L IGHTING B ASED E NERGY E FFICIENCY U PGRADES - L ESSONS L EARNED Christopher Richard, PhD, P.E., CxA Smart Building Systems, Inc. April 17, 2013.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
Building a Better Future Stretch Building Code October 15, 2009.
Energy Codes & Lighting Controls
By MTI Industries, Inc. RV Safety Alarms Education Test Carbon Monoxide Alarms.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
ABC Technology Project
Fundamentals of Efficient Lighting
Lighting Retrofit Project Presented by Ed Johnson, Director Facility Services July 13, 2009.
1 Lux Live 2013 Retrofitting Of Lighting Controls Steve Buckley Rako Controls Ltd.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
Sustainability Best Practices for Lighting Retrofits Cal Poly State University, San Luis Obispo Presented to the UC/CSU/CCC Sustainability Conference June.
Kandice Castellino | February 2014 | Burlington, VT
August 18, 2013 Consumer Preferences. What is Power? Power is the rate at which work is performed. Equations:
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
2 |SharePoint Saturday New York City
© S Haughton more than 3?
VOORBLAD.
Federal Aviation Administration Environmental Prescreening Training Module 3 Noise Review.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Chapter 5 Test Review Sections 5-1 through 5-4.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Figure Essential Cell Biology (© Garland Science 2010)
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
How Cells Obtain Energy from Food
Columbus State Community College
Management and Organisation of Electricity Use Energy Efficient Lighting Techniques Belgrade November 2003.
Building Lighting Controls
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
Nonresidential Lighting Alterations
Presentation transcript:

L IGHTING B ASED E NERGY E FFICIENCY U PGRADES - L ESSONS L EARNED Christopher Richard, PhD, P.E., CxA Smart Building Systems, Inc. April 17, 2013

Outline Project Overview Proposed Solutions Accepted Solutions Issues Encountered /Lessons Learned Conclusion 2

Project Overview ARRA-funded lighting replacement and controls upgrade for GSA Project dates: January 2010 through August 2012 Building size: Eight federal courthouses & office buildings in Alabama and Georgia, ~2.5 million ft 2 combined. Four designs taken to implementation 3

Diverse Building Characteristics Ages – historical(1932) to modern (2002) Sizes – 100,000 SF to over 1million SF – 5 floors to 25 floors Uses – call centers, courtrooms, private offices, large open offices, prisoner holding areas, etc. 4

Proposed Solutions Luminaire Replacements Spectrally Enhanced Lighting Relamping Delamping Controls – Local – Global – Daylight Harvesting 5

Luminaire Replacement Primary ECM: 3 lamp 32WT8 replaced with 2 lamp 28WT5 – Improved energy performance Parabolic luminaires replaced with volumetric luminaires – improved light distribution with no cave effect 6

Spectrally Enhanced Lighting Take advantage of human perception of brightness Use lamps with higher Color Temperature /CRI Lamps (e.g. 5000K 82 CRI vs more common 3500K 75CRI) more like natural daylight Use lower light intensity (Fc) Increased visual acuity 7

Spectrally Enhanced Lighting Lower light levels (fc) result in equal visual acuity and perceived brightness Lower light levels (fc) result in equal visual acuity and perceived brightness /news_detail.html?news_id= /news_detail.html?news_id=

Relamping and Delamping Relamping – Replace older technology lamps (e.g. incandescent) with newer, more efficient lamp types (e.g. CFL or LED), cost permitting Delamping – Remove lamps in over lit areas to comply with recent energy guidelines (AHRAE 90.1) – Replace 3 lamp luminaires with 2 lamp luminaires 9

Improved Controls Local – Occupancy and Vacancy Sensors Global – Building wide lighting controllers (multiple OFF sweeps per day based on time) Daylight Harvesting – Dimming or extinguishing lightings during times of abundant natural light 10

Accepted Solutions Luminaire Replacements Retrofits Spectrally Enhanced Lighting Relamping Delamping Controls – Local – Global Rezoning – Daylight Harvesting 11

Less costly than full luminaire replacements Structural parts of the original luminaire remain Kits still allow for conversion from parabolic to volumetric Kits still allow for 3 lamp to 2 lamp conversion Retrofit Kits 12

Rejection of SEL GSA disapproved SEL due to unproven nature of the approach GSA did approve conversion to consistent higher color temperature lamps (4100K vs 5000K for SEL and the original 3500K for most existing lamps) 13

Local Controls 14 DT Ceiling Mounted Sensor PIR Switch Sensor

Rezoning Goal is to reduce the number of lights energized for a single person or small group working in an area of the building outside of normal business hours. With flour globally controllable zones per floor, only a quarter of a floor 15

Zone Layout Existing wiring and cost restriction limited the project to two zones (vs proposed four) per floor. 16

I SSUES E NCOUNTERED AND L ESSONS L EARNED 17

Retrofit kits Kit Installation was an issues. Not all 2x4 recessed luminaires are created equal Historic building contained a large variety of luminaire styles and sizes Some sites had metric 2x4 (600mm x 1200mm) Had to resocket and reballast in some locations as kits would simply not fit. 18

Occupancy and Vacancy Sensors Sensor density (Cost vs. Coverage) Ceiling height (wall mounted vs ceiling mounted) High walled cubicles Added walls during remodel Doors, furniture and other obstructions White noise generator Sensor settings – Occupancy mode (auto on) or vacancy mode (manual ) – Dual Tech trigger setting (e.g. both to trigger on, either to hold on) – Time delay settings – Sensitivity 19

General Wiring – Renovations make existing circuits poor zone choices for control zones (local or global) – Wiring not up to code – No neutrals a switch location (cant use most dual technology sensors) 20

C ONCLUSIONS 21