Janet J. Li, Aakar Shah Pfizer Inc.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

SUCCESSFULLY EMBRACING CHANGES TO CDISC STANDARDS Dr. Elke Sennewald Director, Biometrics Operating Standards Group.
Issue Tracking John D. McGregor Module 10 Session 1 Issue Tracking and Risk.
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Process Standardization Project
Basics of OHSAS Occupational Health & Safety Management System
Electronic Banking Risk Assessment - Product Training
An EDI Testing Strategy Rosemary B. Abell Director, National HIPAA Practice Keane, Inc. HIPAA Summit IV April 24-26, 2002.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Linac4 Risk Assessment Criteria and Methodology. Linac4 General Meeting – C. Rossi Definitions A risk is any event that could produce a change.
Performance Improvement. 2 Steps to Performance Improvement 1. Define the Problem 2. Define Duties or Behaviors to be Improved 3. Establish Priorities.
National Center for Supercomputing Applications University of Illinois at Urbana-Champaign Developing a Comprehensive GENI Cyber Security Program Adam.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Project Status Report Presenter Name Presentation Date.
Clear Project Management Project Kick Off Project: Project Manager: Department: Date: dd mmmm yyyy Version 1.0.
Eurostat Expression language (EL) in Eurostat SDMX - TWG Luxembourg, 5 Jun 2013 Adam Wroński.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Introducing Project Management Update December 2011.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Performance Logic DSRIP Tracking Neelesh Shah, President and CEO Performance Logic, Inc. New York  Portland (888)
1 PVCS TRACKER WINDOWS CLIENT VERSION BASIC USER GUIDE Author: Joshua Spalding THE FOLLOWING SCREEN SHOTS ARE SAMPLES. THEY MAY NOT REFLECT EXACTLY WHAT.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Fall Improvement Team, Veterans Health Unit
SUS DATA QUALITY DASHBOARD
ASK MBSAQIP Agenda ASK MBSAQIP November 10, 2016 Time (CST)
On Campus Internship Work Plan Creation
Project Planning: Scope and the Work Breakdown Structure
Lesson Concept: Dot Plots and Bar Graphs
Program Management Portal (PgMP): What’s New in R8 for the Client
Risk Assessment Meeting
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Presenter name affiliation
Presenter Name Presentation Date
Presenter Name Presentation Date
Project Management Lifecycle Phases
Planning Phase: Project Control and Deliverables
Program Management Portal (PgMP): What’s New in Release 16.1
Project Risk Management
Phase 3 Tollgate Review Discussion Template
MOT Testing Service Screenshots and Notes* AEDM
Presenter Name Presentation Date
CMGT 430 Competitive Success/snaptutorial.com
CMGT 430 Education for Service/snaptutorial.com
HCS 550 STUDY Education for Service-- hcs550study.com.
CMGT 430 Teaching Effectively-- snaptutorial.com.
Duke University Health System
Kronos Timekeeper Training Guide
An EDI Testing Strategy
[Project Name] STEERING COMMITTEE UPDATE [Date]
Part 1: Editing and Publishing Files
Presenter Name Presentation Date
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
Program Status (Chart 1)
Risk Management Process (Revised)
RESOURCE MOBILIZATION Col Dr Vijay Deshpande
Welcome To The Project Website
NERC Reliability Standards Development Plan
Module 5 Improvement/upgrade plan
Skills Profiler - Manager 1 Page Guide
Project Governance Deck
Chapter 22, Part
NERC Reliability Standards Development Plan
Presenter Name Presentation Date
Presenter Name Presentation Date
Proposal on TSC policy for ONAP release Maintenance
What’s your nationality? Where are you from?
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
Company Name: Registered Number: Presentation by:
Key Activities/ Milestones
Presentation transcript:

Janet J. Li, Aakar Shah Pfizer Inc. Something Old, Something New: A little programming management can go a long way Janet J. Li, Aakar Shah Pfizer Inc.

Have you ever been in Benjamin’s, Emma’s, or Olivia’s shoes? Benjamin has been frantically searching for the most up-to-date version of his study’s SDTM and ADaM datasets. The previous study lead has already left the organization, so he can’t ask him for the whereabouts. Emma is a statistical programming manager who wished she had easier access to the status of the projects that her direct report lead Olivia is the director of statistical programming in her organization and she wishes for a high-level summary of the studies that fall under her umbrella

Project management and tracking tool Allow us to manage ourselves, others, deliverables, and timelines at study level A summary of study highlights can be pulled from individual study tracker files and be presented as an aggregate report to upper management

Study Tracker Tool Study team contact information Study files management Study highlights and deliverables Ongoing Completed Future Risk management

Study team contact information

Study files management In the highlighted example, “Study_01_SDRG” is hyperlinked to the Study 01 SDTM Reviewer’s Guide file pathname and we can see that the most current version of the SDTM Reviewer’s Guide is a draft from December 1, 2017.

Study Highlights and Deliverables

Risk Management The above table details a qualitative risk register for Study 04 Risk: identified risks are described Impact: consequence of the risk (“critical”, “high”, “medium”, “low”) Probability: likelihood of the occurrence of risk (“high”, “medium”, “low”) Risk Mitigating Actions: responses to the occurrence of the risk

Management Summary High-level summary of study highlights from the individual study tracker files Can be presented as aggregate report to upper management Built according to needs of organization/team

Aggregate Study Highlights and Timelines

Aggregate Study Highlights and Timelines We used the HIGHLOW plot statement (SG procedures, GTL) to create the aggregate study highlights and timelines Use the HIGHLOW parameter y instead of x to create the horizontal bar segments seen in the aggregate highlights & timelines report

Aggregate Risk Summary Report Overview of the risks for all studies (can be built to only show the risks that have high or critical impact as seen in the table)

Conclusion Successful implementation of this proposed project management tool The tool should be reviewed and updated on a regular basis as new information becomes available Can be updated to fit the needs of any statistical programming organization or team

Contact Information Name: Janet J. Li Company: Pfizer Inc. City/State: San Francisco, CA Email: JANET.LI@Pfizer.com Name: Aakar Shah Company: Pfizer Inc. City/State: San Francisco, CA Email: AAKAR.SHAH@Pfizer.com