LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
1.Escalator (wood, grease) 2.One of: stainless steel escalators, cleaned mechanisms, sprinklers installed, smoke and fire alarms, smoking bans. 3.Pump.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
AUTOMOTIVE COOLING SYSTEMS
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
Electricity and Magnetism
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
ZMQS ZMQS
Photo Composition Study Guide Label each photo with the category that applies to that image.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
ABC Technology Project
Mental Math Math Team Skills Test 20-Question Sample.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
© S Haughton more than 3?
15. Oktober Oktober Oktober 2012.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Twenty Questions Subject: Twenty Questions
 Review of Servicing Initiative Mandate  Sanitary Sewer Concept  Storm Sewer Concept  Water Main Concept  Principles of A Joint Servicing Agreement.
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Chapter 5 Test Review Sections 5-1 through 5-4.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
Number Bonds to = = = = = = = = = = = 20.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Presentation transcript:

LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were replaced during long shut-down. The remaining 20 will be replaced whenever possible - coordinate with cavity rework schedule. All valves and unions are on hand Remaining Stations: 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 Booster Bus LCW Strainer and Isolation Valve Replacement. – Remove existing Y-strainers and replace with basket strainers at wall opposite beamline Strainers at 6 locations have been installed: 1, 3, 6, 7, 13, & 19 Basket strainer and parts for the remaining 7 locations have been purchased and will be installed when possible. 9/26/2012D. Hixson1

LCW Upgrades Update 9/26/2012D. Hixson2 Old Valves at 03 & 04 New Valves at 03 & 04 Booster Cavity LCW Isolation Valve Replacement

LCW Upgrades Update 9/26/2012D. Hixson3 Old Strainer & Valves at 07 New Strainer and Valves at 07 Booster Cavity LCW Strainer & Isolation Valve Replacement

LCW Upgrades Update Finish connection of LCW Return piping in East and West Booster Galleries to LCW Return piping at CUB. – $128,800 Fixed Price Contract plus $9,839 change order for additional work with Voris Mechanical – All work was completed at the end of August LCW Return Pump at CUB – Remove northern most old, existing return pump, and install previously purchased pump, and relocate valves to allow return pump isolation. – FESS T&M Contract with SEA, ~ $45,000 – Work is in progress and should be complete by Friday? 9/26/2012D. Hixson4

LCW Upgrades Update 9/26/2012D. Hixson5 Old North LCW Return Pump New Pump – Install in Progress LCW Return Pump at CUB

LCW Upgrades Update Install LCW Isolation Valves in CUB Utility Tunnel – FESS T&M Contract with SEA ~ $18,000 – Work is complete EDWA Magnets – Repipe EDWA magnet coils in parallel instead of in series – Work is in progress Remove LCW Piping for Long 13 New Absorber – Remove sections of 95LCW piping and cap – Remove sections of 55LCW Supply and Return – Work is complete Some minor adjustment of the vertical alignment of the 95 LCW piping may still be required 9/26/2012D. Hixson6

LCW Upgrades Update 9/26/2012D. Hixson7 New Valve in LCW Return from Enclosure New Valve in LCW Supply to Enclosure LCW Enclosure Isolation Valves in CUB Utility Tunnel

LCW Upgrades Update 9/26/2012D. Hixson8 Removed 55 LCW and Capped 95 LCW Removed 55 LCW and 95 LCW Remove LCW Piping for Long 13 New Absorber

LCW Upgrades Update Miscellaneous LCW Work – Magnet bus hose fittings for drainage – Repair Choke leaks and Choke Tubing – Remove Candy Cane Stop-Cocks and plug – Replace Long 3 LCW Hoses – Replace 400 MeV LCW hoses up chute – Install LCW bypasses at return valves in the Galleries – Work above is complete 9/26/2012D. Hixson9

LCW Upgrades Update Booster Refill, Leak Testing, Commissioning and Balancing – Booster LCW is in the process of being refilled – Need to do leak checking – Need to do flow and pressure balancing 9/26/2012D. Hixson10