Workforce / Students / Tasks

Slides:



Advertisements
Similar presentations
Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection.
Advertisements

Understanding the Three-Body Nuclear System: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia For the E Collaboration.
G E n at High momentum transfer Hall A experiment - E Bogdan Wojtsekhowski, also for G.Cates and N.Liyanage Hall A collaboration meeting, June 22.
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
Why Intersession? presented to Faculty Senate Executive Committee January 23, 2013.
Workshop on N* excitations at high Q 2 with CLAS12 Page 1 Workshop on N* Excitations at High Q 2 Welcome to Participants in the Workshop on Nucleon Resonance.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
National Issues in Higher Education October 17, Anne D. Neal, President American Council of Trustees and Alumni.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
By Douglas Higinbotham. Added Cherenkov and Sieve Plate.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
SoLID review DAQ recommendations Alexandre Camsonne.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
E02-013: at high Q 2 Status of Analysis Sergey Abrahamyan Yerevan Physics Institute for the E collaboration TexPoint fonts used in EMF. Read the.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
E02-013: at high Q 2 Status of Analysis Sergey Abrahamyan Yerevan Physics Institute for the E collaboration.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Modifying the PMP (remove some GEM’s add a scintillator coordinate detector) -JJL (8/29/2012)
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
Spin Asymmetries of the Nucleon Experiment ( E07-003) Anusha Liyanage Advisor : Dr. Michael Kohl  Introduction  Physics Motivation  Detector Setup &
Spin Asymmetries of the Nucleon Experiment ( E07-003) Proton Form Factor Ratio G E /G M from Double Spin Asymmetry with Polarized Beam and Target Anusha.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Spin Asymmetries of the Nucleon Experiment ( E07-003) Anusha Liyanage Advisor : Dr. Michael Kohl  Introduction  Physics Motivation  Detector Setup &
BigBite Gas Cherenkov Update July 21, 2008 Brad Sawatzky (& Doug Higinbotham) ● I apologize for being out of town for this meeting – I booked my trip before.
SHMS Aerogel Detector Construction is complete
Electronics for GEM R&D at the University of Virginia
Proton Form Factor Ratio GE/GM from Double Spin Asymmetry with
The SABRE Crystals Frank Calaprice.
10/month is the present production rate 2 FTE + sporadic contributions
CMS RPC Endcap RE1 Status Report
during Fall GMp run (high current)
Physics program in Hall A for the CEBAF 12 GeV era
PREX / CREX Collaboration Meeting and Status
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
Overview of Polarized 3He Target
Yi Qiang Duke University for APS April Meeting 2009 May 4, 2009
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
Yi Qiang Duke University for SPIN 2008 Conference Oct 9, 2008
Faculty Senate Executive Committee
25.5 days at 11.0 GeV & 6.5 days at 8.8 GeV = 32 days total
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

Workforce / Students / Tasks What tasks urgently need workforce? What workforce is available? Looking for tasks?

Expected workforce availability from outside JLab for installation, testing, calibration 8 months before experiment (person-months) Faculty 47 Postdoc 22.8 Graduate students 64.5 Technician 5 undergrad 14 Total 153.3 Expected workforce availability for running shifts (if over 3 months) Faculty 13 Postdoc 9.2 Graduate students 29 undergrad 1 Total 52.2

~8 months installation/callibration/tesing ~3 months running faculty postdoc grad stu undergrad tech. other Argonne S. Riordan 0.7 1.3 Cal. State L.A. K. Aniol 3 6 CMU B. Quinn 4 8 Christopher Newport P. Monaghan 5.5 11.5 Glasgow J. Annand 1 0.5 Hampton M. Kohl 0.8 Idaho State M. Khandaker ? INFN/ari S. Marrone INFN/Catania V. Belini 2 INFN/Genoa P. Musico INFN/Rome E. Cisbani Norfolk State V. Punjabi NC A&T A. Ahmicouch 7 NC Central C. Jackson 1.75 0.75 James Madison G. Niculescu JLab B. Wojtsekhowski N/A U. Conn. A. Puckett U.Va. G. Cates " N. Liyanage 16 William & Mary T. Averett 1.5 Rutgers R. Gilman St. Mary's A. Sarty Stony Brook K. Kumar Yerevan A. Shahinyan 12 53 22.8 64.5 19.5 5 24.45 9.2 29 total 164.8 63.65

~8 months installation/callibration/tesing contact faculty postdoc grad stu undergrad tech. other total GEM U.Va. N. Liyanage 8 16 24 INFN/Rome E. Cisbani 1 0.5 2.5 INFN/Catania V. Belini 4 2 9 Hampton M. Kohl 0.8 3 11.8 47.3 HCAL CMU B. Quinn 6 25 U. Conn. A. Puckett Rutgers R. Gilman 0.75 1.5 3.25 36.25 GRINCH William & Mary T. Averett 14 NC A&T A. Ahmicouch 7 12 James Madison G. Niculescu Stony Brook K. Kumar Yerevan A. Shahinyan 53 BB Hodo Glasgow J. Annand Cal. State L.A. K. Aniol CDET Christopher Newport P. Monaghan 5.5 11.5 St. Mary's A. Sarty 17.5 BB Hall A postdoc Flexible Argonne S. Riordan 0.7 1.3 NC Central C. Jackson 1.75 2.75 4.75

BigBite (D.H.) could really use students to help with cable testing, re-cabling as well as DAQ testing. Who’s available???? HCal Fall 2017 / Spring 2018 Sub-assembly #1 cosmic commissioning [CMU]  JLab PMT base assembly (need ~100) [CMU]  (installation) Summer/Fall 2018 Continue cabling and tests  Install pulser distribution  What other ongoing tasks need workforce (at JLab) to have systems ready for installation Dec. 2018 (and prepare in advance for final cabling etc.) ??

Milestones Needed **SOON** for all systems (detectors, software, DAQ, …) for reply to ERR recommendations. Milestones before end of next year, with dates, indicating readiness to begin installation in hall. To: bquinn@cmu.edu (before Monday!)