Chicago Department of Water Management

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
5.1 Rules for Exponents Review of Bases and Exponents Zero Exponents
PDAs Accept Context-Free Languages
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
David Burdett May 11, 2004 Package Binding for WS CDL.
1 When you see… Find the zeros You think…. 2 To find the zeros...
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
Learning to show the remainder
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Operating Plans and Rates
Water Distribution Systems – Part 1
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sprayer Economics Gary Schnitkey University of Illinois.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Select a time to count down from the clock above
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Presentation transcript:

Chicago Department of Water Management Hacia April 9, 2014 Thomas H. Powers, P.E. Commissioner

Water System Overview Drinking water treatment Background Drinking water treatment Water Quality (Microbiology, Chemistry, & Microscopy), Water Treatment Water distribution system maintenance Water Pumping, Operations & Distribution, Engineering Combined sewer system maintenance Operations & Distribution, Engineering Metropolitan Water Reclamation District of Greater Chicago treats wastewater First, let me provide you with a little background about our department. After merging the water department and sewer department in 2003, we became not only responsible for the treatment and distribution of the drinking water, but also the transmission of waste water to the Metropolitan Water Reclamation District. 2

Chicago Water System Overview Protecting public health & safety 2 Lake Intake Structures 2 Water Purification Plants Jardine: 1.4 BGD rated capacity South: 720 MGD rated capacity 12 Water Pumping Stations 8 Electric, 4 Steam No elevated storage 4,349 Miles of Dist. Mains 48,243 Fire Hydrants > 600 miles of transmission mains Ranging in size from 16-inch to 78-inch diameter

Population Served by DWM Total Population of IL 12.83M Water Supply Area Suburban Consumers City & Suburban 2010 Population Served by DWM Total Population of IL 12.83M City (Water & Sewer) 2.70M 21% of IL Suburban (Water) 2.67M Total (Water) 5.37M 42% of IL 42.5% 42% of Ill.

Sewer System Overview Combined Sewer System North Side WRP Stickney WRP Calumet WRP Combined Sewer System 188 square miles of drainage area 4,600 miles of sewer 250,000 catch basins 125,000 manholes 200 Combined Sewer Overflows (CSOs) Sewer diameters 8-inches to 21.5-feet

Sewer Rate (as a % of water) 2012-2015 Rate Increase January 1 Water Rate Increase Sewer Rate (as a % of water) Avg. Total Annual Bill Annual Increase Daily Increase Cost Per 1,000 Gallons Cost Per Shower 2012 25% 89% $431.30 $91.70 $0.30 $2.51 $0.13 2013 15% 92% $503.80 $72.60 $0.20 $2.88 $0.14 2014 96% $591.40 $87.90 $3.31 $0.17 2015 100% $694.10 $102.60 $3.81 $0.19 Cost per shower = $0.13 in 2012 $0.19 in 2015

Projected Water CIP Spending Bond Proceeds Pay-go Funds IEPA Funds Projected Bond Proceeds Projected Pay-go Funds Projected IEPA Funds 7

Projected Sewer CIP Spending Bond Proceeds Pay-go Funds IEPA Funds Projected Bond Proceeds Projected Pay-go Funds Projected IEPA Funds 8

2013 & 2014 DWM CIP Distribution System 2011 Completed 2012 2013 Completed 2014 Targets Water Mains Replacement 30 Miles 70 Miles 75 Miles 85 Miles In-House Crews 18 (60%) 30 (42%) 30 (40%) 35 (41%) Contractor * 12 (40%) 40 (58%) 45 (60%) 50 (59%) Sewer Mains Replacement 9 Miles 17 Miles 21 Miles 7 (75%) 10 (60%) 12 (57%) Contractor 2 (25%) 7 (40%) 9 (43%) Sewer Lining (Contractor)* 40 miles 47 Miles 49 Miles 55 Structure Lining (Contractor) 14,000 Install Meters* 8,000 12,000 15,000 * Funded in part by IEPA SRF

2011 Water & Sewer Capital Program 2011 CIP Program Water Main Replacement = 30 Miles Sewer Main Replacement = 9 Miles Sewer Lining = 40 Miles Sewer Structure Rehabilitation = 8,000 Water Meter Installations = 8,078 2011 Capital Expenditures*: $225.5M 2011 Operating Expenditures: 702.4M Budget less paygo 10 *Expenditures include Facility Capital Improvements

