Roof Replacements and Associated Tuckpointing at SWRP & LASMA Contract #11-961-21 4/12/20131.

Slides:



Advertisements
Similar presentations
Peter Grimm, DO Seattle Prostate Institute Latest update 4/23/09.
Advertisements

NANC Report Numbering Oversight Working Group (NOWG)
Welcome to PMP certification Introduction for Managers
AMERICAN RED CROSS (ARC) DISASTER SERVICES
Presenter: Your Name Here 11/5/ Volunteer for Sierra Club Canada 2 Important Points: Its Easy Lots of Benefits Clear up some myths 5-10 minutes.
BOARD MEMBER RESPONSIBILITIES FOR WORK HEALTH AND SAFETY
Vocational School in Bersenbrück
TWIST Child Care Conversion Questions and Answers 11/6/20131.
1 NETaction NETaction Customer Satisfaction Manager By Daniels Associates Inc.
Wi-Fi Technology By: Mohamed Hassan Ali May, 2005.
1 SnT – Interdisciplinary Centre for Security, Reliability and Trust 2 Bell Laboratories, Alcatel-Lucent Identifying abnormal patterns in cellular communication.
Sandwich District-Wide Master Plan Presented to Sandwich School Committee Sandwich Board of Selectman Presenters Dr. Richard Canfield, Superintendent Philip.
12/20/20131 Steps To Success presents How to use Linkedin.
Feeding the Content Monster: How to Repurpose Your Association's Web Content for Use in Social Media Leslie OFlahavan, Association Media.
Creation of Innovation Clusters in Greece: the GSRT approach
Fundamental Digital Electronics Fundamental Digital Electronics.
V. Sola & al1. CMS Pixel Upgrade Meeting
Broadcasting in Conflict Aware Multi-Channel Networks WALCOM 2013 – Feb 14, 2013 Shahin Kamali 1 Joint work with Francisco Claude 1, Reza Dorrigiv 2, Alejandro.
MADISON MARKET 2013 LANDRETTI & COMPANY, LLC DOMINIC LANDRETTI, MAI December 2013.
SHRM Survey Findings: 2013 Holiday/Year- End Activities December 4, 2013.
Buy Side & Sell Side Alexander Motola, CFA Alexander Motola,
Administrative Professionals Forum
Internet Basics and Information Literacy
How to Build a REST API Using ASP.NET Web API Fernando Cardenas 10/8/20131.
Input/Output Systems and Peripheral Devices (03-3)
Online PD Resources for Seeing Structure and Generalizing Joanne Rossi Becker San José State University Session #705
Managing 3 rd Party Risks During a Crisis Experis |, June Danny Shaw SE Practice Leader IT Risk Advisory Services Managing and mitigating the risks.
Managing Your Files.
Regulation of Fluid and Electrolyte Balance Prof. K. Sivapalan.
Alaska Region Proving Ground Activities, Demonstration and Evaluation or Where We Are Eric Stevens UAF / GINA 6/18/20131.
QUALITATIVE ANALYSIS PROS & CONS by: Kevin Zarem, MAI
The IET/MATE Hong Kong Underwater Robot Challenge 2013 Dr Robin Bradbeer 08 June 2014Intro ROV Contest
Gwen Suntken RN BC, ICAC, MS LTC Resources LLC
Phone: (248) Twitter: twitter.com/GoMobileMI Why Mobile? Why Now? Using mobile technologies to maximize productivity.
Copyrights ©2013 CVMark. All Rights Reserved. The Capacity Hunt Shridhar Lolla
Mechanics of Ventilation
Gas Exchange in Lungs Prof. K. Sivapalan. Properties of Gases 20132Gas Exchange.
Public Goods and Common Resources Economics for Business II Day 10 Spring 2013.
Diffraction at the LHC Results from TOTEM, CMS and ATLAS Máté Csanád, Eötvös University Zimányi School December 5, 2013.
