Mount Vernon Yacht Club Long Range Projects. Projects under consideration Replace/repair bulkhead along parking lot Dredging Replace/Upgrade of C and.

Slides:



Advertisements
Similar presentations
Welcome to Who Wants to be a Millionaire
Advertisements

$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
CGU Padlock An innovative insurance solution for the Commercial Property Owner.
Set Up Instructions Place a question in each spot indicated Place an answer in each spot indicated Remove this slide Save as a powerpoint slide show.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
The Center for a Changing Workforce 1 Everyday Low Benefits: Health Insurance in the Age of Wal-Mart The Center for a Changing Workforce Seattle, WA.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
= (x + 6) (x + 2) 1. x2 +8x x2 +16x + 48 = (x + 12) (x + 4)
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
2014 Egg Industry Issues Forum. Building Excellence for over 90 years PREPARING FOR THE FUTURE!
Public Meeting to Review Proposed Four Seasons Agreement Between QAC Commissioners and K. Hovnanian September 17, :00 pm Kent Island High School.
Renovate Without Increasing Your Monthly Payments. This seminar will explain how to finance renovation costs without creating a new monthly payment.
HUGHES STADIUM ANALYSIS
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
S T A N D A R D S AS/NZS :1994 Specifications for rainwater goods, accessories and fasteners Part 1: Metal shape or sheet rainwater.
INVENTORY AND OVERHEAD
Good Loading Practices Carrier Transicold and PLM Trailer Leasing.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Slides prepared by JOHN LOUCKS St. Edward’s University.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
CP2073 Networking Lecture 5.
Why a Bus Fee Increase is Needed Texas States current bus contract expires the end of fiscal year 2014 (August 2014). – 10 year bus contract plus one extension.
Analyzing Transactions
IAS 11 - Revenue recognition for construction contracts
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
ESLS 04 Daresbury Laboratory
Substation L1/ MCC L1 Update March 21 st, Current Location.
Chapter 15 Options Markets.
2013 LID LIFT PRESENTATION. OBJECTIVES DISCUSS ESTABLISHED PROGRAMS. DISCUSS CURRENT CHALLENGES THE DISTRICT IS FACING. PROPOSED PLAN TO OVERCOME DISCUSSED.
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Capacity and Constraint Management
Capacity and Constraint Management
Fire Tax Remains at.505 Mills 2013 Fire Tax Remains at.505 Mills 2014 Fire Tax Increases to.655 Mills Increase of.15 Mills on the Fire Tax ($15.
Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
Airfield Lighting Designs Salt Lake City International Airport
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
March CFR Part 24 Subpart D Moving Costs and Related Expenses.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Report to Council, November 3, Sewer User Rate Increase October 6, 2008 City council set a public hearing to consider adopting a resolution amending.
1 Town of Colchester FY 12 Budget. 2 Current Financial Challenges Vermont and the nation are coming out of a recession Expenses rarely go down.
2006 USL Load Data Study Presentation to EB Unmetered Load Working Group Stan But January 18,
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Stakeholder Meeting for Focused Feedback February 10, w-swrule2-05.
Stakeholder Meeting for Focused Feedback February 10,
City Council Meeting Agenda Items October 28, 2013.
Equal or Not. Equal or Not
Technology Services Strategic Plan for Operational Efficiency
Slippery Slope
JEOPARDY.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
THIS IS Jeopardy.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Look at these sequences. What is happening? 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 10, 20, 30, 40, 50, 60, 70, 80, 90, , 200, 300, 400, 500, 600, 700, 800,
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
1. 2 Briefing Purpose To provide an update of the existing condition of the Portsmouth Seawall and to indicate the status of future projects.
Waterfront & Boating Access Summit Marina Projects October 14, 2006.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Kamran Marashi, P.E., S.E. Jim Schettler, P.E., S.E.
Presentation transcript:

Mount Vernon Yacht Club Long Range Projects

Projects under consideration Replace/repair bulkhead along parking lot Dredging Replace/Upgrade of C and D Docks – Include upgrade of electric for E Dock Resurface parking lot, driveway

Bulkhead Linear Feet

Bulkhead – Possible Soil Loss

Bulkhead – Sheeting Old, deteriorating sheeting – 25+ years old – 2x10 – Rotting?

