1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Capital Program Oversight Committee (CPOC) May 23, 2011 Alok Saha, P.E., Program Manager, CPM Infrastructure and Facilities – Line Equipment, Shops & Yard.
1 Solicitations/Advertisements Solicitations/Advertisements
East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
NOTICE SUBMISSIONS Requirements and Procedures 1.
Environmental Commitment. 2 Our Goal..... Increase Coxs commitment to protect natural resources by enhancing our environmental impact programs, further.
Federal Reserve Bank of Boston Case Study
New York City Department of Education Charter Matching – Facilities Upgrades/ Capital Improvements – FY 2014.
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
ASHRAE Standard Aiming at 50% Energy Savings For
1 Philadelphia VA Medical Center University and Woodland Avenues A/E Emergency Generator Upgrade Building By: Nidhish Shah, PE, Arthur Armellini, PE &
Approaches to Fire Suppression in NARA Facilities: New Buildings and Renovations Ronald Noll, NCARB, AIA, CSI Real Property Branch Management Chief Space.
BIM EXECUTION PLANNING PROCESS
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Engineering III Building 40,000 gsf Completed 2002 Designed and constructed in two.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Preventative Heatstroke Cooling Shelter: ASHRAE Design Competition Andres Gomez Errick Santana Orangel Velazquez EML 4551 Ethics and Design Project Organization.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Design & Layout of Foodservice Facilities
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Chemical Engineering Department
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
HVACR116 – Trade Skills Mechanical Drawings.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Green Building Demonstration Project Adam Saling City of San Diego.
School Construction Plan Review What you need to know.
ISO OPERATIONAL CONTROL
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
FOOD ENGINEERING DESIGN AND ECONOMICS
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
California Emerging Technologies Statewide Program Dynamic Air Quality Solutions December 10, 2012.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
National Archives and Records Administration, Preparing for the Unexpected ESSENTIAL ELEMENTS: ANALYSIS.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Construction of a Transfer Station
Utility Engineers, PC.  Generation  Transmission  Distribution.
Equipment Planning and Project Consulting Technology Management.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Building Automation with System 800xA
Fort Stanwix National Monument Energy Audit Contract
Author: Nurul Azyyati Sabri
BIM EXECUTION PLANNING PROCESS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-contract Planning and Practice
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
BIM EXECUTION PLANNING PROCESS
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Maintenance at ALBA facility: Strategy for the conventional services
Technology in Architecture
FIVE PROJECT PHASES.
Construction Management Services April 16, 2018
Presentation transcript:

1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer Space and Security Management Division National Archives and Records Administration

2 Example: Project to Replace an Air Handler Limited Description and Background Info 1. Project group may be asked to procure design & construction with limited information about the project. 2. Project approved and funds provided to … Replace Air Handling Unit, AHU-2 Replace Air Handling Unit, AHU-2

3 Define the Project – Written Project Description – Written Justification for the Project Know what you are building and why from the start.

4 Establish Project Team End User Facility Maintenance ContractingTechnical/EngineeringPreservationSecurityOther

5 Example: Expanded Description Description: Remove the existing air handler serving the archival records storage area and replace it with an air handler designed to meet current environmental standards per NARA Replacement will include expansion of mechanical room B-1 to accommodate addition filtration and humidity control equipment. Justification: Air Handling Unit AHU-2 is approximately 20 years old and the 2004 building condition report indicated that it was nearing the end of its useful life. Monitoring data indicates difficulty in achieving required humidity levels. Additionally, the units standard office type filters do not provide gaseous and particulate required by NARA standards. Space restrictions in the existing mechanical room requires will likely require an expansion of the room in order to fit the new equipment. See report of environmental conditions prepared by NARA conservation staff dated 7/13/2005.

6 Expand Project Description Clarify Location/Available Space - New Space, Renovated Space, Equipment Upgrade ? - Size of Space? - Will Replacement Equipment Increase or Decrease in Size ? - Is Additional Equipment Required? - Is the Project Location Clear to All Parties? - Location Sketch?

7 Work With Project Team Expand Project Description/Design Program What Type of Space? –Records Storage: Textual/Non-textural –Artifact Storage –Exhibits –Cold Storage –Electronic Media –General Office –Building Service/Mechanical Who Will Use The Space? –Visitors, Employees, Contractors, Volunteers, Contractors –Type of Space They Need, Current & Future Needs? Limitations? –Project Budget? –Site or Location?

8 Identify Standard Design Criteria and Reference Publications: Examples … – ASHRAE – NARA §1228 Subpart K – Facility Standards for Records Storage – NARA 1571 Archival Storage Standards – Presidential Library Design Standards – Security, Maintenance, Fire Protection Standards

9 Design Criteria ENVIRONMENT – Temperature and Humidity – Air Changes Per Hour – Pressure: Positive/Negative/Neutral – Noise Control (NC rating) – Pre-Filter Requirements – After-Filter Requirements – Control: In-Room/Remote – Condition Monitoring: Recording Devices/Alarms – Particulate and/or Specialty Filtration: – Charcoal/Gas-Phase Filtration – Outside Air Requirements

10 Design Criteria RELIABILITY RELIABILITY – Is Redundancy Required? Partial or 100%? – Connect HVAC System to Emergency Power? – Is There an Existing Emergency Generator? Adequate Capacity? SPECIALTY – Dedicated Exhaust Requirements? i.e. Laboratory – Equipment Size and/or Placement Restrictions? – Compatibility With Existing Equipment and Controls?

11 Submittal Requirements – How Many Submissions? –Additional schematics or programming required? –Simple equipment replace, no schematics required? – Quality and Content of Each Submission? –Define specific requirements? – Schedule of Submissions? –When is the design needed? – How much in-house review time? – Meetings and Presentations? – Format & Number of Submissions? –Who needs review copies?

12 Submission Content Department of Veterans Affairs Examples SCHEMATIC 1 (S1): 1. Provide estimated heating and cooling loads based on floor area. 2. Coordinate estimated preliminary steam demand with steam generation designer. 3. Investigate condition and available capacity of existing utilities. 4. Provide description of tentative zoning. 5. Select three different applicable systems for life cycle cost analysis. 6. Provide a list of energy conservation measures to be used in design, and life cycle cost analysis.

13 Submission Content Department of Veterans Affairs Examples SCHEMATIC 2 (S2): 1. Provide description of HVAC systems and equipment for each functional space. 2. Provide complete life cycle cost analysis with specific recommendations and full back-up data. 3. Provide heating and cooling capacities of each functional area, and block loads for each building. 4. Indicate tentative locations and sizes of all mechanical equipment rooms, and main shafts. 5. Show block layouts of major pieces of equipment. 6. Resolve locations of louvers etc.

14 Other – Compile drawings and reports that will help the architect/engineer – Requirements to provide bid-sets and A/E assistance during bidding – Decide if A/E services are required during construction – Specific consultants required? Fire-protection engineer? Conservator? – Cost estimating requirements?

15 Design Expectations MINIMUM REQUIREMENTS FOR ASHRAE STUDENT DESIGN COMPETITION 1. Statement of subsystem criteria and goals. 2. Descriptions of how the design satisfied these criteria and goals. 3. Descriptions of how and why the final system or architectural design was selected. 4. Supporting calculations. 5. Design drawings and/or schematic flow diagrams.