Pilot River Basin Water Framework Directive.

Slides:



Advertisements
Similar presentations
DG Environment Pilot River Basin Conclusion of the phase 1 Outcome Report on phase 1b.
Advertisements

The French National Agency on Water and Aquatic Environments
DG Environment, Unit D.2 Marine Environment and Water Industry
Pilot River Basin Network: Environment Directorate
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
WG B Progress report Water Directors meeting Mondorf May 20 and 21
New Work Programme and mandates 2005/2006
Marine Strategy Framework Directive (MSFD)
DG Environment, Unit D.2 Marine Environment and Water Industry
Project Objectives, Workplan and Timescales
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
Horizontal Guidance on Wetlands
WFD and Hydromorphology - 4/5 June 2007, Berlin, Germany -
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
JRC-Institute for Environment and Sustainability
Activity on WFD and Agriculture
Progress report ATG Hymo 1 May – 20 October 2016
WG 2.9 Best Practices in River Basin Planning
Pilot River Basin Outcome Report of Phase 1b.
Horizontal Guidance on Wetlands Rome, 12nd June
Outcome and Perspectives Pilot River Basin Workshop
DG ENV/MSFD 2018 call for proposals
Marine Strategy Framework Directive (MSFD)
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Commission report on Art. 8 WFD Monitoring programmes
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
NATURA 2000 and Water Framework Directive (CIS )
Horizontal Guidance on Wetlands
Information on projects
Outcome of 2^ Seminar of the WG 2.7 Roma, January
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
on a protocol for Intercalibration of Surface Water
Project 2.7 Guidance on Monitoring
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
WG 2.B Integrated River Basin Management
Water Scarcity Drafting Group (DG) Strategic Coordination Group meeting Brussels, May 19th 2005 Progress Report 1 Dicembre 2004.
1st Implementation Report of the Water Framework Directive
Research as a new activity of the CIS WG 2B
DROUGHT MANAGEMENT PLANS IN SPAIN Drought indicators Rome, 7 Dicember 2006 Teodoro Estrela Deputy Water Director Spanish Ministry of Environment.
WG 2.B Integrated River Basin Management
Green Paper on Adaptation and
DG Environment, Unit D.2 Marine Environment and Water Industry
WG C – Groundwater Activity WGC-3 Risk Assessment (RA) and
Fitness Check EU Water Policy
Pilot River Basin exercise.
Strong needs for coordination at EU level
EU Water Framework Directive
WFD and Agriculture Activity under the CIS 2005/2006 Work Programme
Activity on WFD and Agriculture
Integrated Testing in Pilot River Basins
Common Implementation Strategy for the Water Framework Directive
Update WG Eflows activity and link with EcoStat
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
Preparation of the second RBMP in Romania
WG Integrated Testing in Pilot River Basins
Status of the Nutrient Best Practice Guide
EIONET and EUROWATERNET Common Implementation Strategy
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Concept paper on the assessment of WFD River Basin Management Plans
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Brussels – 20 April 2007 European Commission - DG Environment
WG A Ecological Status Progress report October 2010 – May 2011
Assessment of Member States‘ 2nd River Basin Management Plans
Horizontal Guidance on Wetlands Brussels, 5th May
Presentation transcript:

Pilot River Basin Water Framework Directive

PRBs are representative for the situation across Europe: PRB: Introduction. 15 Pilot River Basins (PRBs). 18 countries have volunteered to gain practical experiences in the implementation process on the basis of the GDs which were developed in the context of the CIS for the WFD. PRBs are representative for the situation across Europe: wide geographical distribution, several transboundary basins, variety of pressures and impacts, different level of data availability and starting points for the implementation, different selection of guidance documents to be tested.

Purpose of the 1st PRB Outcome Report related to Art. 5 Obligations. PRB: Purpose. Purpose of the 1st PRB Outcome Report related to Art. 5 Obligations. report aims to focus on and key issues to be felt of particular relevance by PRBs during the testing, to inform on whether the interlinkages among GDs are sufficiently developed, to inform on whether some issues might require special attention for the suitable implementation of the WFD.

