LADWP WATER SYSTEM CAPITAL PROGRAM UPDATE July 25 th 2013.

Slides:



Advertisements
Similar presentations
Un percorso realizzato da Mario Malizia
Advertisements

Foothill MWD Preliminary Budget Presentation May 20, 2013.
INVESTMENTS IN POWER SECTOR
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
ABENGOA SOLAR Solar Power for a Sustainable World Past, Present, and Future of Solar Thermal Generation Bruce Kelly Abengoa Solar, Incorporated Berkeley,
China: Water Management and Accounting Project May 22-24, 2006 Hague.
We need a common denominator to add these fractions.
CALENDAR.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
1 1  1 =.
1  1 =.
FLORIDA DEPARTMENT OF CORRECTIONS Legislative Budget Request for FY Charlie Crist, Governor James R. McDonough, Secretary.
Welcome to Who Wants to be a Millionaire
1 A B C
PLIVA, a Member of the Teva Group Tihomir Oreskovic
The Farm Bill 2013 Land Values Conference ISPFMRA Nick Paulson University of Illinois.
Division- the bus stop method
Operating Plans and Rates
California Water Balance. Water Reserved for the Environment.
Water Distribution Systems – Part 1
Jobs, Innovation and Our Water Future
SOUTH ORANGE COUNTY REGIONAL RECYCLED WATER Orange County Business Council Infrastructure Committee May 13, 2014.
Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant.
South Asian Conference on Sanitation (SACOSAN IV) By: Ms. Shaheeda Adam Ibrahim Director General Water and Sanitation Department Ministry of Housing and.
The Metropolitan Water District of Southern California May 30, 2013.
Mojave Water Agency: How we are trying to avoid our own liquidity crisis Kirby Brill General Manager, Mojave Water Agency Business Development Association.
City of San Diegos Water and Energy Nexus World Resources Simulation Center September 22, 2010 George J. Adrian, PE Public Utilities Department Long-Range.
Integrating Water Management The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water.
August 25, Regional Water Wholesaler to 6 counties 5,200 square miles 26 Member Agencies ~19 million residents Regional economy: $1 trillion Retail.
Look at This PowerPoint for help on you times tables
Infrastructure Replacement Programs Cheryl Norton President Kentucky American Water Lexington, Kentucky.
1 Proposed User Rate Adjustments March 11, 2008 Kathleen Gammell Director of Public Works Operations Evaluation.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Princeton Wastewater Servicing Study
Filling and Wrapping Review Sheet
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
FM Area Diversion International Legislators Forum June 27, 2014 Keith Berndt PE Cass County ND Administrator.
Water Management of Turtle Lake Watershed Sept 29, 2007 by Don Dill.
FY BUDGET REVIEW Mayor Dwight C. Jones Byron C. Marshall, CAO.
Least Common Multiples and Greatest Common Factors
Central Coast Water Authority FY 2009/10 Preliminary Budget.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
CAP CAVSARP: Clearwater Facility. CAP (Central Arizona Project) In 1980, Arizona overdraft: 2.5 million acre feet year (afy) groundwater deficit due to.
Subtraction: Adding UP
Hellgate Elementary K-8 into a K-12 School District: A Possibility? MCPS - Potential Bond Issue Facility Costs… November 19, 2014.
& dding ubtracting ractions.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Presented by: Ronald O. Nichols LADWP General Manager
Main San Gabriel Basin Management BASIN REPLENISHMENT by Anthony C. Zampiello San Gabriel Valley Water Forum Presented August 28, 2012 SAN GABRIEL VALLEY.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Water Research Foundation Workshop: Benchmarking April 23, 2015.
1 Investing in your water … investing in your future California American Water General Rate & Conservation Case Applications.
Citizens’ Academy Kathy Viehe GRU Interim General Manager April 15, 2015.
1 Recycled Water Program for the City of Los Angeles.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
James B. McDaniel, Senior Assistant General Manager – Water James B. McDaniel, Senior Assistant General Manager – Water Los Angeles Department of Water.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
San Gabriel Valley From Stormwater to Supply
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Assemblymember Adrin Nazarian
Sustainable Water Infrastructure through Innovative Financing
Joshua Basin Water District Draft Findings & Rate Scenarios
Customer Outreach & Water Infrastructure
Breaking Bad: The Challenge of Aging Infrastructure
Antelope Valley-East Kern Water Agency
Los Angeles County Department of Public Works
Presentation transcript:

