2B TECHNOLOGIES | PRESENTATION Using Azure As a Platform for SharePoint.
CPS Welcome to a new licensing model in SPLA.
Adam Duffy Edina Public Schools.  Traditional server ◦ One physical server ◦ One OS ◦ All installed hardware is limited to that one server ◦ If hardware.
Presentation to Department Heads Cloud Computing Information Systems Division November 5, 2010.
Server VirtualizationServer Virtualization Hyper-V 2012.
Proposed Server Infrastructure for the EGIS Initiative.
Nimble Storage – VMUG Success Story Nick Furnell.
Practical IT Research that Drives Measurable Results Leverage Server Virtualization for DR Affordability and Agility 1Info-Tech Research Group.
Disaster Recovery on Steroids M Kent Linsenmann. Introduction Why How Solution Implementation Review.
Module Objectives At the end of the module, you will be able to:
© 2014 kCura. All rights reserved. vCloud Hybrid Services VMUG
RED HAT ENTERPRISE VIRTUALIZATION 3.0 YOUR STRATEGIC VIRTUALIZATION ALTERNATIVE.
Disaster Recovery Prepared by Mark Lomas Mark Lomas IT Infrastructure Consultant Storage & Servers.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
ITE Hirakjyoti Nath Class 7
Making the Cloud Less Cloudy
Production Methods.
San Luis Potosi – New plant MAY 8TH 2015
Welcome! Thank you for joining us. We’ll get started in a few minutes.
What does “Zero Client” means?
Let’s Discuss Cloud Services in India Are we going to talk about these beautiful clouds? Great.
County of Los Angeles Results
CS 140 Lecture Notes: Technology and Operating Systems
CS 140 Lecture Notes: Technology and Operating Systems
كار همراه با آسودگي و امنيت
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
BusinessObjects IN Cloud ……InfoSol’s story
مديريت موثر جلسات Running a Meeting that Works
Virtunet Systems Elevator Pitch
Presentation transcript:

Nimble Storage – Success Story Nick Furnell

Welcome

Less than 50 Less than 100 More? How many VMs do you run?

30 VMs 3 Hosts, single CPU Local DC + AutoLoader 30 VMs 3 Hosts, Single CPU Local DC Head OfficeISP Co-Lo

How many VMs do you run? Head OfficeISP Co-Lo

Less than 20TB Less than 50TB More? How much Storage do you have?

How old is your SAN Infrastructure? Hitachi AMS200 5 years old Due for replacement Head OfficeISP Co-Lo Hitachi AMS year old

Proposed replacement SAN... AMS200Proposed Replacement

2013 Keogh Report Implications AMS200Proposed Replacement

Needed Flexibility AMS200Alternative Replacement

Disaster Strikes mid-project 30 VMs 3 Hosts, single CPU Local DC + AutoLoader Head Office Latency <20ms +100ms

Disaster Strikes mid-project 25 VMs 3 Hosts, single CPU Local DC + AutoLoader Head Office Latency

Nimble - Testing

Compression? Snapshots? Caching? Block Size? Single 6TB Volume Nimble - Traditional Volumes?

Data Repository? Structured by Services? Something else? How do you view Storage?

Nimble – per Volume based Profiles Traditional LayoutFlexible Nimble Layout Images (iSCSI) Unstructured Data Groupwise Payroll SQL Backups Veeam Cache

Nimble – Manual vVols? Nimble C220 iSCSI Volume Compression & Caching OFF Snapshotting ON Head OfficeISP Co-Lo Hitachi AMS2100 Traditional VMDK Disk Windows DFS Manages file changes

Nimble - Volume Summary

My Favourite Nimble Features? Flexibility UpgradeabilityInfoSight

Flexibility – Volume Creation VolumeCompressionCaching Protection Profile Block Size A OnOffHourly4k B Off Daily8k C On Weekly16k D OffOnOff32k

Flexibility – Volume Creation VolumeLimit Access Volume Warning Snapshot Quota Snapshot Warning A ESX90%Unlimitedoff B ESX80%Unlimitedoff C Backup80%20%10% D Linux95%Unlimited20%

Upgradeability – Hot Plug Tray

InfoSight – Whats going on? Remote Access Engineer ViewGlobal Monitoring

InfoSight – Performance Past & Future

InfoSight – Want more detail?

InfoSight – Impact of Information

InfoSight – Under the hood

Questions about my Experience?

Nimble – Success Story