…Where the sky is only… …The Beginning.

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Advertisements

Y A S O O B A L I b o r n o n 1 9 t h F e b r u a r y i n K a n p u r d i s t r i c t o f U t t a r P r a d e s h. H e s t a r t e d s i n g i.
RIT Senior Design Project D3 Engineering Camera Platform Friday November 6, :00am to 11:00am.
EDGE™ Preliminary Project Overview P09123 – MAV Platform Team Members: Joe Hozdic (Lead)Ming Chow Aaron NashBrian David Giovanni Sorrentino.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Project P09122: MAV Control System Erik Bellandi - ME Ben Wager - ME Garrett Argenna - ME Tahar Allag - EE Michael Pepen - EE Stephen Nichols - CE.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Final Project Plan P09123 – MAV Platform Structure Joe Hozdic (Mechanical Engineering)
RIT Micro Air Vehicle (MAV) Structural Design Project (P09121)
1 AE - Control and Simulation – Micro Air Vehicle laboratory Flying Robots : the MAV-lab - Delfly: 3g, 10 cm, camera - Guinness book of records - Autonomous.
Scanning apparatus. Final tune ups Repeatability: move in a given steps and see if we can get the same amounts. Calibration: mainly to convert any given.
Vehicle Tracking/Payload Release System For Small UAV Project Team
EDGE™ Project P09122: MAV Control System. EDGE™ MAV Controls Team Organization Project Manager Erik Bellandi ME Garrett Argenna EE Tahar Allag EE Michael.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
TEAM AR.DRONE Final presentation Ingredients AR drone Drone moving API -Compass -front Camera -bottom Camera.
13.8 Box and Whisker Plots. We previously learned how to calculate Median. This is our “center”. We can now use our strategy to create a “box and whisker.
Robot Project Overview. Objective: The goal of this activity is to build a robot that is capable of locating a 2 ft x 2 ft target and launching a ping.
Box 1Box 4Box 3Box 2 Box 5Box 8Box 7Box 6 My Shadow Box.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Lesson 1: Length.
What can we see in the sky?. IN THE SKY WE CAN SEE MUCH MORE!
RIT MAV System Review Dr. Jeffrey Kozak – Faculty Guide Michael Reeder – Team Leader Kevin Hand – Lead Engineer Todd Fernandez – ME Susan Bieck.
MAV Programme at CASDE Hemendra Arya Department of Aerospace Engineering Indian Institute of Technology Bombay
Quality Function Deployment (QFD) Getting from the voice of the customer to technical design specifications.
8.8 Improper Integrals Extra Practice Problems. Until now we have been finding integrals of continuous functions over closed intervals. Sometimes we can.
Mini Autonomous Flying Vehicle CASDE is part of the National effort to develop a Micro Air Vehicle. CASDE has chosen a Mini Vehicle, in the short term,
A 4.25 kg block of wood has a kinetic coefficient of friction of and a static of between it and the level floor. 0. Calculate the kinetic friction.
RIT MAV System Review (P08121) Dr. Jeffrey Kozak – Faculty Guide Michael Reeder – Team Leader Kevin Hand – Lead Engineer Todd Fernandez – ME.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Image from
The reading is 7.38 mm. The reading is 7.72 mm.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
SVP/GM Enterprise Business – Monster Worldwide
Balloon Payload Launch
Unit Commanders' Course
THE AREA OF A CIRCLE An introduction to approximating the area of a circle.
By your full names (2 people per group)
R09560 – Open Architecture, Open Source Aerial Imaging Systems
P08121: Micro Aerial Vehicle (MAV)
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Project METEOR [P08102 RITSAT I]
Factoring Expressions 7.EE.1
July 8-13th, 2018 July 8-13th, 2018 July 8-13th, 2018
July 8-13th, 2018 July 8-13th, 2018 July 8-13th, 2018
Lockheed Martin Challenge
MAV and UAV Research at Rochester Institute of Technology
Unit: Operations with Rational Numbers
Warm-Up Outside a room there are three light switches. One of the switches is connected to a light bulb inside the room. Each of the three switches can.
Improper Integrals 8.4 day one
Tolerances.
Non-local Means Filtering
Atomic Components 1) Nucleus 2) Electrons. Atomic Components 1) Nucleus 2) Electrons.
Nerf Launch Activity And you.
How To Think Creatively?
P07122: Autonomous Quadcopter
7.8 Improper Integrals.
Creating Space Technique Practice
1. Write all that you can about this image around the outside
Learning Target #21 Equations of Circles.
Improper Integrals 8.3 day one
Interesting Integers!.
Perimeter- is the distance around a figure.
Finding the hypotenuse
MATH 110 Differential Calculus
Length.
P18250 ‘Smart Buoy’ Phase 7 Customer Update
Optical Stage Redesign
Evaluate the integral {image}
Presentation transcript:

…Where the sky is only… …The Beginning. P08121: MAV 2008 …Where the sky is only… …The Beginning.

For 2007-2008 it’s… NEWER! BIGGER! BETTER!

From thinking inside the box…

…to living outside it.

The future of the MAV is here…

…emerging from its predecessor… 600 m flight distance Image capture of a 1.5 x 1.5 m target Returning was not an issue!!!

…and evolving into a new competition…

…the MAV will be vastly improved for 2007-2008. 1 km flight distance 500 mm longest linear dimension 500 g maximum weight GPS Sensory system Autonomous flight…stay tuned Improved video relay system Perching capability

The MAV team needs your help! Positions left: - 1 more ME for flight testing/aero structures - 2 EE’s (subject to change) for controls and component integration - 1 CE (subject to change) for hardware/software integration

Recruitment has already begun… RIT MAV wants YOU!!!

Help RIT lead the way into the future

The Beginning is only the start…

Are YOU ready for the future?