1 1 Pre Bid Conference JGB Lobby Level Meeting Room December 12, 2012 9:00 am IFB FQ12210 Rehabilitation of Parking Garages at Vienna (South), Southern.

Slides:



Advertisements
Similar presentations
Slide 1 Insert your own content. Slide 2 Insert your own content.
Advertisements

Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
Tysons 1 Tysons Corner Interim Metro Parking December 20, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 Proposal to Undertake Urgent Structural Repairs at OAS Main and General Secretariat Buildings Office of General Services / Secretariat for Administration.
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
0 - 0.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2011 Conaway Conference Structures Update.
1 Economic Trends and Commercial Construction Indicators for Metropolitan Washington Cooperative Forecasting and Data Subcommittee September 9, 2004 Department.
Components of Building Construction – Building 101 Basic knowledge of your buildings, how to maintain them and things to look for on your spring walkthrough.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Emerald Lake 2011 Annual Meeting Board of Directors Bob Carlton Larry Smith Mike Blanchard Dennis Wells Marla King Riverside – Property Management.
NOTICE SUBMISSIONS Requirements and Procedures 1.
Update on FCPS Construction/Renovation Projects May 2009.
Show Order 2 Shows 8:00 – 10:30 Weigh in 11:00 Ewes – by Weight Champion Ewe Market Classes (Hamp) Champion Drive 1:00 – 2:30 Weigh in 2 nd show (approximate.
PRE-BID MEETING AND SITE WALK D6 Hayward, Elevated Solar Photovoltaic Project 1758 Sabre Street Hayward, CA AC Transit.
Water Distribution Systems – Part 1
Introduction to composite construction of buildings
Day of the week 9:00 – 10:00 10: :00 12: :00 13: :00 14: :00 15: :00 16:00 – 17:00 17: :00 18:00 – 19:00 19:00 – 20:00.
1 Designated Historic Landmark Opened to Traffic in 1883 Construction is Scheduled Overnight Construction Limited Weekend Construction.
Elevating the Quality of Life in the District. REQUEST FOR PROPOSALS Real Estate Brokerage and Consulting Services Elevating the Quality of Life in the.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y 1 Mobility Challenges at Washington Dulles International and Ronald Reagan.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Concrete Fooring & Roofing System
Addition 1’s to 20.
New N. Atlanta High School 4111 Northside Parkway Project Overview March 25, 2010 Facilities Services Department September 20, 2011.
Test B, 100 Subtraction Facts
Week 1.
SEMESTER EXAMS & EXEMPTIONS
2 Presenter Nancy Lipscomb Director of Employee Relations & Local Government Services.
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Fill in Agency Name on Master
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.
Metro in Washington DC Presented by: –Leslie Burton –Patrycja Padlo –Michael Santangelo.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Electrical & High Temperature Utility Distribution Upgrade.
The NSOF Mark Hyde. 2 Agenda NSOF Location –Maps –Metro Shuttle to NSOF NSOF Rules –Parking –Off hours access –Property Passes –Security –Network Access.
IFB FQ15233 NEPP Electrical and Data Cabling Installation Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation.
Brentwood of Palatine Condominium Board Meeting Financials – Budget discussion Approval of Minutes / Resolutions Gate status – Alternatives pending.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
NAME OF PROJECT: Construction and Maintenance of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Mandaue-Mactan Bridge.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Redevelopment Projects & Contracting Opportunities
Washington Metropolitan Area Transit Authority (WMATA)
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
1 Semester Project Design A Multi Story Office Building
Washington Metropolitan Area Transit Authority (WMATA)
Concrete A structural material made by combining cement, sand, aggregate, and water.
Navigating Multiple Jurisdiction
Presentation transcript:

1 1 Pre Bid Conference JGB Lobby Level Meeting Room December 12, :00 am IFB FQ12210 Rehabilitation of Parking Garages at Vienna (South), Southern and Suitland