Bulkhead – Sheeting

Bulkhead Replace or Repair Two experts recommend replacing entire bulkhead – Cost estimates range from $400/ LF and up – There are 450 linear feet of bulkhead ($180k) – Permitting could get extensive and expensive Three experts recommend replacing only the sheeting – Replace all sheeting with 3x10 boards ($90k) – Piles, whalers (Cross timbers) and tie rods are in good shape – Permitting should be simple – do job gradually as a repair MVYC expert (Ricky) recommends replacing only the bad sheeting – Do it as normal maintenance – no permitting – In-house project, a few hundred dollars at a time – We will investigate these options over the summer

Bulkhead Replace or Repair PROJECTCOSTALTERNATE APPROACHESCOST Bulkhead replacement180,000Bulkhead sheeting only90,000 Engineering & permits5,000 Engineering & permits0 Total185,000Total90,000

Dredging Need to establish maintenance level for future dredging Need to start permit process now – 6 months to 1 year to obtain permit – Permit process will be more difficult from 2013 on – Economical disposal of spoils until end of 2012 Dont think VMRC will exercise jurisdiction over man- made boat basin Army Corps of Engineers approval may be uncomplicated Fairfax County permit process is unknown Team has been organized to apply for permit

Dry Marina – January 2006

Dredging – Estimated Costs Dredging200,000 Engineering/ permit fees 10,000 Total210,000

C & D Docks + Electrical for E Dock

C Dock

Finger Pier – C Dock

C Dock Electrical Service

D Dock

E Dock

New Pedestals for C, D and E Docks Provide electrical and water service

C Dock Layout

D Dock Layout

C & D Docks + Electrical for E Dock Considerations: Complete replacement of C&D a significant outlay ($186k) Need longer fingers plus more piles to accommodate medium- sized boats on south side of C Dock Main decking 6 years old – At a minimum finger piers need replacing on both docks Need updated electrical and plumbing – Add pedestals for C Dock (8), D Dock (1), E Dock (4) – Install new Dominion Power 200 amp panel for C and D docks – Install electrical service from new panel to C and D Docks Feed E Dock from house panel – Connect pedestals to electric and water sources Could be a lengthy permit process

C & D Docks plus E Dock Electrical C & D Dock ReplacementC & D Dock Upgrade Remove and dispose existing * 5,000 Remove and dispose existing 1,000 Docks and piles installed 115,000 Finger 20/SF 14,500 Piles $450** 5,400 Electrical installation 24,000 Electrical installation 24,000 Electrical Hook up & Water install 5,000 Electrical Hook up & Water install 5,000 Pedestals: 12 dual, one single 9,000 Pedestals: 12 dual, one single** 9,000 Engineering/permit fees 4,000 Electrical permit fees 0 Total 162,000 Total 58,900 15% 24,300 20% 11,780 Total C & D Dock 186,30070,680 * 2005 cost for A & B Docks $32,500 ** Could be fewer piles and pedestals PROJECTCOSTALTERNATE APPROACHESCOST

Parking Lot/Driveway resurfacing Should be done, but only after heavy equipment work is finished on site – Dredging – Bulkhead work – Material delivery for C & D

Parking Lot/Driveway resurfacing

Driveway-Repair, repave75,000

Project Capital Cost Summary Min Max Bulkhead – repair/replacement $ 0 - $ 90,000 $185,000 Dredging 210, ,000 C & D Dock repair/replace 71, ,000 Parking lot resurfacing 75,000 75,000 Totals $356,000 - $446,000 $656,000

Recommended sequence Depends on approaches, but in general: 1.Beging Dredging effort – Apply for dredging permit now – Permit process will be more difficult from 2013 on – There is a time constraint on economics of spoils disposal (end of 2012 calendar year) 2.Bulkhead repair/replace – investigate extent of problem 3.C & D Dock repair/replace, + electrical service for E Dock – Set panel and run new electric service for C, D and E Docks (Could be done at any time) 4.Resurface parking lot after all heavy equipment work for dredging, bulkhead and dock work is finished