Washington, D.C. in pictures Autor: Mgr. Alžběta Fojtů Předmět Inovace výuky na Gymnáziu Otrokovice formou DUMů CZ.1.07/1.5.00/
May IStip Training for NQTs May
São Paulo, Brazil, 30 July 2013 Smart and sustainable cities: The importance of indicators and metrics in policymaking and policy assessment Alexandre.
School Teachers’ Pay and Conditions Document 2014 The interim School Teachers’ Pay and Conditions Document (STPCD) 2014 and accompanying.
Februari Organisation 22. Februari KI´s education and research DANDERYD HOSPITAL 235 FTE students Research SEK 33 million 26 FTE employees.
Small Wind Turbines Development & Building Approvals Draft Regulations for Industrial, Commercial and Special Purpose Districts May 2013 Onward/ By 2020.
March Back to Basics, 2013 POPULATION HEALTH Nick Birkett Epidemiology & Community Medicine.
Opportunities and Challenges of Textual Big Data for the Humanities Dr. Adam Wyner, Department of Computing Prof. Barbara Fennell, Department of Linguistics.
THE EVOLUTIONARY CASE FOR OPEN ACCESS C OUNCIL ON E AST A SIAN L IBRARIES A SSOCIATION FOR A SIAN S TUDIES 20 March 2013 Brian E. C. Schottlaender The.
Access to medicines: can differential pricing be an answer? Jo DE COCK, CEO NIHDI European Parliament
Micro Risk Why do we clean so often? Does the cleaning make the product safer? Process Improvement & Product Services September
Directors/Managers Qtrly Meeting August 2, 2013
Kevin Kelleher, Director, Human Resources 7/24/20132.
Evaluating funding modes towards a concept of funding ecologies Ulf Sandström KTH Stockholm Peter van den Besselaar VU University Amsterdam Org Science.
© Dr Kelvyn Youngman, March 2013 I am I said A local/local cloud by Neil Diamond in 3 minutes and 32 seconds.
CS151 Complexity Theory Lecture 4 April 11, 2013.
Excel Tutorial 3 Calculating Data with Formulas and Functions
Volleyball By Alina Agamy For Mark Hearn CBA Business Communications MWF 11:15 Fall 2013.
Intranasal Light Therapy
The CMS Particle Flow algorithm in CMS
Fluids 10/20/20131Deborah R. Fowler. Fluid Dynamics What is a fluid? Anything that takes the shape of its container (liquids and gasses) Fluid Dynamics.
KLARA chemical inventory 2013 Ulrika Olsson. How do I find KLARA – alternative 1  – internwebben – Choose system/tool – Chemical index Klara.
Independent Economic Development Task Force Meeting #11 October 30, 2013 K. Gleasman.
U.S. Environmental Protection Agency
Tutorial 11: Connecting to External Data
Microsoft Office 2013 ®® Access Tutorial 2 Building a Database and Defining Table Relationships.
Finding Optimal Program Abstractions Mayur Naik Georgia Tech Xin Zhang (Georgia Tech) Hongseok Yang (Oxford) Percy Liang (Stanford) Mooly Sagiv (Tel-Aviv.
RICH upgrade: layout, housing of the MaPMT, engineering (excluding the f/e electronics). Alessandro Petrolini on behalf of many collegues 16 maggio 2013.
Educational Champion Training MODULE 6: School Attendance © National Center for Youth Law, April This document does not constitute legal advice or.
Tutorial 12 Collaborating on a Shared Workbook
Issues Related to Parameter Estimation in Model Accuracy Assessment DDDAS: June 6-7, Tom Henderson & Narong Boonsirisumpun ICCS 2013 Barcelona,
Presentation transcript:

