IMT-Advanced Opening Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0647r1 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Advertisements

Doc.: IEEE /0647r0 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1429r0 Submission November 2008 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)Slide 1 IMT-Advanced Closing Report Date:
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Doc.: IEEE Submission March 2008 Michael Lynch, Nortel Networks Update on ITU-R and IMT-Advanced At the November meeting IEEE 802:
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
Doc.: IEEE /0752r0 Submission July 2008 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)Slide 1 IMT-Advanced Opening Report Date: Authors:
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: IEEE /0023r0 Submission January 2008 Bruce Kraemer (Marvell); Darwin Engwer(Nortel)Slide 1 IMT-Advanced Opening Report Date:
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
Doc.: IEEE /0752r0 Submission July 2008 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)Slide 1 IMT-Advanced Opening Report Date: Authors:
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Closing Report Report of the July 2009 plenary.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Doc.: IEEE /0172r0 Submission January 2008 Bruce Kraemer (Marvell); Darwin Engwer(Nortel)Slide 1 IMT-Advanced Opening Report Date:
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Doc.: IEEE /0506r0 Submission January 2007 Bruce Kraemer, MarvellSlide 1 IMT-Advanced Report Tech Requirements Outline Date: Authors:
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
P802.11s report to EC on request for approval to proceed to RevCom
IMT-Advanced Opening Report
IMT-2020 Contribution Content
ETSI Liaison Request November 08
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IMT-Advanced Report Tech Requirements Outline
IMT-Advanced Opening Report
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
IMT-Advanced Opening Report
IMT-Advanced Report Tech Requirements Outline
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
IMT-Advanced – Numerical Justification
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IMT-Advanced Opening Report
IEEE 802 IMT-Advanced Technology Proposal Process
IMT-Advanced Closing Report
IMT-Advanced Closing Report
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
ETSI Liaison Requests November 08
IEEE 802 IMT-Advanced Technology Proposal Process
TGn Closing Report Los Angeles, CA, US 802 Interim
IMT-Advanced Overview - March 2007
IEEE IMT-Advanced Review Process
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Candidate Introduction Bruce Kraemer Orlando 802 Plenary –17 Mar ‘08
RR-TAG Closing Report Report of September 2008 plenary meeting
TGn Closing Report Vancouver, BC, Canada 802 Plenary
IMT-Advanced Status Report
IMT-Advanced Closing Report - March 2007
November 2010, Motions for the EC
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
Activities of ARIB on IMT Standards
IMT-Advanced Overview - March 2007
GSC IMT Task Force Report
IMT-Advanced Closing Report
Candidate Introduction Bruce Kraemer Orlando 802 Plenary –17 Mar ‘08
RR-TAG Liaison Report July 2008 IEEE
WBA Carrier Wi-Fi Liaison request - March 2014
TTA Activities on IMT-Advanced standardization
WG16 IMT Workshop Suggestion
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

IMT-Advanced Opening Report March 2008 doc.: IEEE 802.11-07/0426r0 March 2008 IMT-Advanced Opening Report Date: 2008-03-17 Authors: Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 bkraemer@ marvell .com Darwin Engwer Nortel Networks 4655 Great America Pkwy, Santa Clara CA 95054 408 495 2588 dengwer@nortel.com Bruce Kraemer (Marvell); Darwin Engwer(Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

Primary Meeting Document March 2008 Primary Meeting Document Opening Report 11-08-0308 r0 Technical numbers 11-08-0411 r0 Closing Report 11-08-0426 r0 Minutes 11-08-0430 r0 WG18 progress plan http://ieee802.org/18/Meeting_documents/2008_Mar/80218ContribKraemerMarks.pdf Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

WP5D Geneva March 2008 Jan 28 – Feb 01 2008 About 250 delegates attended Over 100 documents discussed WP5D chair’s report http://www.itu.int/md/R07-WP5D-C-0097/en List of documents issued http://www.itu.int/md/R07-WP5D-C-0090/en List of attendees http://www.itu.int/md/R07-WP5D-C-0096/en Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