2 Topics of Discussion General Information Parking Garages Location and Description Vienna (South) Southern Suitland Typical Rehabilitation Requirements Typical Expansion Joint to Be Repaired Typical Construction Joint to Be Repaired Typical Concrete Cracks to Be Repaired Program Schedule Requirements Receipt of Written Questions Site Visit

3 General Information The Washington Metropolitan Area Transit Authority (WMATA) Parking Garages at Vienna (South), Southern and Suitland are three active commuter parking garages that serve the Washington DC Metro area stations along the K and F lines. Commuter garages have a high occupancy rate during normal business hours, Monday through Friday. Occupancy rates are much lower during the weekends. Rehabilitation work is expected to be mostly completed during the normal work week.

4 Suitland Southern Vienna (South) Parking Garages Location and Description

5 Vienna (South) Vienna (South) Parking Garage Located south of Curtis Memorial Parkway (Route 66) at the corner of Vaden Drive and Saintsbury Drive. It serves as public parking for the Washington DC Metro K Line – Vienna / Fairfax – GMU Station. Constructed in Precast and prestressed elevated structure. Slab on grade at the basement level. 5 Elevated decks. Approximate square footage is 733, 200. Vienna (South) Parking Garage

6 Southern Southern Parking Garage Located between Southern Avenue SE and Oxon Run Drive. It serves as public parking for the Washington DC Metro F Line – Southern Avenue Station. Constructed in Precast and prestressed elevated structure. Slab on grade at the ground level. One elevated deck. Approximate square footage is 580,000.

7 Suitland Suitland Parking Garage Located along Silver Hill Road and Suitland Parkway. It serves as public parking for the Washington DC Metro F Line – Suitland Station. Constructed in Precast and prestressed elevated structure. Slab on grade at the ground level. 2 Elevated decks. Approximate square footage is 600,000. Suitland Parking Garage

8 Parking Garages Location and Description Vienna (South) Parking Garage Southern Parking Garage Suitland Parking Garage N

9 Typical Rehabilitation Requirements The rehabilitation of all three parking garages consists (but not limited to) of the following: Waterproofing of all elevated decks. Replacement of expansion and construction joints. Repair of concrete spalls at top and underside of decks. Repair of concrete cracks at top and underside of decks. Replacement of bearing pads at underside of precast members. Replacement of deck drainage system. Cleaning and painting of fire lines and wash down piping. Removal and new application of striping at all parking levels. Renovation of stairwells and bathrooms. Replacement or cleaning of electrical conduits and components.

10 Typical Expansion Joint to Be Repaired Vienna (South) Parking Garage Southern Parking Garage Suitland Parking Garage

11 Typical Construction Joint to Be Repaired Vienna (South) Parking Garage Southern Parking Garage Suitland Parking Garage

12 Typical Concrete Cracks to Be Repaired Vienna (South) Parking Garage Southern Parking Garage Suitland Parking Garage

13 Program Schedule Requirements Duration – X calendar days from Notice to Proceed (including submittals, fabrication, delivery, construction & testing). Bar charts are required in Primavera Software (P6 or Compatible)

14 Receipt of Written Questions Remarks and explanations given in response to questions in this meeting shall not modify the terms of the solicitation, unless a written amendment is issued by the Authority. The Authority will send answers to questions received and distribute to bidders. The Authority will issue an amendment as required. QUESTIONS ?

15 Site Visit For Vienna (South) parking garage: When: Wednesday, December 12, 2012, from 1 P.M. to 3 P.M. Where: 9550 Saintsbury Dr., Fairfax, VA For Southern parking garage: When: Thursday, December 13, 2012, from 1 P.M. to 3 P.M. Where: 1411 Southern Avenue, Temple Hills, MD For Suitland parking garage: When: Thursday, December 13, 2012, from 9 A.M. to 11 A.M. Where: 4500 Silver Hill Rd., Suitland, MD 20746