LADWP WATER SYSTEM CAPITAL PROGRAM UPDATE July 25 th 2013

1 Los Angeles Water System Established in 1902 Largest municipally- owned utility in the U.S. Operating Revenue = $ 1.08 billion (FY2012/13) 3.86 million customers within 473 sq. mi. service area 679,000 active metered services Service elevation from sea level to over 2,400 feet 7,225 miles of pipeline, 114 tanks & reservoirs, 78 pump stations, 421 regulator stations 340-mile long Los Angeles Aqueduct System The Los Angeles Aqueduct

2 Water System Priorities Regulatory Compliance Safe Water Supply and Compliance with Regulatory Requirements Infrastructure Reliability Sustainable Infrastructure Replacement and Upgrade Sustainable Water Supply Increase Local Supply and Protect the Environment Investments that address these priorities are interdependent and interconnected. Los Angeles Aqueduct Cascades

3 Current and Projected Capital Expenditures Next 10 years $ in millions Total $8.5B Total $484M

4 Water System Priority: Regulatory Compliance Safety of the water we provide to our customers is LADWPs #1 Priority Drinking Water Regulations Require Major Investment in Water Infrastructure – two major water initiatives: 1)Open Reservoirs: cover, replace, or provide add. treatment Regulation: Long Term 2 Surface Water Treatment Rule (LT2, April 1, 2014) 2)Chloramine Disinfection: system-wide change will reduce harmful disinfection byproducts Regulation: Stage 2 Disinfection By-Products Rule (DBP2, June 30, 2021) Failure to comply with regulatory requirements is NOT an option.

5 Shallow flooding dust mitigation Gravel dust mitigation Water System Priority: Regulatory Compliance Owens Lake Dust Mitigation Project 90% of dust is controlled and Owens Lake is no longer in the top 10 list of PM10 (dust) emissions 42 square miles of dust control in operation Over $1.2 billion spent to date in capital (since Sep. 2000); $72 million in annual O&M (including cost of replacement water) Using up to 95,000 acre-feet per year of water from Los Angeles Aqueduct

6 Water System Priority: Regulatory Compliance 2012/13 Next 10 years Capital Investment Reservoirs & Trunk Lines$ 159.0$1,337.6 Chlorine to Chloramine Water Treatment Owens Lake Dust Mitigation Total $248.4$2,040.6 Current and Projected Expenditures: ($ in Millions) Includes Water Quality Improvement Program and Owens Lake Dust Mitigation Project

7 Water System Priority: Infrastructure Reliability LADWPs Water System is large and complex Continually aging (233 miles of pipe are over a century old and 70% of pipes are more than 50 years old) Maintenance and replacement is an ongoing and continuous effort Water System Annual Leak Rate 15 leaks per 100-miles is below N. America average of 25 leaks per 100-miles of pipe Current 315-year Pipe Replacement Cycle - severely deficient of frequency required for continued reliability Our 7,200 miles of water distribution pipeline is the backbone of our delivery infrastructure – we work very hard to keep its service reliability

8 Water System Priority: Infrastructure Reliability Water Main Replacement Program

9 Water System Priority: Infrastructure Reliability 2012/13 Next 10 years Capital Investment Mainlines & Trunk Lines$ 63.2$ 1,619.6 Reservoir, Pump, & Reg. Stations Meters, Services, Hydrants Seismic, Facilities, Equip., IT, Other L.A. Aqueduct System Total $154.7$ 3,654.8 Current and Projected Expenditures: ($ in Millions)

10 Water System Priority: Sustainable Water Supply The City of Los Angeles plans to meet all new water demands through local resource development. Environmental regulatory challenges and impacts of climate change requires continued focus on four major water initiatives: 1)Stormwater Capture 2)Water Conservation 2)Water Recycling 3)San Fernando Basin Groundwater Remediation

11 Water System Priority: Sustainable Water Supply FYE 2008 – 2012 Average Total: 574,600 AFY Fiscal Year 2034 – 35 Total: 711,000 AFY LA Aqueduct 206,815 37% Local GW 64,466 11% Recycled Water 6,706 1% MWD 297,945 51% Goal is to reduce our dependence on purchased supplemental imported water by 50 percent by 2035 or sooner Charts do not reflect 100,000 AF of existing conservation

12 Water System Priority: Sustainable Water Supply 2012/13 Next 10 years Capital Investment Groundwater Management & Remediation$ 12.9$1,561.9 Water Recycling Stormwater Capture Water Conservation Total $ 81.0$ 2,750.3 Current and Projected Expenditures: ($ in Millions)