DOTD Form 24-102 September 4, 2014.

Slides:



Advertisements
Similar presentations
AS PER FLORIDA STATUTE (1B (10))ALL LOCATIONS MUST ENSURE THAT DESTRUCTION OF RECORDS IS CONDUCTED IN A MANNER THAT SAFEGUARDS THE INTERESTS OF THE.
Advertisements

Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Electronic Official Personnel Folder (e-OPF) for Federal Employees 2014.
Grant Management Webinar Presenters – Karla Freeman – Beth Romero – Chris Epoca.
Data Validation Documentation for Enrollments. Learning Objectives As a result of this training you will be able to: Describe the data validation process.
Welcome to the 2015 Prevailing Wage Survey Tutorial This tutorial will assist you in the process of completing Survey Forms. If you still have questions.
For: Current Certified Third Party Agencies Developed By: Florida Department of Community affairs Date: January 14,
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
The BIM Project Execution Planning Procedure
TIME AND EFFORT REPORTING: THE BASICS Steven Spillan, Esq. Brustein & Manasevit, PLLC Fall Forum 2013.
A Guide to the BIZNET Online Filing System STATE OF CONNECTICUT DEPARTMENT OF CHILDREN & FAMILIES (DCF) DEPARTMENT OF DEVELOPMENTAL SERVICES (DDS) DEPARTMENT.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Welcome to Managing the Finances of Your NHPRC Grant 1.
1 INITIAL SETUP OF THE ST ScI ELECTRONIC GRANTS MANAGEMENT SYSTEM BY AO DESIGNEES September, 2000.
2014 AIA San Diego Design Awards Submission Instructions Slide PowerPoint Template for the Foundation Categories Each project entry must submit a separate.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Networking the World TM IEEE: Networking the World.
How to Submit An Amendment Tips from the 21 st CCLC Unit Updated September 17, 2009.
WELCOME to the QSNY Portal Public School Self-Study 1.
State of Connecticut Consultant Selection Office 2015 Consultant Prequalification Process Presented by the Connecticut Department of Transportation (CT.
Online Bid Submission in Bid4Michigan Screen Walk Tutorial Compiled by Christine Mitchell 1/4/2011.
Request For Qualifications (RFQ) Missouri Local Programs How to Complete the RFQ & Get it Advertised.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
1 Test Operations Contract RFP Volume III ITO Briefing RFP NNS09ZDA008R – TEST OPERATIONS CONTRACT (TOC) Ground rules This presentation is intended to.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
Annual Governance Reporting Brandon Spenrath | TEA | Charter School Administration.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
How to CORRECTLY Complete a TEASE Access Request Form.
Understanding Caltrans Request For Qualifications Process 1.
7 Day Self Assessment Tool (7 Day SAT) March 2016 Survey - User Guide v4 (March 2016)
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Employee Self Service (ESS) Version Employee Self Service  access from any computer.  view their elected withholding, earnings summary, check.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Employee Self Service (ESS) Version 2.15.
Contract Compliance Training
Submitting a Responsive Proposal
Invoicing 2016 E-rate Program Applicant Training
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Tulare County Youth Commission
Annual Performance Management Cycle Management Training Tutorial
Using the Oregon POLST Registry
Service description This opportunity is to deliver a Lunch Club Support Service. Newcastle City Council is committed to providing services for older people.
Contract Compliance Training
State Aid Construction
Employee Self Service (ESS) Version 2.20.
Navigating Procureware
Budget Realignments and Budget Amendments
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
GMAS Preproposal Entry
Red Flags Rule An Introduction County College of Morris
Effort Certification and Cost Sharing
New NIH Human Subjects & Clinical Trials Information
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Employee Self Service (ESS) Version
BCSD Federal Time -accounting Guidelines & procedures
FY18 Water Use Data and Research Program Q & A Session
Hands-On: FSA Assessments For Foreign Schools
BCSD Federal Time -accounting Guidelines & procedures
Omnibus IV Contracting Strategy Michael D’Alessandro
PROPOSED CHANGES TO RATING METHODS
State Aid Construction
Overview of The Bidder Response Form and Changes to the IT RFP Template March 8, 2019.
Diversity management system (DMS)
HMPPS Innovation Grant Programme (2020 – 2022)
Office of State Procurement How to Do Business with the
Presentation transcript:

DOTD Form 24-102 September 4, 2014

Introduction of Consultant Contracts Staff Alan Dale, P.E., DOTD Consultant Contracts Services Administrator, (alan.dale@la.gov), 225-379-1401 Kathy Ward, DOTD Contracts Manager, (kathy.ward@la.gov), 225-379-1893 Heather Huval, DOTD Advertisement Specialist, (heather.huval@la.gov), 225-379-1733

Location of form on DOTD’s Web Site http://webmail.dotd.louisiana.gov/ContWeb.nsf/b887693264 53bef886256fe00047183a/1aa5d63f8b9610b786256b9d0050 a76e?OpenDocument

New Submittal Requirement (USB Drive) One original (stamped “original”) and five copies of the DOTD Form 24‑102 must be submitted to DOTD along with an electronic copy (USB flash drive only) in a searchable Portable Document Format (pdf). If you wish to have your flash drive returned, please include a postage paid, self-addressed envelope.

DOTD Form 24-102 Sections 1) Project Title/Location 2) Announcement Date/Contract Number 3a) Firm As registered with the Secretary of State DBA for sole proprietorships which bear the full name of the owner 3b) Firm License Number License number as per LAPELS DUNNS number as per Sam.gov (new requirement) 3c) Mailing address of the office to perform work 4a) Name, title, telephone number, and e-mail address of the official with signing authority for this contract. 4b) Name, title, telephone number, and e-mail address of project point of contact.