Roof Replacements and Associated Tuckpointing at SWRP & LASMA Contract # /12/20131

Roof Replacements and Associated Tuckpointing at SWRP & LASMA Project Buildings/Locations (10 Projects to be Completed over a Two Year Period) 2013 Projects: – Building #50, Aeration Battery C – Stickney WRP (SWRP) General Scope – Roof Replacement and Miscellaneous Concrete Repairs – Building #9015, Visitor Center - Lawndale Avenue Solids Management Area (LASMA) General Scope – Roof Replacement 4/12/20132

Roof Replacements and Associated Tuckpointing at SWRP & LASMA Project Buildings/Locations (10 Projects to be Completed over a Two Year Period) 2014 Projects: – Building #180, 52 nd Avenue Gate House - SWRP General Scope – Roof Replacement and Associated Tuckpointing/Sealing of Parapet Wall Limestone Coping Caps – Building #170, Main Foyer of West Side Pumping Station – SWRP General Scope – Roof Replacement – Building #21, Ejector Station D-1 – SWRP General Scope – Roof Replacement – Building #150, Imhoff Battery B, West Valve House – SWRP General Scope – Roof Replacement 4/12/20133

Roof Replacements and Associated Tuckpointing at SWRP & LASMA Project Buildings/Locations (10 Projects to be Completed over a Two Year Period) 2014 Projects (Cont): – Building #152, Imhoff Battery B, East Valve House - SWRP General Scope – Roof Replacement – Building #60, Effluent Disinfection Storage Building – SWRP General Scope – Roof Replacement and Associated Tuckpointing – Building #87, Scum Concentration – SWRP General Scope – Roof Replacement and Associated Tuckpointing – Building #9027, Racine Avenue Pumping Station (RAPS) General Scope – Roof Replacement and Associated Tuckpointing 4/12/20134

Building #50, Aeration Battery C - SWRP Bldg #50 Aerated Tanks Final Settling Tanks Note: The Contractor is responsible for preventing any demolition debris, construction material, tools, equipment, etc. from entering into the tanks. 4/12/20135

Building #50, Aeration Battery C - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 175 Squares 4/12/20136

Building #9015, Visitor Center - LASMA 4/12/20137

Building #9015, Visitor Center - LASMA New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with a White, Reflective Energy Star rated Aggregate Surface Estimated Squares Facing NE Facing SW 4/12/20138

Building #180, 52 nd Ave. Gate House - SWRP 4/12/20139

Building #180, 52 nd Ave. Gate House - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 1.5 Squares 4/12/201310

Building #170, Main Foyer West Side Pumping Station - SWRP Project Area New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 1 Square 4/12/201311

Building #170, Main Foyer West Side Pumping Station - SWRP 4/12/201312

Building #21, Ejector Station D-1 - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 1.5 Squares 4/12/201313

Building #21, Ejector Station D-1 - SWRP 4/12/201314

Building #150, Imhoff Battery B West Valve House - SWRP 4/12/201315

Building #150, Imhoff Battery B West Valve House - SWRP New System: Three (3) Ply Temporary Roofing System with River Washed Aggregate Estimated 19 Squares 4/12/201316

Building 152, Imhoff Battery B East Valve House - SWRP 4/12/201317

Building 152, Imhoff Battery B East Valve House - SWRP New System: Three (3) Ply Temporary Roofing System with River Washed Aggregate Estimated 19 Squares 4/12/201318

Building #60, Effluent Disinfection Storage Bldg. - SWRP 4/12/201319

Building #60, Effluent Disinfection Storage Bldg. -SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 6 Squares 4/12/201320

Building #87, Scum Concentration - SWRP 4/12/201321

Building #87, Scum Concentration - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 43 Squares 4/12/ Lower RoofUpper Roof

Building #87, Scum Concentration - SWRP 4/12/201323

Building #9027, Racine Avenue Pumping Station Total Square Footage is Estimated at 330 Squares 4/12/ Northern Roof Penthouse Coarse Screen Addition

Building #9027, Racine Avenue Pumping Station New System: Northern Half of Bldg. will receive the Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with a White, Reflective Energy Star rated Aggregate Surface 4/12/201325

Building #9027, Racine Avenue Pumping Station New System: The Penthouse will receive the Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with a White, Reflective Energy Star rated Aggregate Surface 4/12/201326

Building #9027, Racine Avenue Pumping Station New System: The Coarse Screen Addition will receive the Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with an Extensive Vegetative Roofing System incorporated on Top of the Overall Roofing Structure 4/12/201327

Roof Replacements and Associated Tuckpointing at SWRP & LASMA Contract # Note: The Metropolitan Water Reclamation District will not be responsible for any errors, omissions, or absence of any details within this presentation. The Contractor is responsible for thoroughly reviewing the entire contract package. The Contractor shall verify all dimensions, locations of work, conditions and other information specified herein, and be responsible for field verifying all the work required, and for the accuracy of all such information related to the work.