IMT-Advanced Circular letter March 2008 IMT-Advanced Circular letter The circular letter requesting candidate radio interface technology proposals for the terrestrial component of IMT-Advanced has been issued by ITU-R and it is publicly available here: http://www.itu.int/md/R00-SG05-CIR-0002/en There is also an associated web page. http://www.itu.int/ITU-R/index.asp?category=study-groups&rlink=rsg5-imt-advanced&lang=en Not all the information has been posted yet and there will be forthcoming addenda to the circular letter, in particular to provide the radio interface requirements and the evaluation guidelines, after July 2008. The deadline for the proposals has not been confirmed yet, but it is expected to be around October 2009. Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

March 2008 Circular Letter 5/LCCE/2 7 March 2008 Subject: Invitation for submission of proposals for candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-Advanced and invitation to participate in their subsequent evaluation 1 Introduction ITU-R has commenced the process of developing ITU-R Recommendations for the terrestrial components of the IMT-Advanced radio interface(s). This work is guided by Resolution ITU-R 57 (see Attachment 1). Resolution ITU-R 57 on the “Principles for the process of development of IMT‑Advanced” outlines the essential criteria and principles which will be used in the process of developing the Recommendations and Reports for IMT-Advanced, including Recommendation(s) for the radio interface specification. 2 Purpose of this Circular Letter The purpose of this Circular Letter is to invite the submission of proposals for candidate radio interface technologies (RITs) or a set of RITs (SRITs) for the terrestrial components of IMT‑Advanced. This Circular Letter also initiates an ongoing process to evaluate the candidate RITs or SRITs for IMT‑Advanced, and invites the formation of independent evaluation groups and the subsequent submission of evaluation reports on these candidate RITs or SRITs. Within the ITU-R, the work on IMT-Advanced will be conducted in ITU Radiocommunication Study Group 5 (SG 5). While the final structure of SG 5 has yet to be finalized, as an interim measure, Working Party 5D (WP 5D) of SG 5 has been identified as the group responsible for this work. Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

Liaison Contributions from WG 16 reviewed by WG 11 March 2008 Liaison Contributions from WG 16 reviewed by WG 11 L80216-08_011d0.doc (size: 180.7 KB last modified: 2008-03-18 ) This contribution proposes changes in Sections 5 and 6 of the ITU-R/IMT-Advanced/IMT.TECH document, as presented in Document 5D/TEMP/28.| José M. Costa, ITU-R Liaison Official| L80216-08_010d0.doc (size: 192.5 KB last modified: 2008-03-18 ) This contribution proposes changes in Section 4 of the ITU-R/IMT-Advanced/IMT.TECH document, as presented in Document 5D/TEMP/28.| Jose M. Costa, ITU-R Liaison Official| Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

Example of specifications to be completed March 2008 Example of specifications to be completed Cell Spectral Efficiency Test environment Downlink (b/s/Hz/cell) Uplink (b/s/Hz/cell) [Case 1, see note 2] [Case 2, see note 2] Indoor 3 [2.5] [1.5] Microcellular 2.6 [2] [1.3] Base coverage urban 2.1 [1.2] High speed 1 [0.7] [0.6] Numbers in square brackets [x] have not been agreed upon Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

Example of specifications to be completed March 2008 Example of specifications to be completed Cell Edge Efficiency Test environment* * Downlink (b/s/Hz) Uplink (b/s/Hz) Indoor [0.1] [0.08] Microcellular [0.075] [0.05] Base coverage urban [0.06] [0.03] High speed [0.02] Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

IMT AHC Goals – March thru May Bi weekly conference calls between March Plenary & May Interim Target is 2 slots for IMT discussions in May Goal is to complete technical submissions in defense of IEEE Requirement & Evaluation criteria for use in June ITU-R meetings We need to determine who has an interest in proceeding with a joint IEEE 802 input to WP5D on IMT-Advanced technologies. That work should be completed at the November meeting. The window in WP5D opens at their January/February meeting rather than the last meeting in 2008. Of course the window is three meetings so we can improve (and socialize) a IEEE 802 input. Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

March 2008 Next Steps Correspondence groups are being established to try and reach agreement on numbers prior to the Dubai meeting. IEEE 802 will continue to participate. IEEE needs to organize more formal defense of proposals and organize attendees/presenters for the June WP5D meeting Bruce Kraemer (Marvell); Darwin Engwer(Nortel)