Gattini Detector Installation

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

J.P. Langston Brake Retrofit
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:
Manual Flo-tap Installation Instructions
Servicing Welch DRYFAST ULTRA Pump Models 2032
Service Training PV Series 42 PVplus
Optical Manufacturing Solutions 1 Probe Assembly.
ModICE Modular Integrated Connector Enclosure
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Installation. Indoor Unit Installation Typical Installation.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Click on this image to open the full PDF document.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
ATLIER FRANCOIS (COMPRESSOR). MAINTENANCE AND CHECKS DAILY CHECKS DAILY CHECKS INSPECT AND NOTE THE OIL LEVEL AND ALL THE PRESSURE AND TEMPERATURE LEVELS(FILLL.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
Ion source maintenance on the MAT 253
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Installation. Indoor Unit Installation Typical Installation.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
Disassemble, Assemble and Perform a Function Check on the M9
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
SQXF Shell & Yoke Assembly Procedure
Installation. Indoor Unit Installation Typical Installation.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Welcome to KALLER International Distributors Meeting June 14-16, 2011 Workshop 7 Flange Strippers Hose-less Baseplate Hose systems.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
FCM PROCESS REVIEW(ASSEMBLY PART)
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
STEP 1: ASSEMBLE ANGLE PLATES
FCM PROCESS REVIEW(ASSEMBLY PART)
Annex 5 - Tower and Lock installation
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
ModICE Modular Integrated Connector Enclosure
Tool Assembly Procedure
Easy-Cliner Manual Cable Version Assembly Instruction
826YD 21/2”-10”.
STEP 1: ASSEMBLE ANGLE PLATES
Test box for ProtoDUNE SP – Integration Test
iSHELL Design Review Cryostat & Optics Bench
Activity 2.2.1a Action Reaction Construction Guide
CL4NX +Dispenser (KITTING MANUAL)
6. Disassembly & Reassembly
Valve Manifold Assembly/Disassembly
HYBRID COOKTOP.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
4D-100, 4D-600 2½”- 10”.
909 21/2”-10”.
880V 21/2”-10”.
Installation guide for CX3 RG 7/11 compression connectors
WASP Science CCD Assembly Fixture No Guiders
Reader Swap out Guide.
US-HiLumi – Shipping Post Assembly Status
450DA 4”-10”.
Presentation transcript:

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Alex Delacroix Roger Smith 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 1a: Step 1b: Press Fit the 2X Dowel Pins Item 2 into the Housing Item 1 Insert the Springed filter holder Item 3 into the Housing 1 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 1d: Install the Filter Holder Baffle Item 6 onto the Housing Item 1, using 6X Screws and washers Item 7 & 8. Step 1e: Install the Second Filter Cushioning Ring Item 4 into the Housing Item 1 Step 1d: Install the Filter Item 5 into the Springed Fingers Item 2 Step 1c: Install the First Filter Cushioning Ring Item 4 into the Housing Item 1 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 2: Install the Fuse Item TBD onto the Detector Mounting Plate Item 9, using 1X Screw and washer Item 7 & 12. Torque to 0.5 Nm. Install the Heater Item 11 onto the Detector Mounting Plate Item 9, using 1X Screw and washer Item 7 & 12. Torque to 0.5 Nm. Install the Temperature Sensor Item 10 onto the Detector Mounting Plate Item 9, using 2X Screws and washers Item 7 & 12. Torque to 0.5 Nm. 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 3a: Insert the Detector Connector – PCB Assembly Item 22 into the Detector Cold Plate Item 13, leaving the Connector side protruding 14mm. Fill with Armstrong A12 Epoxy per TBD procedure. 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 3b: Install the 3X Detector Mount Flexure Item 15 on the Cold Plate Item 13, using 2X Lock Washer Item 7 and 2X Shoulder Screw Item 16. 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 3c: Install the Detector Mount previously assembled on the 3X Detector Mount Flexure Item 15, using: Step 3d: Verify the Assembled dimension: 3X Shoulder Screws Item 21 3X Belleville washer Item 20 3X Phenolic washer Item 19 3X Insulating Sleeve Item 18 3X Insulating Spacer Item 17 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 4a: Secure the rotation stage in the vertical position and install the Detector housing as completed in the assembly Step 3, using 3X M4—0.7 x 14MM Lg screws 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 4b: Install the 2X Guide rods on the detector and feed them thru the Cold plate. 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 4c: Install the central nut, finger tight. Remove the lower Guide rod. 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 4d: Install the lower nut. Remove the last Guide Rod Install the last nut, finger tight. 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 4e: Torque all 3 nuts to TBD N.m 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 5a: Step 5b: Install the Detector Housing Assembled in Step 1 on the Horizontal Stage - Rotate and lock the rotation Stage to horizontal position 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 5c: Slide the Horizontal Stage under the Detector Assembly 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 5d: Lower the Detector Assembly into the Housing Assembly: 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 5e: Install and torque the 9X Belleville washers Item 27 and the 9X Vented SHCS, M4-0.7 X 10mm Lg, Item 28: 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 Step 5f: Install the Cold Plate Cover Item 29, the 7X Belleville washers Item 7 and the 7X Vented SHCS, M4-0.7 X 10mm Lg, Item 30: 5/3/2019 REVISION 0

Gattini Detector Installation PROCEDURE GATPAL-ABA-P00 (See Assembly Drawing GATPAL-ABA-AA0 for detailed parts list) Step 6: Remove the 3X M4—0.7 x 14MM Lg screws Lift Clear the Rotation Stage While holding the Detector Housing Assembly, open the jaws. Remove the Detector Assembly from the Jaws. 5/3/2019 REVISION 0