UPDATE on PICS GUIDE (EG ) REVIEW

Slides:



Advertisements
Similar presentations
Live Text C1 Basics Create a Project Submit the Project for Review Check the Status of Review Read Instructor Comments.
Advertisements

WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
Special Education Student Information System Project New York City Department of Education | Special Education Student Information System Project 1 SESIS.
Header and footer basics Add page numbers, date, and more Think of page formatting in a book. The book title is at the top of one page, the chapter title.
Lesson 16 Enhancing Documents
Doc.: IEEE /0032r1 Submission January 2007 Donghee Shim et al, LG Electronics, Inc.Slide 1 Comments resolutions: Emergency call support in 11u.
Slide 1 of 39 Welcome to GSA’s Vendor and Customer Self Service (VCSS) course Section 5: Statement and Dispute Navigation This presentation is compliant.
NSF Data Management Plan Requirements Alex Kanous
Completing Your Reporting Package and Stand-Alone Financial Statements Presented by Elisa Stilwell Senior Manager - KPMG LLP KPMG LLP.
By: Erin Scott. Step One: Click on the “insert” tab located on the menu bar.
United Way Community Campaign
Doc.: IEEE /0003r0 Submission January 2013 S. Filin H. Harada, NICTSlide 1 Introduction to Contributions Notice: This document has been prepared.
TATS – View/Update Consultant Profile Department of Health and Human Services Health Resources and Services Administration HIV/AIDS Bureau.
Tracking & Review Attaching Documents, Proposal Review, and Submission Office of Grant & Contract Services 17 January 2012.
CIS—100 Chapter 7—Headers and Footers 1. Chapter Objectives 2 After successful completion this chapter you should be able to:  Add page numbers.  Add.
Student Support Team: Microsoft Word Formatting - TOC and Pagination Presenter: Natalie Medellin Sr. Student Support Coordinator Summer Residency - Denver.
Formatting Tables with Styles To format a table: – Click in the table and then click the Table Tools Design tab – In the Table Styles group, click the.
Technical Overview. Project Overview Document Library Document List Index TransmittalsPlanning.
Chapter 3 Memos.
By Soni Bal & Carol Chu. Over 400 participants, most were parents and coaches More than 95% use the website Majority of people use the website every few.
Prepared by the Academic Faculty Members of IT. Tables Creating Tables. Merging Cells. Splitting Cells. Sorting Tables. Performing Calculations.
EDOS Workgroup Update Laboratory Orders Interface Initiative.
Module 6 ********* Data Loading Workforce Information Database Training Last update November 2006.
Employee Detail Tab. Employee Detail – Position Descriptions.
1 Voucher Management System Changes – – Tabular Form layout – Consolidated like items on same tab – Aligned UML and HAP on same row for easier input –
Applying References and Hyperlinks
FITS Birds of a Feather Session ADASS Meeting London, U.K. Monday 24 Sept :30 – 9:00 pm.
SECURITY SIG IN MTS 02 ND OCTOBER 2013 PROGRESS REPORT Fraunhofer FOKUS.
CPLTA – ONLINE CREDIT TRACKING SYSTEM
Quick Info Tables: Unsubmitted Transactions Transactions with Alerts
TOP project – STATUS UPDATE & Workflow demo
Your Name Proposal Creation Module 5 Your Name
EPME Course Applications Toolkit
Supplier Performance Management (SPM): Create an SPM Project
Lesson 16 Enhancing Documents
Texas Assessment Management System Student Directory and Send Files
ERC/REC in EFIS 59th SRD/MG meeting Vienna, August 2013
Ariba Contracts: Amend a Contract Workspace
Tissue Types in the Human Body
GO! with Microsoft Office 2016
Formats for long term signatures
Service Specification Framework
FedEx Billing Online (FBO) Non-Revenue Quick Guide
Boeing Supply Chain Platform (BSCP) Detailed Training
NITS Application Detail
Advanced Invitations.
WP29- Doc 343 web-based application
Draft ETSI TS Annex C Presented by Michał Tabor for PSD2 Workshop
Add Commission and date Sept 17, 2018
Revision of EG CTI October 2013
PLEASE DELETE THIS SLIDE WHEN YOUR PRESENTATION IS COMPLETE
TOP project – status update for mts#72
Security SIG#7 in MTS 18th January 2013 draft Agenda
<month year> doc.: IEEE < e> <May 2018>
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
<month year> doc.: IEEE < e> <May 2018>
Introducing 11r-d0.00 Date: Authors: January 2002
IEEE MEDIA INDEPENDENT HANDOVER DCN:
UPDATE on SVN & MANTIS Upgrade
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Revision of EG CTI October 2013
UPDATE on PICS GUIDE (EG ) REVIEW
The ETSI Standardisation Process
UPDATE on SVN & MANTIS Upgrade
UPDATE on how TDL-TO is used at ETSI
UPDATE on SVN & MANTIS Upgrade
How to write world class standards
PIE Planning & Resources
Writing Technical Reports
UPDATE on PICS GUIDE (EG ) REVIEW
Presentation transcript:

UPDATE on PICS GUIDE (EG 201 059) REVIEW ETSI CTI January 2014 Presented by S.MULLER for MTS#61 © ETSI 2013. All rights reserved

Status Update for MTS#61 Review of Annex A and Annex X (=Template of an ICS proforma ) completed Review of Annex B and Annex Y completed Review of all other chapters of EG 201 059 completed © ETSI 2013. All rights reserved

Principal of modifications No technical changes, i.e. changes are only of editorial nature Typical changes are Prerequisite integrated with the support tables (top line) Conditional statements integrated with the support tables (bottom line) Status field update with ‘seq tab \c \*’ so that status field numbering is as the table numbering, ie, Table 55 contains o.55 fields Comments field removed. Reason: Not used so far in other PICS Format of conditional aligned from cXX to c.XX to be consistent with format of qualified optional o.XX notation Annex x.1.2 “Abbreviations and conventions” updated Fax number in contact detail section deleted © ETSI 2013. All rights reserved

Next steps Proposal to provide on editHelp page http://portal.etsi.org/edithelp/StandardsDevelopment/home.htm?page=ICSproforma The guide EG 201 058 A standalone TS ICS document To NOT provide any longer the separated annexes A and B Validate the changes -> Call for a volunteer to peer-review the modifications EditHelp to validate the changes After complete validation, to approve the EG via Remote Consensus © ETSI 2013. All rights reserved