DOTD Form 24-102 Sections (continued) 4c) Name, title, and telephone number of full-time LA Licensed Engineer or Surveyor in charge. 5a) Has the firm obtained a DOTD-approved audited overhead rate within the past five years? If no, do you have a cognizant agency overhead? 5b) Has the firm submitted the required current labor rates to DOTD’s Audit Section as described in Section 2.3 of the Consultant Contract Services Manual

DOTD Form 24-102 Sections (continued) 6) Full-time personnel on firm’s payroll 7) If one or more Sub-Consultants will be used, provide the information requested below List should match Sub-Consultants shown in 8b 8a) List the elements of work as defined in the advertisement, and an estimated percentage and detailed description of the work element(s) to be performed by the Prime-Consultant and each Sub-Consultant. 8b) Identify the percentage of work for the overall project to be performed by the Prime Consultant and each Sub-Consultant

DOTD Form 24-102 Sections (continued) 9a) Project Staffing Plan 9b) Identify full-time staff (prime/sub-consultant) designated to work on this project meeting the Minimum Personnel Requirements specified in the advertisement. 10) Provide short résumés for key project personnel in alphabetical order by last name 11) Firm’s most relevant project experience 12) Backlog - List any current prime or Sub-Consultant work being performed by all of your firm’s offices, either directly for or via selection by the DOTD.

DOTD Form 24-102 Sections (continued) 13) Provide any additional information or description of resources supporting your firm’s qualifications for the proposed project. 14) Signature of Official (same as 4a), certifying that all information contained herein is accurate and true, and that the firm presently has sufficient staff to perform these services within the designated time frame.

DOTD Form 24-102 The Sub-Consultants do have to fill out a completely separate submittal packet that is incorporated/bound firmly to the Prime Consultants submittal packet. While not a requirement, CCS is encouraging prime Consultant’s to add tabs at least between the prime and sub-consultants in the submitted 24-102 forms to aid the Project Evaluation Team.

DOTD Form 24-102 Common Issues 3a – Firm must be registered with the Louisiana Secretary of State (unless a sole proprietorship) http://www.sos.la.gov/BusinessServices/SearchForLouisianaBusinessFili ngs/Pages/default.aspx 5a and 5b – While a “no” answer will not be grounds for being deemed non-responsive, lack of this data will increase the time to execute a contract and may reduce the firm’s expected compensation 6 Full-time personnel –contract workers must be approved before submitting, Transportation Organization Charts reducing staff level to firm members that may work on DOTD projects must be approved before submitting. You can do this by emailing Mr. Alan Dale at Alan.Dale@la.gov

Personnel Domiciled The first column, All Personnel Domiciled in LA, is to include the number of full-time employees on the firm’s payroll who are domiciled in Louisiana. The second column, Project Specific Personnel NOT domiciled in LA, is to include the number of full-time employees on the firm’s payroll who are not domiciled in Louisiana but will potentially be assigned to perform work under the contract. Workers not located in the office shown in 3c may impact firm’s location used for evaluation purposes.

Transportation Organization Charts If the number of full-time transportation related employees domiciled in Louisiana is less that the total number of all full-time employees domiciled in Louisiana, the Consultant may submit an organizational chart to the Consultant Contract Services Section, Alan Dale confirming such. The organizational chart will be kept on file and should be regularly updated for appreciable changes in staff. Contract employees may be allowed for a period of time for a particular element or task on a project. Contract employees should be shown in Section 9a. Project Staffing Plan with resumes included in Section 10.

DOTD Form 24-102 Common Issues A Sub-Consultant shall not utilize another Sub-Consultant. Reporting of percent of total work by each team member should be reported in whole numbers only. Staffing Plan should be in the format of an organizational chart. Show ALL key personnel, prime and sub-consultants (if applicable), the work element each person is assigned to, and their specific duties. The chart shall be organized such that each person is traceable to their immediate supervisor for each work element. It shall also be made apparent in the chart the firm with which each person is associated.

DOTD Form 24-102 Common Issues Minimum Personnel Requirements table (9b) identify those staff members meeting the Minimum Personnel Requirements. The entries shall be in the order of the personnel requirements as presented in the advertisement. More than the minimum number of personnel can be listed, all will be evaluated and rated. This allows the firm to still be considered if a member is deemed not to satisfy the minimum requirements. No additions are allowed after the deadline date of the advertisement.

DOTD Form 24-102 Common Issues Resumes (Section 10) for the key project personnel are required. The resumes shall be in alphabetical order by last name. The resumes shall be a brief description of the experience and qualifications relevant to the proposed project. The role and responsibility should be made clear for each project shown in Section g. Include agency project numbers and dates of the work performance period. If personnel performed duties on projects listed in Section 11, this information provided should match information listed on their resume.

New Firms Federal Registration Link for Sam.gov (System for Award Management) https://www.sam.gov/portal/SAM/#1 Registration Link LAGOV: http://wwwprd.doa.louisiana.gov/osp/lapac/Vendor/VndPubMain.asp Registration Help Desk: (225) 342-6349 It is highly advisable to register a minimum of one if not more of the following product category codes    80101500 For Consulting/Professional Services    81112000 For any services that include Computer Elements    43231500 For Software License and Maintenance Agreements    81102200 For Engineering and Related Services    Instructions for Completing the DOTD Form 24-102 (Rev Nov. 2011) http://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef886256fe00047183a/1845db3c28f432b186256d4e00642de7?OpenDocument   LA DOTD Projected Advertisements http://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef886256fe00047183a/641e26ebc6ea299f86256ba400720d70?OpenDocument E-mail Alan Dale at Alan.Dale@la.gov your contract information so that your firm can be added to CCS database