Beam Position Noise from 500 keV MBO0I06 Dipole Sensor

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

Compton (and other) Issues. HAPPEX III Electron Analysis is already good enough. Photon integration as test. Photon counting analysis should be good.
Robert J. Feuerbach Jefferson Lab Constructed from contributions from the HAPPEX Collaboration Hall A Collaboration Meeting December 5, 2005 HAPPEX-II.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Accelerators. Electron Beam  An electron beam can be accelerated by an electric field. Monitors Mass spectrometers  Any charged particle can be accelerated.
1. Describe helicity magnet (HM) system 2. Con’s of PZT’s & Pro’s of HM–type system for BT measurements 3. Other Possibilities, Comments from BT & Planning.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Virgo Control Noise Reduction
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Collimator June 1-19, 2015HUGS The collimator is placed about 85 cm from the target and intercepts scattered electrons from 0.78° to 3.8° Water cooled.
M1H Transfer Function Georg Gassner, March 6 th, 2013.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
PVDIS at JLab 6 GeV Robert Michaels Jefferson Lab On Behalf of the HAPPEX Collaboration Acknowledgement: Talk prepared by Kai Pan (MIT graduate student)
Fast Helicity Reversal Riad Suleiman Injector Group June 2, 2009.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Parity Quality Beam (PQB) Study Injector Group September 2008.
Performance of PHENIX High Momentum Muon Trigger.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
EE 4BD4 Lecture 14 Position Sensors 1. Types of Sensors Potentiometers and linear resistors Capacitive sensors (mm distances, e.g. capacitive microphone)
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
A New, Robust Beam Modulation Strategy for the Q p weak Experiment Nuruzzaman ( Advisors: Dr. Dipangkar Dutta (
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Parity Violation Experiments & Beam Requirements
Spin Precession At CEBAF
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
G0 Backward Angle Accelerator Preparations
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
5 MeV Mott Measurement for CEBAF Operations group
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
QWeak Collaboration Meeting
MDL0L02 Dipole Hysteresis Loop Study
G0 PC Installation and Beam Studies
Qweak Coordination Meeting
Polarized Source Development Run Results
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
Helicity Magnets’ Control Upgrade
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
B-Team Meeting October 28, 2009
Experiment Energy (GeV) Pol (%) I (µA) Target Apv (ppb) Charge Asym
Seismometer Development for the 1TeV Linear Collider
Injector Commissioning & Optimization
Run Coordinator Report for PVDIS (E08-011)
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Presentation transcript:

Beam Position Noise from 500 keV MBO0I06 Dipole Sensor May 13, 2009

Beam Position Noise The Sensor was installed as part of the Segmented Injector PSS system in early Summer 2006 500 keV Dipole Current Sensor moves beam at frequency other than 60 Hz; about 80 Hz This is the major source of beam position noise in Injector. 60 Hz line noise sources have been reduced This noise makes measuring helicity correlated position differences far less accurate; increases the width of position differences. Same for charge asymmetry if there is scrapping in the accelerator How does it affect the physics program? 30 Hz Helicity Reversal is designed to cancel 60 Hz line noise; Sensor noise will not cancel completely 240 Hz Helicity Reversal for PREx; most sensitive Qweak at 1 kHz is also sensitive but less than 240 Hz Helicity Reversal Fine for HAPPEx III and PVDIS. Fix by March 1st , 2010

Sensor ON PSS Dipole Magnet Sensor OFF Sensor ON The PSS dipole is between 0I05 and 0I07. Sensor ON

Sensor ON PSS Dipole Magnet Sensor OFF Sensor ON

30 Hz PSS Dipole Magnet 250 Hz 1 kHz The PSS dipole is between 0I05 and 0I07. 1 kHz

30 Hz PSS Dipole Magnet 250 Hz 1 kHz The PSS dipole is between 0I05 and 0I07. 1 kHz

30 Hz

250 Hz

1 kHz

30 Hz

250 Hz

1 kHz