2011-12 Water & Sewer Capital Program Water Main Replacement = 70 Miles Sewer Main Replacement = 17 Miles Sewer Lining = 47 Miles Sewer Structure Rehabilitation = 14,000 Water Meter Installations = 12,160 2012 Capital Expenditures*: $422.1M 2012 Operating Expenditures: 748.4M 11 *Expenditures include Facility Capital Improvements

2011-13 Water & Sewer Capital Program Water Main Replacement = 75 Miles Sewer Main Replacement = 17 Miles Sewer Lining = 49 Miles Sewer Structure Rehabilitation = 14,000 Water Meter Installations =16,393 2013 Capital Expenditures*: $542M 2013 Operating Expenditures: 784M 12 *Expenditures include Facility Capital Improvements

2011–14 Operating Expenditures 2011-14 Water & Sewer Capital Program 2014 Program - GOALS Water Main Replacement = 85 Miles Sewer Main Replacement = 21 Miles Sewer Lining = 55 Miles Sewer Structure Rehabilitation = 15,000 Water Meter Installations = 15,000 2014 Capital Expenditures*: $671M 2014 Operating Expenditures: 817M 2011–14 Capital Expenditures $1.86B 2011–14 Operating Expenditures $3.1B 13 *Expenditures include Facility Capital Improvements

DWM CIP -Distribution System Contracts in Place 7 water main installation 3-year term contracts w/2 optional extensions Smaller contracts to increase participation 3 city-wide sewer main installation contracts 7 location-specific sewer main installation contracts 5 city-wide lining contracts 3 structure lining contracts 14

DWM CIP – Water Engineering Contracts New T.A.s will be Solicited in early 2015. Current include: 17 T.A. with consulting engineering/architectural firms for design engineering services 11 T.A. with consulting engineering/architectural firms for C.M. services Existing Contracts Include: 11 T.A. for topographic survey & base map production 1 T.A. consulting engineering for specialized structural engineering services 1 program management contract 1 hydraulic engineering contract 15

DWM CIP – Sewer Engineering Contracts New T.A.s will be Solicited in early-2015. Current include: 12 T.A. with consulting engineering/architectural firms for design engineering services 10 T.A. with consulting engineering/architectural firms for C.M. services Existing Contracts Include: 2 sewer hydraulic modeling contract 16

DWM CIP – Facility Projects 17

Facility Improvements Jardine Water Purification Plant 10-acre E. Filter Building Roof Replacement 6 of 8-Phase Project completed Construct temporary scaffolding – to maintain uninterrupted water treatment Remove & install new concrete panels & roof membrane Lead abatement Remove & replace select damaged steel beams & columns Paint steel Cost for design & construction $37.5M Est. complete July 2014 18

Facility Improvements Springfield Pumping Station Conversion Replace existing steam turbines on 5 pumps with electric motors Construct LEED certified building & ComEd Vault to house new electrical equipment & control room Construct green roof Install solar panels 2of 5 pumps has been converted 3rd pump has been refurbished & installed on a new base 19

Facility Improvements Springfield Pumping Station Conversion, Con’t Cost for design and construction is $73M Estimated energy, maintenance & personnel savings $4.5M annually Estimated complete July 2015 New Discharge Valve Operator for Pump 3 New LEED certified building & ComEd Vault housing new electrical equipment & control room 20

Facility Improvements SWPP Switchgear & Generator Replacement Replace of existing 1940’s era Medium Voltage Switchgear throughout the South Water Purification Plant Replace temporary standby generators & install permanent generators $44.7 Bid Construction Bid (in award process) Construction Start: 2014 3+ year Project 21

Facility Improvements SWPP Filter Control System Replacement (120 filters) Design started in 2013 – 60% submitted & reviewed in March 2014 Replace 1980’s-era Filter Backwash Control System with a new PLC Digital Filter Backwash Control System. Plan to advertise for bid in 4th Quarter 2014 $20M Est. Cost 22

Facility Improvements Central Park Pumping Station Electrification (Upgrade electrical motors & variable frequency drives) Design Project recently awarded Scope & Fee for 1st phase includes: Evaluation of alternatives for electrical & variable frequency drive improvements Establishment of design requirements including geotechnical, architectural, structural requirements, hazardous material removal, and others $80M Construction Estimate Construction Start 2015 or 2016 23

Summary Water 2012-2021 880 miles - water mains 10 Year Goal: Back on Original Installation Pace Water 2012-2021 880 miles - water mains 4 designs - pump stations 3 conversions – pump stations > 200,000 install meters Sewer 2012-2021 244 miles - sewer mains 455 miles – sewer lining 140,000 structure lining 24

Questions