Presentation to the Washington State Association of County Engineers November 11, 2010 Washington State Association of County Engineers.

Slides:



Advertisements
Similar presentations
Property Tax Relief and Reform: Plan Overview Joint Select Committee on Property Tax Relief and Reform June 11, 2007.
Advertisements

Advanced Piloting Cruise Plot.
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Jeopardy General Compare & Order AdditionSubtraction Vocabulary Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
CALENDAR.
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
Year 6 mental test 10 second questions
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
Who Wants To Be A Millionaire?
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Class Name Instructor Name Date, Semester Foundations of Cost Control Daniel Traster Labor Management and Control chapter 11.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1 Town of Colchester FY 12 Budget. 2 Current Financial Challenges Vermont and the nation are coming out of a recession Expenses rarely go down.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
Before Between After.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
Solanco School District Preliminary Budget April 28, 2014.
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
County Transportation Overview
Presentation transcript:

Presentation to the Washington State Association of County Engineers November 11, 2010 Washington State Association of County Engineers

What is the gap between current resources and what is needed to meet goals? What are the priorities for funding? What are the options for funding? 2

3 Mileage% of Total Northeast17, % Northwest4, % Puget Sound4, % Southeast7, % Southwest5, % Grand Total39, %

4

5

6

7

8

9

10

11

county bridges (>20 ft.) 8.2 million square feet of surface area $5.9 billion replacement cost $3.9 million annual maintenance cost $118.4 million annual replacement cost

Four counties operate ferries: Pierce Skagit Wahkiakum Whatcom The Wahkiakum & Whatcom ferries are nearly 50 years old and are being considered for replacement. County Ferry System Four Washington counties own and operate ferries as part of their local transportation network. Pierce County RouteSteilacoom to Anderson and Ketron Island. FerriesM/V Christine Anderson (1994) M/V Steilacoom II (2006) Value$39,730,600 Skagit County RouteAnacortes to Guemes Island FerryM/V Guemes (1979) Value$13,877,394 Wahkiakum County RoutePuget Island to Westport, OR FerryM/V Wahkiakum (1962) Value$5,590,000 Whatcom County RouteGooseberry Point to Lummi Island FerryM/V Whatcom Chief (1962) Value$19,868,000 Ferry data from 2008 CRAB ferry report (data from 2007) 13

Annual Replacement Need CountyTotal Pierce $ 1,589,224 Skagit $ 555,096 Wahkiakum $ 223,600 Whatcom $ 794,720 Grand Total $ 3,162,640 Ferry Annual Oper. & Maint. CountyTotal Pierce $ 3,417,576 Skagit $ 1,639,558 Wahkiakum $ 698,392 Whatcom $ 2,144,707 Grand Total $ 7,900,233 Ferry data from 2008 CRAB ferry report (data from 2007) Annual operation maintenance is based on historical costs and values. Actual costs for replacement of ferry infrastructure can only be determined after thorough evaluation. 14

15

Removal of fish passage barriers is a significant environmental cost liability to counties. Recent projects by counties have project costs ranging from under $100,000 to over $500,

17

The majority of county road revenue comes from local property taxes and state shared gas tax. 18

Counties spent nearly $900 million for road maintenance and construction (preservation) in Road maintenance expenditures declined by 2% from 2007 to

20

21

22 Levy rates dropped on average from $1.852 to $1.316 per $1,000 A.V. Requires voter approval

23 Relatively little income potential Dependent on development activity Can only be used for capacity projects

24 Once established, district develops plan Allows district to include maintenance and preservation of transportation facilities

25 Funding options include Sales and Use Tax (up to 0.2 cents) Vehicle fee (up to $100, $20 councilmanic Commercial building fees Tolls $54 million potential statewide for counties at $20 councilmanic license fee

26 Up to 10% of state motor vehicle tax – 3.75 cents maximum Requires voter approval Distribution weighted 1.5 to 1.0 for county and city population $58 million potential revenue for counties

27 Voter approval not required Allows up to 75 cents/$1,000 except for King County limited to 7.5 cents/$1,000

28 Shared MVFT by formula 4.92 cents - $138 million $31 million per one cent of MVFT County Arterial Preservation Program 0.45 cents - $14 million per year Allocated by formula

29 Rural Arterial Program 0.58 cents - $18 million per year competitively distributed for projects Transportation Improvement Board 3.04 cents - $200 million per biennium competitively distributed for projects county grants average $20 million per year

30 Need is approximately $400 million per year Equivalent to current road tax levy Equivalent to 13 cents of MVFT How much should state be expected to help out? Prior to 2003 state shared 48% of MVFT to counties and cities Now city/county share is approx. 32%

31 Recommendations: Add 2 cents ($62 million) to 4.92 cents allocation Add 1 cent ($31million) to.45 cent for CAPP Add 2 cents to.58 cent for RAP Add urban arterials and some access roads (truck routes, high volume) Add 1 cent for new bridge replacement program and fish passage barriers Total = $186 million per year.

Gary Rowe, P.E., Managing Director Washington State Association of County Engineers (360) Washington State Association of County Engineers 32