Identification of pressures PRB: considered areas and addressed to. This phase of the testing has basically considered the following areas: Characterization of surface waters and groundwater (delineation, reference conditions and provisional objectives) Identification of pressures Impact of human activity on the status of surface waters and groundwater (assessment of likelihood failing environmental objectives achievement) Economic analysis of water uses The Report is addressed to: Water Directors - River basin authorities - Regional and local managers It summarizes experience, comments and recommendations that might be useful when planning and facing the implementation of the WFD.

PRB: Significant Findings and conclusions. In general, PRBs involved in the testing consider the experience of high value and benefits for many reasons: A suitable implementation of the Art.5 WFD can be done with existing data although further efforts on improving quality and quantity of data is needed, They have reported on future difficulties and highlight recommendations which might facilitate the work of other river basins, PRB are getting ownership of the implementation process and taking lead together with other river basins, PRB are willing to disseminate its results in order to spread out the knowledge acquired, GDs have been used satisfactorily and were generally seen as efficient and helpful tools. Short fact sheets on national approaches and joint seminars are best preferred instead of additional guidance documents.

Strengthen regional monitoring and the development of modelling tools, PRB: Significant Findings and conclusions. Utilizable methodology in the WFD, but demanding of data and resources, Strengthen regional monitoring and the development of modelling tools, Results show that wastewater loading must be reduced further if WBs to meet the quality objectives, Transboundary coordination has been problematic at first stages. Harmonized approaches is crucial, This co-operation may have developed and supported at early stage to as to prevent further development of differing methodologies, Active public involvement was not developed in most of the PRBs. Most of them consider the Article 5 characterization as purely technical. Benefits from public involvement need to be considered during phase 1b and 2 of the exercise.

PRB: Recommendations. Continuation of the process and dissemination of results are considered as crucial, first results stress the need to establish strong links with other CIS groups -WG 2A, WG 2C and WG 2D, Adequate human and financial resources needs to be allocated to develop relevant cause effect relationships, governing pressures, impacts and responses, the involvement of other river basins (e.g. Danube, Rhine, Meuse, Oder, etc;) in the future PRB activities deserves consideration. Stakeholders involvement should be tackled during the real implementation of Art.5. Public participation has to be a component for the continuation of the PRB exercise.

PRB raised their interest in the continuation. PRB: Recommendations. Risk analysis is based on provisional objectives for the WBs. Objectives/analysis ought to be revised and improved after 2005 to optimise monitoring programmes and the programme of measures, The Article 5 economic analysis shall serve as the basis for assessing the economic aspects of the future programme of measures, PRB experience might be used as reporting experience so as to share knowledge and practices. PRB reporting may also flag future uncertainties and issues that deserve special attention when planning programmes of measures and river basin management plans, PRB raised their interest in the continuation.

PRB: Timetable. TIMETABLE: Phase1b. 1) PRBs return Terms of References for the GDs that were not tested in phase 1a Deadline 31 May 2004. 2) Issue 1st draft of 1b Report Deadline June 2004. 3) Self-explanatory examples (case studies) to be sent to JRC 4) Issue Pre-Final version of 1b Report Deadline 12 October 2004. 5) SCG Meeting - 26-27 October 2004. 6) Integrate SCG comments Deadline 10 November 2004. 7) Water Directors Meeting - 2-3 December 2004.

1) PRB Leaders Meeting - Brussels 30 June 2004. PRB: Meetings and Workshops. PRBs Meetings: 1) PRB Leaders Meeting - Brussels 30 June 2004. 2) PRB Workshop - September 2004. 3) PRB Conference - Brussels date to be confirmed. PRBs Workshop: 1) IMPRESS Workshop - GE/UK (to be confirmed) 16-18 June 2004. 2) Workshop on Mediterranean Issues - Italy June /July 2004. 3) Workshop on Wetlands - Venice (Italy) Sept / Oct 2004. 4) HMWB Workshop - GE/UK (to be confirmed) First half 2005. 5) Workshop on Agricultural Pressures - Denmark First half 2005.